User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:10, 20 May 2019 diff hist 0 LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.3 Migratory Birds
- 08:05, 20 May 2019 diff hist 0 File:136.6.4.5.2.1.jpg Smithk uploaded a new version of File:136.6.4.5.2.1.jpg current
- 07:59, 20 May 2019 diff hist 0 N File:136.6.4.5.3.2.1.jpg current
- 07:58, 20 May 2019 diff hist 0 N File:136.6.4.5.3.2.jpg current
- 07:58, 20 May 2019 diff hist 0 N File:136.6.4.5.3.jpg current
- 07:57, 20 May 2019 diff hist +5 LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 07:55, 20 May 2019 diff hist 0 N File:136.6.4.5.2.1.jpg
- 07:53, 20 May 2019 diff hist 0 File:Fig. 136.6.18.pdf Smithk uploaded a new version of File:Fig. 136.6.18.pdf current
- 07:49, 20 May 2019 diff hist 0 N File:Fig. 136.6.19.pdf current
- 07:34, 20 May 2019 diff hist 0 N File:Fig. 136.6.18.pdf
- 07:29, 20 May 2019 diff hist +6,782 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, clarified T&E process and added new (but currently used) guidance about migratory birds
- 12:28, 17 May 2019 diff hist -1 m LPA:136.6 Environmental and Cultural Requirements
- 12:09, 17 May 2019 diff hist +166 m Main Page EPG 702, EPG 751.1.2, EPG 751.36
- 11:25, 17 May 2019 diff hist +348 m 751.3 Structural Steel Design Properties Per BR, clarified pile design procedure.
- 11:17, 17 May 2019 diff hist -183 m 751.50 Standard Detailing Notes →G5. CIP Concrete Piles (Notes for Bridge Standard Drawings): Per BR, clarified pile design procedure.
- 11:12, 17 May 2019 diff hist -207 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, clarified pile design procedure.
- 11:08, 17 May 2019 diff hist +200 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, clarified pile design procedure.
- 10:47, 17 May 2019 diff hist 0 N File:751.36.4.1.jpg current
- 10:45, 17 May 2019 diff hist +24,952 m 751.36 Driven Piles Per BR, clarified pile design procedure.
- 10:42, 17 May 2019 diff hist +73 m 751.9 Bridge Seismic Design updated link
- 10:13, 17 May 2019 diff hist +10 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, clarified pile design procedure.
- 10:09, 17 May 2019 diff hist +229 m 751.1 Preliminary Design →751.1.2.32 Finishing Up Design Layout: Per BR, clarified pile design procedure.
- 10:07, 17 May 2019 diff hist +417 m 751.1 Preliminary Design →751.1.2.23 Types of Piling: Per BR, clarified pile design procedure.
- 09:27, 17 May 2019 diff hist +1,355 m Category:702 Load-Bearing Piles Per BR, clarified pile design procedure.
- 13:36, 16 May 2019 diff hist +1 m Category:138 Project Development Chronology
- 13:20, 14 May 2019 diff hist +229 m LPA:136.13 LPA Policy Changes EPG 136.6.4.3
- 13:18, 14 May 2019 diff hist +116 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.3 Section 404 Permits for Wetlands and Streams: Per Env'l, clarified guidance to attach to RER for documentation purposes.
- 09:29, 14 May 2019 diff hist -6 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity: minor correction
- 09:13, 14 May 2019 diff hist 0 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination →901.11.1 Iso-Footcandle Diagram: minor correction
- 13:17, 13 May 2019 diff hist -100 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination →901.11.1 Iso-Footcandle Diagram: Per TS, updated link to currently existing link
- 12:54, 13 May 2019 diff hist 0 m 236.16 Outdoor Advertising
- 12:53, 13 May 2019 diff hist +100 m 236.17 Junkyards Per RW, updated link to Application for License to Maintain a Junkyard
- 12:48, 13 May 2019 diff hist +259 m 236.16 Outdoor Advertising Per RW, updated links
- 14:26, 10 May 2019 diff hist +67 m Main Page EPG 237.14.2.9
- 14:15, 10 May 2019 diff hist +1 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.9 Proposed 3D Top Surface Linear Features
- 12:59, 10 May 2019 diff hist 0 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.9 Proposed 3D Top Surface Linear Features
- 12:58, 10 May 2019 diff hist 0 N File:237.14.2.9.jpg current
- 12:57, 10 May 2019 diff hist +963 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2 Specifications for Electronic Design Data: Per CADD, new guidance for Proposed 3D Top Surface Linear Features
- 12:27, 10 May 2019 diff hist +4 m 901.10 Preparation of Plans →901.10.5 Computation of Quantities
- 08:19, 9 May 2019 diff hist -1,252 m Category:138 Project Development Chronology updated links
- 11:20, 7 May 2019 diff hist -217 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.3 Electronic Deliverables File: Per Bidding and Estimates, updated to current practice
- 10:25, 7 May 2019 diff hist +113 m 103.1 Bid Opening and Award Process →103.1.7 Advertising Projects for Bid opening and Purchasing Bidding Documents: Per Bidding and Estimates, updated to current practice as we no longer sell plans to the public
- 13:33, 6 May 2019 diff hist -12 m 153.20 Right of Way Per RW, updated to current practice
- 15:14, 3 May 2019 diff hist +17 m Help Article →Division Contacts
- 14:18, 3 May 2019 diff hist 0 m 750.7 Non-Hydraulic Considerations →750.7.2.1 Roadways with ADT > 3500: Per Mike Meyerhoff, in the third bullet, revised "Group C" to "Group B" to achieve a good product for higher ADT roads and to match with the guidance in the associated figure.
- 13:55, 3 May 2019 diff hist +60 m Help Article →Division Contacts
- 11:05, 3 May 2019 diff hist -108 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) updated links to Std Plan 616.10
- 10:59, 3 May 2019 diff hist -108 m 616.19 Quality Standards for Temporary Traffic Control Devices updated links to Std Plan 616.10
- 10:48, 3 May 2019 diff hist -118 m 616.18 Construction Inspection Guidelines for Sec 616 updated link to Std Plan 616.10
- 07:23, 3 May 2019 diff hist -16 m Help Article →Division Contacts