- 07:28, 7 May 2020 diff hist -45 m Category:1180 Bituminous Stockpile Patching Material
- 07:27, 7 May 2020 diff hist +4 Category:1180 Bituminous Stockpile Patching Material
- 07:24, 7 May 2020 diff hist 0 N File:Hi 642.4.2.1.pdf current
- 07:24, 7 May 2020 diff hist +3 Category:1180 Bituminous Stockpile Patching Material
- 07:23, 7 May 2020 diff hist 0 N File:642.4.2.1.pdf current
- 07:23, 7 May 2020 diff hist +38 Category:1180 Bituminous Stockpile Patching Material
- 13:21, 5 May 2020 diff hist 0 File:751.5 corner joint.gif Smithk uploaded a new version of File:751.5 corner joint.gif current
- 13:15, 5 May 2020 diff hist 0 File:751.5 Coordinating Substructure on Tangent Alignment.gif Smithk uploaded a new version of File:751.5 Coordinating Substructure on Tangent Alignment.gif current
- 13:12, 5 May 2020 diff hist 0 File:751.5 convex contour symbol.gif Smithk uploaded a new version of File:751.5 convex contour symbol.gif current
- 09:41, 4 May 2020 diff hist 0 m Recent Policy Changes in the EPG
- 09:21, 4 May 2020 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87)
- 09:20, 4 May 2020 diff hist 0 N File:Fig 616.6.87.2.2 2020.jpg current
- 09:20, 4 May 2020 diff hist 0 N File:Fig 616.6.87.2.1 2020.jpg current
- 09:19, 4 May 2020 diff hist 0 N File:Fig 616.6.87.1.2 2020.jpg current
- 09:19, 4 May 2020 diff hist 0 N File:Fig 616.6.87.1.1 2020.jpg current
- 09:18, 4 May 2020 diff hist +20 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per TS, in Figs. 616.6.87.1 and 616.6.87.2, revised the rumble strip spacing to the manufacturer's recommendations. For speed limits 60-70, the spacing changed from 30 to 35 feet.
- 15:18, 1 May 2020 diff hist +1 147.4 Fixed Price Variable Scope (FPVS) Contracting
- 15:18, 1 May 2020 diff hist -5,873 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per EPS, article temporarily removed Tag: Replaced
- 15:07, 1 May 2020 diff hist +2 m 236.5 Property Management
- 15:05, 1 May 2020 diff hist +112 m 236.6 Appraisal and Appraisal Review
- 15:03, 1 May 2020 diff hist +20 m 236.5 Property Management →236.5.25.9 Lease/Licenses/Airspace License Agreements Submittals to Right of Way Section
- 14:43, 1 May 2020 diff hist -15 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Employee Interviews
- 14:40, 1 May 2020 diff hist +913 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, minor clarifications for guidance about contracts that include multiple projects and about employee interviews
- 14:36, 1 May 2020 diff hist +31 m Category:101 Standard Forms →Construction and Materials
- 13:59, 1 May 2020 diff hist +362 m Recent Policy Changes in the EPG EPG 236
- 13:37, 1 May 2020 diff hist +114 m 236.8 Relocation Assistance Program Per RW, added RWPA checklist
- 13:33, 1 May 2020 diff hist +111 m 236.10 Right Of Way Condemnation
- 13:32, 1 May 2020 diff hist +308 m 236.10 Right Of Way Condemnation →236.10.7.10 Recovering Damages and Fees (RSMo 523.259): Per RW, guidance for RWPA data entry and media upload requirements was added.
- 13:25, 1 May 2020 diff hist +2,080 m 236.7 Negotiation Per RW, guidance for RAI and RWPA data entry and media upload requirements was clarified
- 13:06, 1 May 2020 diff hist +502 m 236.6 Appraisal and Appraisal Review →236.6.1.1 Appraisal Reports Required: Per RW, guidance for RAI and RWPA data entry and media upload requirements was clarified.
- 13:04, 1 May 2020 diff hist +1,806 m 236.3 Administration Per RW, guidance for RAI and RWPA data entry and media upload requirements was clarified.
- 12:55, 1 May 2020 diff hist +1,096 m 236.5 Property Management Per RW, guidance for RAI and RWPA data entry and media upload requirements was clarified.
- 12:51, 1 May 2020 diff hist +904 m LPA:136.13 LPA Policy Changes EPG 136.8
- 12:41, 1 May 2020 diff hist +856 m LPA:136.8 Local Public Agency Land Acquisition Per RW and LPA, addition of guidance about documentation RW staff is to enter into the LPA SMS
- 07:20, 1 May 2020 diff hist 0 N File:409 FY May 2021 Seal Coat Plans.pdf current
- 07:20, 1 May 2020 diff hist +4 m Category:409 Seal Coat Per EPS, updated Contractor pdf files
- 07:15, 1 May 2020 diff hist 0 N File:402 CLC May 2021 Plans.pdf current
- 07:14, 1 May 2020 diff hist +4 m Category:402 Bituminous Surface Leveling Per EPS, updated Contractor pdf files
- 08:05, 30 April 2020 diff hist +283 m Recent Policy Changes in the EPG EPG 751.10.1.14, EPG 751.22.3.6.1
- 07:54, 30 April 2020 diff hist +49 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams
- 07:04, 30 April 2020 diff hist +14 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Further clarified note, per BR
- 14:54, 29 April 2020 diff hist +1,284 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, clarified hairpin bar and projecting girder reinforcement height adjustment requirements for P/S girder excessive haunch.
- 14:31, 29 April 2020 diff hist +252 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, clarified hairpin bar and projecting girder reinforcement height adjustment requirements for P/S girder excessive haunch.
- 13:35, 29 April 2020 diff hist +492 751.22 Prestressed Concrete I Girders →751.22.3 Details: Per BR, clarified hairpin bar and projecting girder reinforcement height adjustment requirements for P/S girder excessive haunch.
- 13:45, 28 April 2020 diff hist +71 m Category:724 Pipe Culverts →724.2 Definitions: Per BR, corrected definition of culvert
- 13:42, 28 April 2020 diff hist -1,835 m 750.7 Non-Hydraulic Considerations →750.7.2.7 Multiple Opening Installations: Per BR, removed duplicate info from EPG 750.7.2.7 (is already presented in EPG 750.7.4.3
- 09:26, 28 April 2020 diff hist -138 m Recent Policy Changes in the EPG EPG 108.1.4
- 09:12, 28 April 2020 diff hist +987 m Category:108 Prosecution and Progress →108.1.4 Professional Service: Per CM, new guidance for the rare occurrence of professional service contract labor
- 07:30, 28 April 2020 diff hist -124 m Category:1091 Lighting Equipment
- 07:29, 28 April 2020 diff hist +124 Category:1091 Lighting Equipment