User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:31, 5 August 2020 diff hist 0 N File:751.1.3.4 type b section.jpg current
- 08:30, 5 August 2020 diff hist 0 N File:751.1.3.4 thrie beam section.jpg current
- 08:30, 5 August 2020 diff hist 0 N File:751.1.3.4 brush section.jpg current
- 08:30, 5 August 2020 diff hist 0 N File:751.1.3.4 more than 6 section.jpg current
- 08:29, 5 August 2020 diff hist 0 m 751.1 Preliminary Design →Common Bridge Barrier and Railing (for Rehabilitations)
- 08:29, 5 August 2020 diff hist 0 N File:751.1.3.4 less than 6 section.jpg current
- 08:28, 5 August 2020 diff hist 0 N File:751.1.3.4 type d.jpg current
- 08:28, 5 August 2020 diff hist 0 N File:751.1.3.4 thrie beam.jpg current
- 08:23, 5 August 2020 diff hist +1,096 m 751.1 Preliminary Design Per BR, numerous minor clarifications related to barrier pay items
- 07:19, 5 August 2020 diff hist +22 m 751.12 Barriers, Railings, Curbs and Fences updated link
- 13:41, 4 August 2020 diff hist +109 m Recent Policy Changes in the EPG EPG 236.14.8
- 13:40, 4 August 2020 diff hist +328 m 236.14 Change in Route Status Report →236.14.8 Change in Route Marking: Per TS, archaic guidance was updated to include the Change in Route Marking Report shall be submitted to Central Office Highway Safety and Traffic for processing.
- 12:51, 4 August 2020 diff hist -117 m 902.15 Designing a Traffic Signal Updated links to standard plans
- 12:25, 4 August 2020 diff hist -373 m Recent Policy Changes in the EPG EPG 153.18
- 12:19, 4 August 2020 diff hist +11,334 m 153.19 Multimodal Per Secr. Comm, updated signature requirements for contracts
- 11:27, 4 August 2020 diff hist +1 m Help Article →Division Contacts
- 10:57, 4 August 2020 diff hist 0 N File:751.40.8.5.1.1 slab cantilever.jpg current
- 10:47, 4 August 2020 diff hist -17 m 751.40 LFD Widening and Repair →751.40.8.5.1.1 Design Criteria
- 07:48, 4 August 2020 diff hist 0 N File:751.40.5.2 section.jpg current
- 07:47, 4 August 2020 diff hist 0 N File:751.40.5.2 typical.jpg current
- 07:46, 4 August 2020 diff hist 0 N File:751.40.4.1 integral end bents proposed slab.jpg current
- 07:39, 4 August 2020 diff hist 0 N File:751.40.4.1 integral end bents existing slab.jpg current
- 07:39, 4 August 2020 diff hist 0 N File:751.40.4.1 integral end bents proposed.jpg current
- 07:39, 4 August 2020 diff hist 0 N File:751.40.4.1 integral end bents existing.jpg current
- 07:38, 4 August 2020 diff hist 0 N File:751.40.4.1 non integral end bents proposed slab.jpg current
- 07:38, 4 August 2020 diff hist 0 N File:751.40.4.1 non integral end bents existing slab.jpg current
- 07:29, 4 August 2020 diff hist 0 N File:751.40.4.1 non integral end bents proposed.jpg current
- 07:28, 4 August 2020 diff hist 0 N File:751.40.4.1 non integral end bents existing.jpg current
- 15:25, 31 July 2020 diff hist 0 N File:751.40.3.1 concrete edge repair.jpg current
- 15:13, 31 July 2020 diff hist -440 m 751.40 LFD Widening and Repair Per BR, uploaded updated figures
- 14:00, 31 July 2020 diff hist +22 m 643.2 Local Utility Adjustments - Public and Private →643.2.4 Request for Utility Adjustment Plan: Per DE, clarified guidance
- 10:00, 31 July 2020 diff hist -238 m Recent Policy Changes in the EPG EPG 153.16
- 09:40, 31 July 2020 diff hist +850 m 153.17 Medical Board Employee Benefits Per Secr. Comm, updated signature requirements for 3 contracts
- 08:52, 31 July 2020 diff hist +14 m 751.40 LFD Widening and Repair →751.40.8.9.2.4 Reinforcement - Wing
- 08:40, 31 July 2020 diff hist -43 m 751.40 LFD Widening and Repair Per BR, numerous minor clarifications related to barrier pay items
- 14:28, 30 July 2020 diff hist +10 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, minor clarification
- 12:55, 30 July 2020 diff hist +199 m 121.2 The Planning Framework for Transportation Decision-Making minor clarifications
- 12:27, 30 July 2020 diff hist +31 m Recent Policy Changes in the EPG
- 09:30, 30 July 2020 diff hist +174 m Recent Policy Changes in the EPG EPG 236.6.5.3
- 09:27, 30 July 2020 diff hist -110 m 236.6 Appraisal and Appraisal Review →236.6.5.3 Application for Employment as Contract Appraiser: Per RW, clarification in the renewal application process
- 09:08, 30 July 2020 diff hist -5 m Recent Policy Changes in the EPG EPG 903.5.21
- 09:02, 30 July 2020 diff hist 0 N File:903.5.21.1 2020.jpg current
- 09:02, 30 July 2020 diff hist +963 m 903.5 Regulatory Signs →903.5.21 WRONG WAY Sign (R5-1a) (MUTCD Section 2B.38): Per TS, updated Fig. 903.5.21.1 to current practice
- 13:22, 29 July 2020 diff hist +77 m Recent Policy Changes in the EPG EPG 237.4
- 13:18, 29 July 2020 diff hist +327 237.4 Plan-Profile Sheets Per DE, it is now permissible to not show the State Plane Coordinates on the Reference Point Sheet.
- 13:10, 29 July 2020 diff hist -114 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation Per CM, deleted the newly archaic pay item “SPEED LIMIT AND STROBE LIGHT ASSEMBLY”
- 13:05, 29 July 2020 diff hist +11 m Recent Policy Changes in the EPG EPG 121.2
- 12:59, 29 July 2020 diff hist 0 N File:121.2.4.2.jpg current
- 12:59, 29 July 2020 diff hist 0 N File:121.2.4.1.jpg current
- 12:58, 29 July 2020 diff hist 0 N File:121.2 map 2020.jpg current