User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:02, 12 January 2021 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links
- 13:57, 12 January 2021 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links
- 12:15, 12 January 2021 diff hist -205 m Recent Policy Changes in the EPG EPG 107.12
- 11:18, 12 January 2021 diff hist +5,278 m Category:107 Legal Relations and Responsibility to the Public →107.12 Contractor's Responsibility for Work: Per CM, several scenarios provided to clarify guidance
- 14:33, 8 January 2021 diff hist +1 m 606.2 Guard Cable →606.2.1 Guard Cable Types: minor correction
- 12:35, 7 January 2021 diff hist -223 m Recent Policy Changes in the EPG EPG 109.12
- 11:01, 7 January 2021 diff hist +5 m Category:109 Measurement and Payment →109.12 Change Orders
- 10:54, 7 January 2021 diff hist 0 N File:109.12 Truth Table 2021.docx
- 10:53, 7 January 2021 diff hist -10 m Category:109 Measurement and Payment →109.12.1.1 Change Order Approval Level Criteria
- 10:52, 7 January 2021 diff hist +2,143 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per CM, extensive clarifications
- 07:49, 7 January 2021 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private minor clarification ("man-hours" revised to "work-hours")
- 07:18, 7 January 2021 diff hist +4 m Category:134 Engineering Professional Services →134.3.3 Man Hours Review: Per LPA, minor clarification
- 15:21, 6 January 2021 diff hist 0 N File:237.9.3 due dates 2021.pdf current
- 15:21, 6 January 2021 diff hist +10 m 237.9 Submission of Plans and Supporting Documents Updated simplified "Bid Opening Dates and Final PS&E Due Dates" for non-MoDOT users
- 14:28, 6 January 2021 diff hist 0 m 237.6 Project Estimates updated PS&E due dates chart
- 14:27, 6 January 2021 diff hist 0 m 237.9 Submission of Plans and Supporting Documents updated PS&E due dates chart
- 14:26, 6 January 2021 diff hist 0 m 103.1 Bid Opening and Award Process updated PS&E due dates chart
- 12:13, 5 January 2021 diff hist +1 m Category:109 Measurement and Payment
- 10:30, 5 January 2021 diff hist +123 m 127.13 Noise Per Envr'l, added informational video
- 12:06, 4 January 2021 diff hist +26 m Recent Policy Changes in the EPG EPG 712.1.4.1.3
- 11:10, 4 January 2021 diff hist 0 N File:712.1.4.1.3.jpg current
- 11:10, 4 January 2021 diff hist +1,475 m Category:712 Structural Steel Construction →712.1.4.1.3 Shear Connector Welding: Per BR, updated to clarify shear connector welding requirements.
- 13:27, 31 December 2020 diff hist -126 m Recent Policy Changes in the EPG EPG 231.8
- 12:55, 31 December 2020 diff hist -314 m 231.8 Bridge Width Per BR, 24 ft. is not a new criterion, but EPG 231.8 was overlooked when this criterion was updated
- 12:25, 31 December 2020 diff hist -724 m Recent Policy Changes in the EPG EPG 751.1.5
- 12:15, 31 December 2020 diff hist -15 m Category:712 Structural Steel Construction →712.1.5.4.3 Step 3, Rotational Capacity
- 12:12, 31 December 2020 diff hist 0 N File:712.1.5.4.5.3.jpg current
- 12:12, 31 December 2020 diff hist 0 N File:712.1.5.4.5.2.jpg current
- 12:12, 31 December 2020 diff hist 0 N File:712.1.5.4.5.2 sec 712.7.6.jpg current
- 12:11, 31 December 2020 diff hist 0 N File:712.1.5.4.3 skidmore.jpg current
- 12:11, 31 December 2020 diff hist 0 N File:712.1.5.4.2 flowchart.jpg current
- 12:10, 31 December 2020 diff hist 0 N File:712.1.5.4.1.3.jpg current
- 12:10, 31 December 2020 diff hist 0 N File:712.1.5.4.1.2.jpg current
- 12:09, 31 December 2020 diff hist 0 N File:712.1.5.4.1.1.jpg current
- 12:09, 31 December 2020 diff hist 0 N File:712.1.5.4.1 A325.jpg current
- 12:08, 31 December 2020 diff hist +29,550 m Category:712 Structural Steel Construction Per CM and BR, new guidance for inspecting High Strength Bolts.
- 13:52, 30 December 2020 diff hist +160 m Recent Policy Changes in the EPG EPG 751.5
- 13:49, 30 December 2020 diff hist +75 m 751.5 Structural Detailing Guidelines →751.5.1.5 Order of Plan Sheets: Per BR, made minor updates to the order of plan sheets.
- 13:38, 30 December 2020 diff hist 0 N File:751.5.1.6 Typical Dec 2020.pdf
- 13:37, 30 December 2020 diff hist 0 m 751.5 Structural Detailing Guidelines Per BR, updated "Typical Prestressed Concrete Tangent Bridge" example Bridge plans
- 12:46, 30 December 2020 diff hist -1,036 m 750.7 Non-Hydraulic Considerations →750.7.4.1 Standard Plans: updated std plan links
- 12:35, 30 December 2020 diff hist +4 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses and Standard Plans
- 12:31, 30 December 2020 diff hist +145 m Recent Policy Changes in the EPG EPG 751.50
- 12:22, 30 December 2020 diff hist +1,111 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, added new Note A1.4 listing applicable standard plans (since this information was moved from EPG 751.5.2.1.3)
- 11:09, 30 December 2020 diff hist +19 m 751.40 LFD Widening and Repair updated link
- 10:56, 30 December 2020 diff hist +18 m 751.24 Retaining Walls updated link
- 10:54, 30 December 2020 diff hist +37 m 751.5 Structural Detailing Guidelines updated link
- 10:46, 30 December 2020 diff hist 0 N File:751.5.2.1.3.jpg current
- 10:46, 30 December 2020 diff hist -809 m 751.5 Structural Detailing Guidelines →751.5.2.1.3 Information Blocks: Per BR, removed archaic references to std plans in the title block
- 08:06, 30 December 2020 diff hist +112 m Category:101 Standard Forms →Construction and Materials: Per CM, added link to JOC 2021 Bridge Repair Spreadsheet