User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:44, 10 February 2020 diff hist +2 m 751.40 LFD Widening and Repair →751.40.8.4.1 Welding Details
- 11:25, 10 February 2020 diff hist -1 m 751.40 LFD Widening and Repair →751.40.2.5 Temporary Traffic Control Device
- 11:20, 10 February 2020 diff hist +153 m 751.1 Preliminary Design →751.1.3.6 Deck Treatment
- 11:16, 10 February 2020 diff hist +8,367 751.1 Preliminary Design →751.1.3 Wearing Surfaces/Rehabs/Redecks/Widenings: Per BR, deck rehabilitation guidance further updated to current methods.
- 10:06, 10 February 2020 diff hist -16 m Category:409 Seal Coat updated link
- 10:01, 10 February 2020 diff hist 0 N File:751.1.2.12 Freestanding.jpg current
- 10:00, 10 February 2020 diff hist -82 751.1 Preliminary Design →751.1.2.12 Temporary Barriers
- 09:49, 10 February 2020 diff hist -1 Category:1039 Polymer Products →1039.2.4.2.1 Epoxy
- 09:41, 10 February 2020 diff hist 0 m Category:1039 Polymer Products →1039.2.2.4 Epoxy Polymer
- 15:52, 7 February 2020 diff hist +7 m LPA:136.12 Figures, Glossary and Other Useful Links Figs. 136.9.5 and 136.10.1
- 15:50, 7 February 2020 diff hist 0 N File:136.9.5 2020.docx current
- 15:48, 7 February 2020 diff hist +2 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, minor update to Fig. 136.9.5
- 15:47, 7 February 2020 diff hist 0 N File:136.10.1 2020.docx
- 15:46, 7 February 2020 diff hist +12 m LPA:136.10 Advertisement for Bid and Project Award Per LPA, minor updates to Fig 136.10.1
- 14:44, 7 February 2020 diff hist 0 m 902.15 Designing a Traffic Signal →902.15.3.2 Induction Loop Detectors: Per TS, corrected the phase for one of the channel numbers
- 14:27, 6 February 2020 diff hist +1 m Recent Policy Changes in the EPG
- 13:58, 6 February 2020 diff hist +674 m Recent Policy Changes in the EPG EPG 216, EPG 751, EPG 1039
- 13:18, 6 February 2020 diff hist 0 N File:751.1.3.6 Bridge Wearing Surface Flowchart.pdf current
- 13:18, 6 February 2020 diff hist +4 m 751.1 Preliminary Design →751.1.3.6 Asphalt Wearing Surface
- 13:17, 6 February 2020 diff hist +253 m 751.1 Preliminary Design →751.1.3.6 Asphalt Wearing Surface: Per BR, added Bridge Wearing Surface Flowchart
- 12:26, 6 February 2020 diff hist +11,432 751.50 Standard Detailing Notes Per BR, standard detailing note updated to reflect deck rehabilitation being revised to current methods
- 16:02, 5 February 2020 diff hist +2 m 751.40 LFD Widening and Repair →751.40.8.4.2.6 Development of uncoated Grade 40 deformed bars in tension, \, L_d (AASHTO 8.25)
- 14:54, 5 February 2020 diff hist 0 m 751.40 LFD Widening and Repair →751.40.3.1 Wearing Surfaces
- 14:45, 5 February 2020 diff hist +2 m 751.40 LFD Widening and Repair →751.40.3.1 Wearing Surfaces
- 14:30, 5 February 2020 diff hist 0 N File:751.40.3.1 flat thin.jpg current
- 14:15, 5 February 2020 diff hist 0 m 751.40 LFD Widening and Repair →751.40.3.1 Wearing Surfaces
- 13:54, 5 February 2020 diff hist 0 N File:751.40.3.1 flat thick.jpg current
- 13:42, 5 February 2020 diff hist 0 N File:751.40.3.1 elastomeric.jpg current
- 13:25, 5 February 2020 diff hist 0 m 751.40 LFD Widening and Repair →751.40.3.1 Wearing Surfaces
- 13:24, 5 February 2020 diff hist 0 m 751.40 LFD Widening and Repair →751.40.3.1 Wearing Surfaces
- 13:15, 5 February 2020 diff hist 0 N File:751.40.3.1 wearing surfaces.jpg current
- 13:08, 5 February 2020 diff hist 0 N File:751.40.2.5.jpg current
- 13:07, 5 February 2020 diff hist 0 N File:751.40.2.2 ABC.jpg current
- 13:00, 5 February 2020 diff hist 0 N File:751.40.2.2 ABCD.jpg current
- 12:23, 5 February 2020 diff hist +123 751.40 LFD Widening and Repair Per BR, deck rehabilitation guidance has been updated to current methods.
- 09:42, 5 February 2020 diff hist +340 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, pay items updated for monolithic deck repair to supplementary wearing surface material.
- 16:20, 4 February 2020 diff hist -24 m Category:747 Bridge Reports and Layouts
- 16:19, 4 February 2020 diff hist -13 m 751.1 Preliminary Design
- 16:18, 4 February 2020 diff hist +52 m 751.1 Preliminary Design →751.1.3.5 Structural Rehabilitation Checklist
- 16:17, 4 February 2020 diff hist -1 m Category:101 Standard Forms →Bridge
- 16:15, 4 February 2020 diff hist +4 m Category:101 Standard Forms →Bridge
- 16:15, 4 February 2020 diff hist +47 m Category:101 Standard Forms →Bridge
- 16:14, 4 February 2020 diff hist -61 m Category:101 Standard Forms →Bridge
- 16:12, 4 February 2020 diff hist +61 m Category:101 Standard Forms →Bridge
- 15:44, 4 February 2020 diff hist +3 751.2 Loads →751.2.1.1 Dead Load
- 15:24, 4 February 2020 diff hist +167 751.1 Preliminary Design →751.1.3 Overlays/Rehabs/Redecks/Widenings: Per BR, deck rehabilitation guidance has been updated to current methods. Pay items updated for monolithic deck repair to supplementary wearing surface material.
- 14:28, 4 February 2020 diff hist -30 m Category:1081 Coating of Structural Steel
- 14:26, 4 February 2020 diff hist +30 m Category:1081 Coating of Structural Steel
- 14:22, 4 February 2020 diff hist 0 N File:751.1.3.5 Structural Rehab Checklist 2020.xlsx current
- 14:22, 4 February 2020 diff hist 0 m 751.1 Preliminary Design →751.1.3.5 Structural Rehabilitation Checklist