User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:24, 10 September 2019 diff hist +5 m Category:237 Contract Plans
- 15:26, 6 September 2019 diff hist 0 File:751.22 Closed Int Bent Diaphragms Dim Part Elevations.gif Smithk uploaded a new version of File:751.22 Closed Int Bent Diaphragms Dim Part Elevations.gif current
- 15:20, 6 September 2019 diff hist 0 File:751.22 Closed Int Bent Diaphragms Detail of Key.gif Smithk uploaded a new version of File:751.22 Closed Int Bent Diaphragms Detail of Key.gif current
- 15:18, 6 September 2019 diff hist 0 File:751.22 Closed Int Bent Diaphragms Change in Height at Fixed Bents Girder Chair Details Part Front Elevation.gif Smithk uploaded a new version of File:751.22 Closed Int Bent Diaphragms Change in Height at Fixed Bents Girder Chair Details Part Front Elevation.gif current
- 14:58, 6 September 2019 diff hist +322 m LPA:136.13 LPA Policy Changes EPG 136.11.15.2
- 14:43, 6 September 2019 diff hist +37 m LPA:136.11 Local Public Agency Construction →136.11.15.2 Change Order Approval
- 14:42, 6 September 2019 diff hist -60 m LPA:136.11 Local Public Agency Construction →136.11.15.2 Change Order Approval: Per LPA, updated LPA change order approval process to current practice. MoDOT signature included on Level 1 and FHWA review to include only PODI projects.
- 14:39, 6 September 2019 diff hist 0 File:751.22 Closed Int Bent Diaphragms Change in Height at Fixed Bents Girder Chair Details Part Front.gif Smithk uploaded a new version of File:751.22 Closed Int Bent Diaphragms Change in Height at Fixed Bents Girder Chair Details Part Front.gif current
- 14:36, 6 September 2019 diff hist 0 File:751.22 Closed Int Bent Diaphragms Change in Height at Fixed Bents Girder Chair Details Part End Elevation.gif Smithk uploaded a new version of File:751.22 Closed Int Bent Diaphragms Change in Height at Fixed Bents Girder Chair Details Part End Elevation.gif current
- 14:36, 6 September 2019 diff hist 0 File:751.22 Closed Int Bent Diaphragms Change in Height at Fixed Bents Girder Chair Details Part End E.gif Smithk uploaded a new version of File:751.22 Closed Int Bent Diaphragms Change in Height at Fixed Bents Girder Chair Details Part End E.gif current
- 14:34, 6 September 2019 diff hist 0 File:751.22 Closed Int Bent Diaphragms Chamfer & Joint Filler Section.gif Smithk uploaded a new version of File:751.22 Closed Int Bent Diaphragms Chamfer & Joint Filler Section.gif current
- 14:33, 6 September 2019 diff hist 0 File:751.22 Closed Int Bent Diaphragms Chamfer & Joint Filler Detail.gif Smithk uploaded a new version of File:751.22 Closed Int Bent Diaphragms Chamfer & Joint Filler Detail.gif current
- 13:51, 6 September 2019 diff hist 0 File:751.22 C1 Bar Type 7.gif Smithk uploaded a new version of File:751.22 C1 Bar Type 7.gif current
- 13:48, 6 September 2019 diff hist 0 File:751.22 C1 Bar.gif Smithk uploaded a new version of File:751.22 C1 Bar.gif current
- 13:47, 6 September 2019 diff hist 0 File:751.22 Bent Up Strands.gif Smithk uploaded a new version of File:751.22 Bent Up Strands.gif current
- 08:15, 6 September 2019 diff hist 0 m Main Page
- 15:25, 5 September 2019 diff hist -10 m Category:105 Control of Work
- 15:14, 5 September 2019 diff hist -37 m Category:105 Control of Work Per CM, replaced archaic "Delegation Of Authority For Approval And Execution Of Documents" with "Delegation of Authority to Sign via Digital Signature"
- 14:36, 5 September 2019 diff hist +9 m Main Page EPG 237
- 14:35, 5 September 2019 diff hist +37 m Category:237 Contract Plans
- 13:53, 5 September 2019 diff hist 0 N File:237 Design Abbreviations.docx current
- 13:51, 5 September 2019 diff hist +226 m Category:237 Contract Plans Per DE, added listing of Design abbreviations
- 13:04, 5 September 2019 diff hist -6 m 751.22 Prestressed Concrete I Girders →751.22.2.4 Shear: Per BR, minor correction
- 14:45, 4 September 2019 diff hist +149 m Main Page EPG 751.5.1 and EPG 237.13.3
- 14:28, 4 September 2019 diff hist 0 m 237.13 Contract Plan File Name Convention →237.13.3 Bridge Contract Plans
- 13:39, 4 September 2019 diff hist -447 m 237.13 Contract Plan File Name Convention →237.13.3 Bridge Contract Plans: Per BR, moved EPG 237.13.3 to 751.5.1.4 Contract Plan File Name Convention and referenced EPG 751.5.1.4 from 237.13.3. The existing EPG 751.1.4 became new EPG 751.1.7.
- 13:35, 4 September 2019 diff hist +722 m 751.5 Structural Detailing Guidelines →751.5.1 General Detailing: Per BR, moved EPG 237.13.3 to 751.5.1.4 Contract Plan File Name Convention and referenced EPG 751.5.1.4 from 237.13.3. The existing EPG 751.1.4 became new EPG 751.1.7.
- 07:35, 4 September 2019 diff hist +18 m 751.50 Standard Detailing Notes Corrected format problem
- 12:34, 3 September 2019 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3.5 Applying Engineer’s Seal to JSPs
- 09:26, 3 September 2019 diff hist +360 m 748.8 Development in Floodplains current
- 09:23, 3 September 2019 diff hist +360 m 127.9 Floodplain Management →127.9.3 Floodplain Development Permits
- 07:52, 3 September 2019 diff hist +1 127.9 Floodplain Management →127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification
- 07:51, 3 September 2019 diff hist +13 m 127.9 Floodplain Management →127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification
- 07:24, 3 September 2019 diff hist +1 m 237.6 Project Estimates →237.6.2.1 Bid History
- 15:19, 30 August 2019 diff hist -127 m 236.7 Negotiation Per RW, Property Owner Opinion Survey removed because it is no longer used.
- 15:11, 30 August 2019 diff hist +21 m Main Page EPG 103.1.8, EPG 104.7, EPG 121.7, EPG 237.6
- 15:04, 30 August 2019 diff hist -2,234 m 237.6 Project Estimates Per BCS and TP, estimate guidance was clarified to reflect current practice in estimating.
- 15:02, 30 August 2019 diff hist 0 m 237.6 Project Estimates Smithk moved page 237.6 Estimates to 237.6 Project Estimates: Per Bidding and TP
- 15:02, 30 August 2019 diff hist +37 N 237.6 Estimates Smithk moved page 237.6 Estimates to 237.6 Project Estimates: Per Bidding and TP current
- 14:56, 30 August 2019 diff hist 0 m 121.7 Program Estimates
- 14:51, 30 August 2019 diff hist +3,789 N 121.7 Program Estimates Per Bidding and TP, estimate guidance was clarified to reflect current practice in estimating. This new article is clarified info removed from EPG 104.7
- 14:18, 30 August 2019 diff hist 0 N File:Fig 104.7.docx
- 14:17, 30 August 2019 diff hist -3,430 m 104.7 Scoping Estimates Per Bidding and TP, estimate guidance was clarified to reflect current practice in estimating.
- 14:16, 30 August 2019 diff hist 0 m 104.7 Scoping Estimates Smithk moved page 104.7 Estimates to 104.7 Scoping Estimates: Per Bidding and TP
- 14:16, 30 August 2019 diff hist +37 N 104.7 Estimates Smithk moved page 104.7 Estimates to 104.7 Scoping Estimates: Per Bidding and TP current
- 14:16, 30 August 2019 diff hist 0 m Talk:104.7 Scoping Estimates Smithk moved page Talk:104.7 Estimates to Talk:104.7 Scoping Estimates: Per Bidding and TP current
- 14:16, 30 August 2019 diff hist +42 N Talk:104.7 Estimates Smithk moved page Talk:104.7 Estimates to Talk:104.7 Scoping Estimates: Per Bidding and TP current
- 14:15, 30 August 2019 diff hist -251 m 103.1 Bid Opening and Award Process →103.1.8 Engineer's Estimate: Per BCS and TP, estimate guidance was clarified to reflect current practice in estimating.
- 07:52, 30 August 2019 diff hist +12 m Where to Find PDM Information in the EPG updated link
- 11:09, 29 August 2019 diff hist +151 m Main Page EPG 127.9 and EPG 748.8