User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:51, 24 June 2021 diff hist +30 m 751.11 Bearings →751.11.3 Details: Per BR, minor corrections in a couple of figures. Also clarified associated illustrations.
- 07:21, 24 June 2021 diff hist +1 m Category:101 Standard Forms →Construction and Materials
- 15:24, 23 June 2021 diff hist +159 m Category:146 Disadvantaged Business Enterprise (DBE) Per ECR and CM, retitled "CUF Determination Form Contracts Let After March 2021" from "CUF Determination Form Contracts Awarded After March 2021"
- 15:22, 23 June 2021 diff hist +53 m LPA:136.12 Figures, Glossary and Other Useful Links http://epg.modot.mo.gov/forms/CM/CUF_Determination_Form_Contracts_Let_After_03_2021.pdf
- 15:19, 23 June 2021 diff hist +106 m LPA:136.11 Local Public Agency Construction Per ECR and CM, retitled "CUF Determination Form Contracts Let After March 2021" from "CUF Determination Form Contracts Awarded After March 2021"
- 15:18, 23 June 2021 diff hist +48 m Category:101 Standard Forms Per ECR and CM, retitled "CUF Determination Form Contracts Let After March 2021" from "CUF Determination Form Contracts Awarded After March 2021"
- 13:00, 23 June 2021 diff hist 0 N File:616.13 WZ Impact 2021.xlsm current
- 13:00, 23 June 2021 diff hist -8 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated MoDOT Work Zone Impact Analysis Spreadsheet program to work with the current TMS format.
- 08:39, 23 June 2021 diff hist -86 m Recent Policy Changes in the EPG EPG 146
- 08:25, 23 June 2021 diff hist +651 m LPA:136.10 Advertisement for Bid and Project Award Per CM, new references to EPG 146 added
- 08:20, 23 June 2021 diff hist +144 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.15 Disadvantaged Business Enterprise (DBE) (49 CFR Part 26): Per CM, new references to EPG 146 added
- 08:18, 23 June 2021 diff hist +651 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2 Solicitation & Selection Process: Per CM, new references to EPG 146 added
- 08:11, 23 June 2021 diff hist +9,865 m Category:146 Disadvantaged Business Enterprise (DBE) Per CM and DE, guidance forproject bid proposals that include DBE goals has been clarified and expanded.
- 13:56, 22 June 2021 diff hist 0 N File:751.5.1.3.2 plate.jpg current
- 13:56, 22 June 2021 diff hist 0 N File:751.5.1.3.2 centerline.jpg current
- 13:56, 22 June 2021 diff hist 0 N File:751.5.1.3.2 baseline.jpg current
- 13:55, 22 June 2021 diff hist +2,526 m 751.5 Structural Detailing Guidelines →751.5.1.3.2 Symbols: Per BR, updated the symbol table
- 13:34, 22 June 2021 diff hist -31 Category:1180 Bituminous Stockpile Patching Material
- 12:07, 22 June 2021 diff hist +3 Category:1180 Bituminous Stockpile Patching Material
- 11:54, 22 June 2021 diff hist +2 Category:1180 Bituminous Stockpile Patching Material
- 11:27, 22 June 2021 diff hist +26 Category:1180 Bituminous Stockpile Patching Material
- 09:25, 22 June 2021 diff hist 0 m 903.8 Freeway and Expressway Guide Signs →Table 903.8.12 Guide Sign Sizes current
- 09:23, 22 June 2021 diff hist +37 m 903.8 Freeway and Expressway Guide Signs →903.8.38 Exit Direction Signs (MUTCD Section 2E.36)
- 09:18, 22 June 2021 diff hist -11,501 m 903.8 Freeway and Expressway Guide Signs Per TS, numerous minor clarifications
- 15:10, 21 June 2021 diff hist +4 m Category:1036 Reinforcing Steel for Concrete →1036.2.1.2 Welded Wire Fabric
- 15:09, 21 June 2021 diff hist +2 m Category:1036 Reinforcing Steel for Concrete →1036.2.1.2 Welded Wire Fabric: Per CM, outdated size differential values to be updated per spec M336 6.4.5.4.2.
- 09:27, 21 June 2021 diff hist +9 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, minor clarifications
- 13:52, 16 June 2021 diff hist +2 m 751.1 Preliminary Design →Common Bridge Barrier and Railing (for Rehabilitations)
- 13:50, 16 June 2021 diff hist +73 m Recent Policy Changes in the EPG EPG 751.1.3.4
- 13:45, 16 June 2021 diff hist 0 N File:751.1.3.4 Type G.jpg current
- 13:44, 16 June 2021 diff hist 0 N File:751.1.3.4 Type C.jpg current
- 13:44, 16 June 2021 diff hist 0 N File:751.1.3.4 Type A.jpg current
- 13:44, 16 June 2021 diff hist +597 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, simplified guidance for barrier and railing options on existing bridges
- 10:50, 15 June 2021 diff hist -88 m Recent Policy Changes in the EPG EPG 109
- 10:45, 15 June 2021 diff hist 0 File:109.10 transfer.xlsx Smithk uploaded a new version of File:109.10 transfer.xlsx current
- 10:43, 15 June 2021 diff hist +2,662 m Category:109 Measurement and Payment →109.10 Assignments (for Sec 109.10): Per CM, expanded guidance about how to assign a contract.
- 10:22, 15 June 2021 diff hist -1 m 751.40 LFD Widening and Repair →751.40.8.6.2.1 Shear Connector Design: Per BR, minor correction
- 14:58, 14 June 2021 diff hist -76 m 236.6 Appraisal and Appraisal Review →236.6.3.1 Standard Appraisal Format: Per RW, corrected link
- 12:59, 14 June 2021 diff hist 0 File:900 Flashing Beacons.pdf Smithk reverted File:900 Flashing Beacons.pdf to an old version current
- 12:56, 14 June 2021 diff hist +296 m Category:900 TRAFFIC CONTROL Per TS, updating links to brochures
- 10:58, 14 June 2021 diff hist +28 m 751.1 Preliminary Design Inclusive language.
- 15:10, 11 June 2021 diff hist -9 m Category:702 Load-Bearing Piles →702.1.4.1 Hammer Types: Inclusive language
- 14:22, 11 June 2021 diff hist 0 N File:136.6.6 2021.pdf current
- 14:21, 11 June 2021 diff hist -1 m LPA:136.13 LPA Policy Changes Fig. 136.6.6
- 14:21, 11 June 2021 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.6.6
- 14:20, 11 June 2021 diff hist +5 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.6 to bring it into compliance with existing guidance in EPG 136.6
- 13:37, 11 June 2021 diff hist -31 m Recent Policy Changes in the EPG EPG 616.8
- 13:16, 11 June 2021 diff hist +1 m 616.8 Typical Applications (MUTCD 6H) →616.8.1 Listing of Typical Applications
- 13:14, 11 June 2021 diff hist +86 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Maintenance
- 13:12, 11 June 2021 diff hist +132 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials