- 08:01, 2 April 2021 diff hist 0 N File:751.21.3.4.2.jpg current
- 08:00, 2 April 2021 diff hist 0 N File:751.21.3.4.1 voided.jpg current
- 08:00, 2 April 2021 diff hist 0 N File:751.21.3.4.1 box.jpg current
- 08:00, 2 April 2021 diff hist 0 N File:751.21.3.3.1 bending3.jpg current
- 07:59, 2 April 2021 diff hist 0 N File:751.21.3.3.1 bending2.jpg current
- 07:59, 2 April 2021 diff hist 0 N File:751.21.3.3.1 bending1.jpg current
- 07:58, 2 April 2021 diff hist 0 N File:751.21.3.3.1 spread2.jpg current
- 07:58, 2 April 2021 diff hist 0 N File:751.21.3.3.1 spread1.jpg current
- 07:58, 2 April 2021 diff hist 0 N File:751.21.3.2.4.jpg current
- 07:57, 2 April 2021 diff hist 0 N File:751.21.3.2.3.jpg current
- 07:57, 2 April 2021 diff hist 0 N File:751.21.3.2.2.jpg current
- 07:57, 2 April 2021 diff hist 0 N File:751.21.3.2.1.jpg current
- 07:56, 2 April 2021 diff hist 0 N File:751.21.1.3 box and solid.jpg current
- 07:55, 2 April 2021 diff hist 0 N File:751.21.1.3 solid.jpg current
- 07:55, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent voided 3.jpg current
- 07:54, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent voided 4.jpg current
- 07:54, 2 April 2021 diff hist 0 N File:751.21.1.3 spread voided.jpg current
- 07:54, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent box 3.jpg current
- 07:53, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent box 4.jpg current
- 07:53, 2 April 2021 diff hist 0 N File:751.21.1.3 spread box.jpg current
- 07:52, 2 April 2021 diff hist +26,392 N 751.21 Prestressed Concrete Slab and Box Beams Per BR, new EPG 751.21 to provide guidance for beams we have been designing and using for over a decade
- 11:06, 1 April 2021 diff hist +345 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, revisions to apply to new guidance in EPG 751.21 Prestressed Concrete Slab and Box Beams
- 10:19, 1 April 2021 diff hist +54 m 751.22 Prestressed Concrete I Girders Per BR, updated links
- 10:16, 1 April 2021 diff hist +18 m 751.22 Prestressed Concrete I Girders Per Br, updated link
- 10:04, 1 April 2021 diff hist +334 m 751.1 Preliminary Design Per BR, minor clarifications
- 11:22, 31 March 2021 diff hist 0 N File:903.2a Signpost Selection Guide 2021.xls current
- 11:21, 31 March 2021 diff hist 0 m Category:903 Highway Signing Per TS, minor clarifications and corrections for Signpost Selection Guide
- 11:21, 31 March 2021 diff hist 0 m 903.3 Ground-Mounted Sign Supports Per TS, minor clarifications and corrections for Signpost Selection Guide
- 09:52, 30 March 2021 diff hist -122 m 127.25 Maintenance Environmental Policies Per Maintenance, deleted archaic Deer Death Report Form and Map
- 07:53, 30 March 2021 diff hist +4 m 127.2 Historic Preservation and Cultural Resources
- 07:49, 30 March 2021 diff hist +474 m 127.2 Historic Preservation and Cultural Resources Per Env'l, updated Mo Historic Bridge Inventory links
- 11:21, 29 March 2021 diff hist +120 m 127.2 Historic Preservation and Cultural Resources Per Env'l, archaic link restored until further notice
- 11:12, 29 March 2021 diff hist -120 m 127.2 Historic Preservation and Cultural Resources
- 11:09, 29 March 2021 diff hist 0 m 127.2 Historic Preservation and Cultural Resources Per Env'l, updated Mo Historic Bridge Inventory link
- 13:46, 26 March 2021 diff hist -791 m Recent Policy Changes in the EPG EPG 501.1.3.5
- 13:33, 26 March 2021 diff hist +2,044 m Category:501 Concrete →501.1 Construction Inspection for Sec 501: Per CM, clarification of curing and testing procedures for cores and cylinders in projects with paving and structures.
- 08:14, 25 March 2021 diff hist -89 m Recent Policy Changes in the EPG EPG 751.50
- 08:10, 25 March 2021 diff hist +356 m 751.50 Standard Detailing Notes →H5a. Finger Plate: Per BR, updated note to clarify procedure for making holes for connection.
- 14:50, 24 March 2021 diff hist +201 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: Per CM, clarifed guidance. The MoDOT Contractor report is no longer useful in checking contractor insurance and it is causing some confusion.
- 13:17, 24 March 2021 diff hist 0 N File:129.3 temporary.docx current
- 13:17, 24 March 2021 diff hist -9 m Recent Policy Changes in the EPG EPG 129
- 13:11, 24 March 2021 diff hist -20 m Category:129 Public Involvement →129.6.4 Presentation for Location and Design Approval to the Commission and Commission Actions Needed
- 13:10, 24 March 2021 diff hist -75 m Category:129 Public Involvement →129.6.4 Presentation for Location and Design Approval to the Commission and Commission Actions Needed
- 13:09, 24 March 2021 diff hist +1,485 m Category:129 Public Involvement Per Env'l, FHWA will temporarily allow all public involvement activities previously conducted in person to exclusively use virtual techniques.
- 08:29, 24 March 2021 diff hist -603 m Recent Policy Changes in the EPG EPG 236.15
- 08:25, 24 March 2021 diff hist +241 m 236.16 Outdoor Advertising →236.16.15 Vegetation Removal: Per ODA, updated Vegetation Process in EPG. The current practice has been in place for several years. Unfortunately, it was overlooked on ODA’s part in the EPG.
- 10:53, 23 March 2021 diff hist -26 m Recent Policy Changes in the EPG EPG 108.1.1
- 10:45, 23 March 2021 diff hist +2,690 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: Per CM, new guidance about when subletting requirements can be adjusted
- 15:13, 19 March 2021 diff hist +4 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria →642.9.1 Slope and Rise of Sidewalk Ramps: Per DE, correction: minimum curb height for sidewalk ramp edge protection is 4 inches, not 2 inches.
- 14:56, 19 March 2021 diff hist -320 m Recent Policy Changes in the EPG EPG 109.12.3.2