User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:00, 30 December 2021 diff hist 0 N File:I4-1a 2021.jpg current
- 08:59, 30 December 2021 diff hist 0 N File:I6-1 2021.jpg current
- 08:59, 30 December 2021 diff hist 0 N File:I5-1 2021.jpg current
- 08:59, 30 December 2021 diff hist 0 N File:I4-1 2021.jpg current
- 08:58, 30 December 2021 diff hist -6 m 903.15 Signing Agreements →903.15.3 TR15 Sign Program Participation Paid by Others: updated link
- 08:58, 30 December 2021 diff hist +1,261 m 903.9 General Information Signs Per TS, removed populations from city limit signs. City limit and county line sign designs will be modified to match the MUTCD standard layout of jurisdictional boundary signs.
- 08:15, 29 December 2021 diff hist -55 m 617.2 Construction Inspection Guidelines for Sec 617
- 07:56, 29 December 2021 diff hist -4 m Category:1001 General Requirements for Material →1001.5.2.4 Report
- 07:54, 29 December 2021 diff hist +1 m Category:1001 General Requirements for Material →1001.4.1.12 Initial Evaluation of Material
- 07:52, 29 December 2021 diff hist 0 N File:1001.4.1.9 AS3900.pdf current
- 07:51, 29 December 2021 diff hist -42 m Category:1001 General Requirements for Material →1001.4.1 Initial Evaluation: Per CM, updated AS 3900
- 13:14, 28 December 2021 diff hist +30 m Recent Policy Changes in the EPG EPG 127.1
- 13:13, 28 December 2021 diff hist +43 m 147.3 Job Order Contracting (JOC)
- 13:06, 28 December 2021 diff hist 0 m 127.1 Request for Environmental Services →127.1.1.2 Process
- 13:04, 28 December 2021 diff hist -1 m Category:235 Preliminary Plans →235.6 Approval of Preliminary Plan: updated link
- 13:04, 28 December 2021 diff hist -321 m 127.1 Request for Environmental Services Per Env'l, clarified the process of RES submittals and emphasized the electronic process. Added email group information.
- 12:09, 28 December 2021 diff hist +190 m 147.3 Job Order Contracting (JOC) Per Env'l, clarified the process of RES submittals and emphasized the electronic process.
- 11:17, 28 December 2021 diff hist +135 m 642.8 Sidewalk Design Criteria updating broken link
- 11:13, 28 December 2021 diff hist -33 m 642.8 Sidewalk Design Criteria updating several broken links
- 14:28, 23 December 2021 diff hist +27 m Category:1001 General Requirements for Material Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
- 09:27, 22 December 2021 diff hist -62 m 751.50 Standard Detailing Notes →J1. General: minor clarifications
- 07:39, 22 December 2021 diff hist -27 m Recent Policy Changes in the EPG EPG 109.14
- 07:36, 22 December 2021 diff hist -12 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, guidance now explicitly excludes pay items in Job Order Contracts from qualifying for Fuel Adjustment, per Sec. 109.14.
- 15:17, 17 December 2021 diff hist +3 m 903.2 Extent of Signing →903.2.25.2 Plan Development Procedure: updated broken BR division link
- 15:10, 17 December 2021 diff hist +3 m 751.1 Preliminary Design →751.1.2.9.2 Steel Girder Options: updated broken BR division link
- 15:07, 17 December 2021 diff hist +10 m Category:1029 Fabricating Prestressed Concrete Members for Bridges updating broken BR division links
- 15:03, 17 December 2021 diff hist +3 m Category:134 Engineering Professional Services →134.5.1 Invoicing: updated broken BR division link
- 14:56, 17 December 2021 diff hist +20 m 750.7 Non-Hydraulic Considerations updating broken BR division links
- 14:50, 17 December 2021 diff hist -14 m 121.5 Asset Management →121.5.2.3 Bridges: updated broken BR division link
- 14:49, 17 December 2021 diff hist +5 m Category:206 Excavation for Structures →206.4 Construction Inspection Guidelines for Sec 206: updated broken BR division link
- 14:46, 17 December 2021 diff hist +5 m 127.9 Floodplain Management →127.9.3.3 Responsibilities: updating broken BR division link
- 14:44, 17 December 2021 diff hist -14 m 131.1 Design Exception Process →131.1.4 The Design Exception Process: updating broken BR division link
- 14:42, 17 December 2021 diff hist +3 m 616.11 Traffic Control for Waterways →616.11.1 Guidelines for Determining the Need for Work Zone Control: updating broken BR division link current
- 14:41, 17 December 2021 diff hist +6 m 903.22 Material Inspection for Sec 903 updating BR division links current
- 14:39, 17 December 2021 diff hist +3 m 903.4 Overhead Sign Mounting →903.4.1 Overhead Sign Installations (MUTCD Section 2A.17): Updating broken BR division link current
- 13:55, 17 December 2021 diff hist -9 m Category:110 State and Federal Wage Rates and Other Requirements →110.2 Federal-Aid Projects (Guidance for Sec 110.2)
- 13:27, 17 December 2021 diff hist -4,193 m Category:110 State and Federal Wage Rates and Other Requirements Per CM and ECR, deleted listing of required posters and packets to be displayed at project site. Reader is directed to MoDOT's contractor resources website.
- 12:19, 17 December 2021 diff hist +54 m Recent Policy Changes in the EPG EPG 751.24.2.1, EPG 751.50
- 10:55, 17 December 2021 diff hist +2,079 m 751.50 Standard Detailing Notes Per BR, numerous notes updated to reflect that, in lieu of using pipe pile spacers, the contractor will have the option to use pile jackets for bridges up to 200 feet long.
- 10:47, 17 December 2021 diff hist +1,450 m 751.24 Retaining Walls →751.24.2.1 Design: Per BR, in lieu of using pipe pile spacers, the contractor will have the option to use pile jackets for bridges up to 200 feet long.
- 12:50, 16 December 2021 diff hist -42 m 103.1 Bid Opening and Award Process Per Bidding and Estimates, updated links to PS&E chart and calendar.
- 12:46, 16 December 2021 diff hist 0 N File:237.9.3 Due Date Calendar.pdf current
- 12:45, 16 December 2021 diff hist +19 m 237.6 Project Estimates Per Bidding and Estimates, updated links to PS&E chart and calendar.
- 12:39, 16 December 2021 diff hist 0 N File:237.9.3 PS&E Due Date Chart.pdf current
- 12:38, 16 December 2021 diff hist -267 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Estimates, updated links to PS&E chart and calendar. Deleted reference to consultants' version of this information
- 13:19, 15 December 2021 diff hist +1 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 13:14, 15 December 2021 diff hist +17 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 07:30, 15 December 2021 diff hist +963 m 751.40 LFD Widening and Repair →751.40.2.3.2 Bent Cap Shear Strengthening using FRP Wrap
- 14:49, 14 December 2021 diff hist -54 m Recent Policy Changes in the EPG EPG 909
- 14:38, 14 December 2021 diff hist +230 m 616.14 Work Zone Safety and Mobility Policy →616.14.10 Work Zone Transportation Management Plan: Per TS, added info associated with the WZ Management Guidebook