User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:51, 11 December 2018 diff hist +16 m Category:612 Impact Attenuators →612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting: Per TS, the study for the effectiveness of the TMA light bar is complete and is now permanently optional instead of a "should".
- 09:27, 11 December 2018 diff hist -216 m Category:123 Federal-Aid Highway Program Per DE, updated more "oversight agreement" links
- 15:51, 10 December 2018 diff hist -209 m Main Page EPG 104.7
- 15:39, 10 December 2018 diff hist -101 m Main Page EPG 413.6
- 15:37, 10 December 2018 diff hist +961 m 413.6 Scrub Seal Treatment Per DE, restored slightly modified scrub seal guidance current
- 15:28, 10 December 2018 diff hist 0 N File:104.7 EngFac SFY 16 to 18.pdf current
- 15:28, 10 December 2018 diff hist +59 m 104.7 Scoping Estimates Per TP, updated Engineering Factors Report to SFY 2016 - 2018
- 15:24, 10 December 2018 diff hist 0 N File:104.7 Engineering Factors Report 12 to 14a.pdf current
- 13:37, 10 December 2018 diff hist 0 File:616.13.6.3 Zipper.pdf Smithk uploaded a new version of File:616.13.6.3 Zipper.pdf current
- 12:26, 10 December 2018 diff hist -56 m Main Page EPG 101
- 12:13, 10 December 2018 diff hist -1 m Category:101 Standard Forms →Design
- 12:12, 10 December 2018 diff hist -1 m Category:101 Standard Forms →Design
- 12:05, 10 December 2018 diff hist +3,959 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, added AASHTOWare Project QRGs
- 09:29, 10 December 2018 diff hist 0 m Category:1124 Sodium Chloride
- 09:29, 10 December 2018 diff hist -2 m Category:1122 Glass Beads
- 08:48, 10 December 2018 diff hist -73 m 751.22 Prestressed Concrete I Girders →751.22.3.10.1 Dimensions for Fixed or Expansion Intermediate Bents with Continuous Slab: Per BR, correction. The wrong criteria was added to this minimum.
- 12:11, 7 December 2018 diff hist -228 m 230.1 Horizontal Alignment updated link to std plans
- 11:42, 7 December 2018 diff hist 0 m 751.22 Prestressed Concrete I Girders
- 11:36, 7 December 2018 diff hist 0 m 751.24 Retaining Walls
- 11:23, 7 December 2018 diff hist 0 m 751.31 Open Concrete Intermediate Bents
- 11:10, 7 December 2018 diff hist 0 m 751.37 Drilled Shafts
- 09:49, 7 December 2018 diff hist -717 m Category:138 Project Development Chronology
- 09:47, 7 December 2018 diff hist +5 m Category:138 Project Development Chronology
- 16:17, 6 December 2018 diff hist +148 m Category:138 Project Development Chronology →Speaking of road maps...
- 16:04, 6 December 2018 diff hist -5 m Category:138 Project Development Chronology →Speaking of road maps...
- 15:58, 6 December 2018 diff hist 0 m Category:138 Project Development Chronology →Speaking of road maps...
- 15:53, 6 December 2018 diff hist +7 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.6 Close Out Procedure for External CM SharePoint Quality Management Documents
- 14:16, 6 December 2018 diff hist -33 m 133.4 Snow and Ice Control Operations →133.4.5 Safety Precautions during Snow and Ice Control
- 14:09, 6 December 2018 diff hist -31 m 130.6 Project Manager’s Guide →Value Engineering Overview
- 13:52, 6 December 2018 diff hist -32 m Category:128 Conceptual Studies →128.4 Pavement Rehabilitation Projects for Freeways
- 13:39, 6 December 2018 diff hist -261 m 127.2 Historic Preservation and Cultural Resources →127.2.8 Artifacts and Features
- 08:15, 6 December 2018 diff hist -141 m Category:123 Federal-Aid Highway Program Per DE, updated current fed hwy act link (to FAST) and updated "oversight agreement" link
- 14:31, 5 December 2018 diff hist -34 m Category:110 State and Federal Wage Rates and Other Requirements
- 14:20, 5 December 2018 diff hist 0 File:237.3 Quantities.jpg Smithk uploaded a new version of File:237.3 Quantities.jpg current
- 14:03, 5 December 2018 diff hist -4 m 106.23 Online Research Publications (Research Publications) updated link
- 13:59, 5 December 2018 diff hist -31 m 106.1 Source of Supply and Quality Requirements →Pre-Qualified Traffic Engineering Consultants for TEAP
- 13:57, 5 December 2018 diff hist -30 m Category:105 Control of Work →105.10 Inspection of Work (Sec 105.10)
- 13:57, 5 December 2018 diff hist -31 m Category:105 Control of Work →105.9.16 Public Contacts
- 13:56, 5 December 2018 diff hist -33 m Category:105 Control of Work →105.9.6 Field Checks
- 13:55, 5 December 2018 diff hist -35 m Category:105 Control of Work →105.9 Authority and Duties of Resident Engineer (Sec 105.9)
- 13:54, 5 December 2018 diff hist -32 m 104.11 Project Scoping Documentation
- 13:54, 5 December 2018 diff hist -55 m 104.10 Management Concurrence current
- 13:52, 5 December 2018 diff hist -230 m 103.1 Bid Opening and Award Process →103.1.2 Bid Opening Location
- 13:50, 5 December 2018 diff hist -30 m Category:101 Standard Forms
- 09:51, 5 December 2018 diff hist 0 m 901.10 Preparation of Plans →Table 901.10.3.3 Minimum Rigid Conduit Sizes
- 09:35, 5 December 2018 diff hist 0 m 901.10 Preparation of Plans →901.10.3 Cable and Conduit
- 16:12, 4 December 2018 diff hist +45 m Main Page EPG 127.9.2
- 16:04, 4 December 2018 diff hist +290 m 127.9 Floodplain Management →127.9.2 Process: Per Env'l, added a sentence to adhere to CFR 650.111, per FHWA request.
- 13:29, 4 December 2018 diff hist +82 m 236.16 Outdoor Advertising →236.16.15.6 Endangered Species Act: Per ODA, clarification to be in line with the Endangered Species Act
- 14:47, 3 December 2018 diff hist -1 m Category:756 Seismic Design