User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:46, 16 December 2019 diff hist +36 m Recent Policy Changes in the EPG EPG 136.4.1.6
- 14:41, 16 December 2019 diff hist +443 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.6 Conflict of Interest: Per LPA, added confilict of interest information pertaining to when a consultant acts as a city engineer.
- 09:16, 16 December 2019 diff hist -96 m Category:145 Transportation Management Systems (TMS) Per TP, updated contact info link
- 15:53, 13 December 2019 diff hist -96 m Recent Policy Changes in the EPG EPG 237.14
- 15:51, 13 December 2019 diff hist +330 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, guidance was updated to reflect the use of the latest design software.
- 12:06, 13 December 2019 diff hist +1 m Recent Policy Changes in the EPG
- 12:06, 13 December 2019 diff hist +173 m Recent Policy Changes in the EPG Form 806.8.2
- 11:58, 13 December 2019 diff hist 0 m Category:101 Standard Forms Per Env'l, updated form by adding a new page for REs/Inspectors to identify the BMPs that will be used on a project
- 11:57, 13 December 2019 diff hist 0 N File:Form 806.8.2 dec 2019.pdf current
- 11:57, 13 December 2019 diff hist 0 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Env'l, updated form by adding a new page for REs/Inspectors to identify the BMPs that will be used on a project
- 14:53, 12 December 2019 diff hist +157 m 236.7 Negotiation Per RW, added new MoDOT Public Participation Survey (Title VI Survey) link for externals' access
- 11:18, 12 December 2019 diff hist -71 m Recent Policy Changes in the EPG EPG 237.14.1
- 11:07, 12 December 2019 diff hist +131 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.1 MoDOT and Consultant Electronic Design Data Requirements: Per CADD, clarified EDD requirements
- 10:04, 12 December 2019 diff hist -12 m Category:134 Engineering Professional Services →134.5.3 Consultant Contract Close-Out
- 10:03, 12 December 2019 diff hist +2 m Category:134 Engineering Professional Services →134.5.1 Invoicing
- 10:01, 12 December 2019 diff hist 0 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution
- 09:59, 12 December 2019 diff hist -8 Category:134 Engineering Professional Services →134.3.4 Basis of Payment
- 09:56, 12 December 2019 diff hist +39 m Category:134 Engineering Professional Services →134.3.3 Man Hours Review
- 09:45, 12 December 2019 diff hist -4 m Category:134 Engineering Professional Services →134.3.1.2 Payment Bond
- 09:42, 12 December 2019 diff hist -41 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts
- 09:39, 12 December 2019 diff hist -95 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts
- 09:36, 12 December 2019 diff hist -41 Category:134 Engineering Professional Services
- 09:32, 12 December 2019 diff hist -32 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts
- 09:30, 12 December 2019 diff hist -30 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 09:28, 12 December 2019 diff hist +10 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 09:28, 12 December 2019 diff hist -15 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 09:26, 12 December 2019 diff hist -17 m Category:134 Engineering Professional Services →134.2.2.4 Solicitation and Selection Step 4 – Consultant Response to the Solicitation/RFQ
- 09:23, 12 December 2019 diff hist +10 m Category:134 Engineering Professional Services →134.2.2.2 Solicitation and Selection Step 2 – PM/CA to Submit Solicitation & Request Letter to PSC
- 09:21, 12 December 2019 diff hist -7 m Category:134 Engineering Professional Services →134.1.5 Suspension/Debarment
- 09:16, 12 December 2019 diff hist +3 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 09:14, 12 December 2019 diff hist -6 m Category:134 Engineering Professional Services →134.1.2 State Law
- 08:47, 12 December 2019 diff hist 0 m 460.3 Plant Inspection →460.3.13 Asphalt Binder Sampling and Test Results: minor editorial correction
- 13:42, 10 December 2019 diff hist +7 m Category:100 GENERAL
- 13:40, 10 December 2019 diff hist +21 m Category:101 Standard Forms
- 13:18, 10 December 2019 diff hist -245 m 750.6 Erosion Control and Energy Dissipation updated several std plan links
- 12:12, 10 December 2019 diff hist -1 m Category:145 Transportation Management Systems (TMS)
- 12:10, 10 December 2019 diff hist 0 N File:145 2019.jpg current
- 12:10, 10 December 2019 diff hist +47 m Category:145 Transportation Management Systems (TMS) Per TP, minor updates to replace archaic references
- 10:06, 10 December 2019 diff hist +7 236.7 Negotiation
- 10:06, 10 December 2019 diff hist +6 m 236.7 Negotiation
- 10:05, 10 December 2019 diff hist -13 m 236.7 Negotiation Per RW, updated MoDOT Public Participation Survey (Title VI Survey) link
- 13:28, 4 December 2019 diff hist 0 N File:101 Storm Water Land Disturbance Erosion Reporting QRG Dec 2019.pdf current
- 13:27, 4 December 2019 diff hist 0 N File:101 Land Disturbance Storm Water Database Initial Setup for Maintenance Projects QRG 2019.pdf current
- 13:27, 4 December 2019 diff hist 0 N File:101 Land Disturbance Storm Water Database Initial Setup for Construction Projects 2019.pdf current
- 13:27, 4 December 2019 diff hist 0 N File:101 How to Fill Out Land Disturbance Inspection Record.pdf current
- 13:26, 4 December 2019 diff hist +138 m Category:101 Standard Forms →Storm Water Database Quick Reference Guides (QRGs): Per Env'l, revised 4 QRGs due to system updates
- 10:51, 4 December 2019 diff hist -28 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated archaic "Missouri's Consultant Info tab" link to "MoDOT's Consultant Resources" link
- 15:37, 3 December 2019 diff hist 0 N File:MASH Implementation.pdf current
- 15:35, 3 December 2019 diff hist -8,430 m Main Page Per EPS, revised Main Page's appearance
- 15:32, 3 December 2019 diff hist -116 m Recent Policy Changes in the EPG EPG 751.6.2.5