User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:55, 25 January 2019 diff hist +70 m Other Aspects of Pavement Design →Shoulder Surface
- 14:48, 25 January 2019 diff hist +785 Other Aspects of Pavement Design →Shoulder Surface: Per EPS, all shoulders 4 ft and narrower, and when shoulder improvements are also anticipated as part of the scope of work, will be monolithically resurfaced with the same type of asphaltic mix used on the mainline roadway.
- 14:30, 25 January 2019 diff hist +134 m 626.1 Edgeline Rumble Strips Per EPS, minor clarification to align guidance with revision to EPG Other Aspects of Pavement Design
- 10:10, 25 January 2019 diff hist 0 N File:231.2 Clear Zone Distance 2019.docx current
- 10:09, 25 January 2019 diff hist +6 m 231.2 Clear Zones
- 09:44, 25 January 2019 diff hist +263 m Main Page EPG 413.3.3
- 09:42, 25 January 2019 diff hist +858 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per EPS, re-instated delayed CM's clarification of the UBAWS Treatment policy, including identifying the proper thicknesses for UBAWS types.
- 11:11, 24 January 2019 diff hist +793 m Category:1045 Paint for Structural Steel Per Materials, updated numerous links for the Approved and Pre-qualified list
- 15:48, 23 January 2019 diff hist +4 m 413.3 Ultrathin Bonded Asphalt Wearing Surface →413.3.2 Laboratory Procedure
- 15:44, 23 January 2019 diff hist -4 m 413.3 Ultrathin Bonded Asphalt Wearing Surface →413.3.2 Laboratory Procedure
- 14:44, 23 January 2019 diff hist +46 m LPA:136.11 Local Public Agency Construction →136.11.12.1 Consultant Conflict of Interest: updated link
- 14:44, 23 January 2019 diff hist +2 m Category:134 Engineering Professional Services →134.1.4 Conflict of Interest: updated link
- 14:42, 23 January 2019 diff hist +53 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.6 Conflict of Interest: updated link
- 16:26, 22 January 2019 diff hist -857 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per EPG, delayed revision to EPG 4143.3.3
- 16:25, 22 January 2019 diff hist -263 m Main Page Per EPG, delayed revision to EPG 4143.3.3
- 14:52, 22 January 2019 diff hist -17 m Main Page EPG 413.3.3
- 13:32, 22 January 2019 diff hist -25 m Category:110 State and Federal Wage Rates and Other Requirements updated links
- 12:23, 22 January 2019 diff hist +857 m 413.3 Ultrathin Bonded Asphalt Wearing Surface →413.3.3 Maintenance Surface Treatment: Per CM, clarification of the UBAWS Treatment policy, including identifying the proper thicknesses for UBAWS types.
- 11:25, 22 January 2019 diff hist -13 m Category:110 State and Federal Wage Rates and Other Requirements Per Commission, updated link
- 09:12, 22 January 2019 diff hist +30 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report
- 15:54, 18 January 2019 diff hist +230 m Category:101 Standard Forms →Quick Reference Guides (QRGs): Per CM, duplicated links in AWP for greater convenience
- 09:41, 18 January 2019 diff hist 0 N File:Figure 903.2.26.1 2019.jpg current
- 09:40, 18 January 2019 diff hist -4 m 903.2 Extent of Signing →903.2.26 Location Standardization (MUTCD Section 2A.16): Per TS, updated Fig. 903.2.26.1 to coordinate with std plans
- 08:52, 18 January 2019 diff hist +6 m LPA:136.6 Environmental and Cultural Requirements
- 08:51, 18 January 2019 diff hist +3 m LPA:136.13 LPA Policy Changes
- 08:51, 18 January 2019 diff hist 0 N File:136.6.3 Jan 18 2019.docx
- 08:50, 18 January 2019 diff hist +3 m LPA:136.12 Figures, Glossary and Other Useful Links
- 08:06, 18 January 2019 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links
- 08:06, 18 January 2019 diff hist +8 m LPA:136.6 Environmental and Cultural Requirements
- 08:05, 18 January 2019 diff hist 0 N File:136.6.3 Jan 2019.docx
- 08:04, 18 January 2019 diff hist +4 m LPA:136.13 LPA Policy Changes
- 14:19, 17 January 2019 diff hist -17 m LPA:136.13 LPA Policy Changes
- 14:10, 17 January 2019 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures
- 14:09, 17 January 2019 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links Per BR, updated Fig. 136.3.19, Current BEAP Consultant List and Fig. 136.3.20, BEAP Project Tracking Form
- 12:30, 17 January 2019 diff hist 0 N File:Fig.136.3.20 2019.docx
- 12:29, 17 January 2019 diff hist 0 N File:Fig.136.3.19 2019.pdf
- 12:27, 17 January 2019 diff hist -8 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.19, Current BEAP Consultant List and Fig. 136.3.20, BEAP Project Tracking Form
- 10:30, 17 January 2019 diff hist +1 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): updated link
- 13:29, 16 January 2019 diff hist +271 m LPA:136.3 Federal Aid Basics →136.3.12.4.1 Federal Law: updated links
- 12:09, 16 January 2019 diff hist +71 m Category:900 TRAFFIC CONTROL
- 11:56, 16 January 2019 diff hist +7 m Category:101 Standard Forms →Construction and Materials: updated link
- 09:30, 16 January 2019 diff hist +120 m LPA:136.13 LPA Policy Changes Fig. 136.6.3
- 08:45, 16 January 2019 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Updated Fig. 136.6.3
- 08:44, 16 January 2019 diff hist 0 N File:136.6.3 2019.docx
- 08:35, 16 January 2019 diff hist +10 m LPA:136.6 Environmental and Cultural Requirements Per LPA, updated Fig. 136.6.3, Environmental/Cultural Resources Compliance Checklist
- 15:43, 15 January 2019 diff hist -1 m Category:403 Asphaltic Concrete Pavement
- 15:41, 15 January 2019 diff hist +1 m Category:403 Asphaltic Concrete Pavement
- 15:39, 15 January 2019 diff hist -8 m Category:403 Asphaltic Concrete Pavement Per CM, updated document "QAQC Questions and Answers"
- 15:23, 15 January 2019 diff hist +147 m LPA:136.13 LPA Policy Changes EPG 136.2
- 15:22, 15 January 2019 diff hist -471 m LPA:136.2 Certification and Training Per LPA, updated NHI course listing