User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:20, 29 March 2022 diff hist +64 m 127.13 Noise Per Env'l, added Sound Wall brochure for general information
- 06:14, 29 March 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.5 Camber, Haunching and Girder Steps: updated link
- 14:21, 28 March 2022 diff hist +23 m Recent Policy Changes in the EPG
- 14:20, 28 March 2022 diff hist +33 m Recent Policy Changes in the EPG EPG 751.50
- 14:15, 28 March 2022 diff hist -373 m 751.50 Standard Detailing Notes Per BR, removed references to web coil ties in bulb-tee and NU girders
- 12:30, 28 March 2022 diff hist +1 m Category:101 Standard Forms →Materials Related: Per CM, updated broken link
- 12:27, 21 March 2022 diff hist -38 m 616.18 Construction Inspection Guidelines for Sec 616 →Safety Requirements (for Sec 616.3): deleted outdated photo of PPE
- 10:04, 18 March 2022 diff hist +5 m Help Article →EPG Ballot Cycles
- 10:03, 18 March 2022 diff hist +3 m Help Article →EPG Ballot Cycles
- 10:02, 18 March 2022 diff hist -21 m Help Article →EPG Ballot Cycles
- 10:01, 18 March 2022 diff hist +19 m Help Article →EPG Ballot Cycles
- 10:01, 18 March 2022 diff hist -19 m Help Article →EPG Ballot Cycles: updated schedule
- 07:25, 17 March 2022 diff hist -190 m 643.2 Local Utility Adjustments - Public and Private updated broken links
- 07:17, 17 March 2022 diff hist -36 643.4 Railroads updated broken links
- 14:19, 16 March 2022 diff hist -9 m Recent Policy Changes in the EPG
- 14:17, 16 March 2022 diff hist +75 m Recent Policy Changes in the EPG EPG 109.11
- 14:08, 16 March 2022 diff hist +4,839 m Category:109 Measurement and Payment →109.11 Compensation for Project Delays (for Sec 109.11): Per CM, expanded guidance to produce more uniform administration of delay claims
- 11:59, 16 March 2022 diff hist -969 m 106.17 New Product Evaluation Per CM, deleted archaic info in "How MoDOT Employees Report Product Tests" and updated the location of the New Products Coordinator from Organizational Results to Construction and Materials.
- 10:22, 14 March 2022 diff hist -14 m 1045.5 Policy on Color of Structural Steel Paint updated link current
- 09:15, 14 March 2022 diff hist +13 m Category:1029 Fabricating Prestressed Concrete Members for Bridges updated broken link
- 13:37, 11 March 2022 diff hist +275 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.16
- 13:35, 11 March 2022 diff hist 0 N File:136.9.4.1.1.16 Training.docx current
- 13:34, 11 March 2022 diff hist -35 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.16 On the Job Training (OJT) (23 CFR Section 230): Per LPA, updated training provision link with the current training provision.
- 07:43, 11 March 2022 diff hist -100 m Help Article updated link
- 07:38, 11 March 2022 diff hist +100 m Where to Find PDM Information in the EPG →Chapter IV, Detail Design: updated link current
- 07:25, 11 March 2022 diff hist +8 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated links
- 07:21, 11 March 2022 diff hist +11 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated links
- 07:14, 11 March 2022 diff hist +44 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated links
- 14:55, 10 March 2022 diff hist -242 m Category:1180 Bituminous Stockpile Patching Material current
- 13:37, 10 March 2022 diff hist 0 N File:Table 805.2.4a.docx current
- 13:37, 10 March 2022 diff hist +242 m Category:1180 Bituminous Stockpile Patching Material
- 15:19, 9 March 2022 diff hist -241 m Category:1180 Bituminous Stockpile Patching Material
- 15:18, 9 March 2022 diff hist 0 N File:Table 805.2.4.docx current
- 15:18, 9 March 2022 diff hist +241 m Category:1180 Bituminous Stockpile Patching Material
- 14:51, 9 March 2022 diff hist +268 m LPA:136.13 LPA Policy Changes EPG 136.2
- 14:45, 9 March 2022 diff hist +10 m LPA:136.2 Certification and Training Per LPA, updated LPA training requirements to current practice current
- 14:32, 9 March 2022 diff hist +158 m LPA:136.1 Introduction →136.1.2.1.1 Requirements: Per LPA, updated LPA training requirements
- 14:30, 8 March 2022 diff hist +186 m LPA:136.13 LPA Policy Changes EPG 136.3.13
- 14:27, 8 March 2022 diff hist +97 m LPA:136.3 Federal Aid Basics →136.3.13 Agreements: Per LPA, removed archaic requirment to submit 7 copies of the program agreement
- 11:04, 8 March 2022 diff hist +13 m 905.2 Traffic Studies updated broken link
- 07:55, 8 March 2022 diff hist +11 m 901.16 Construction Inspection Guidelines for Sec 901 updated archaic link current
- 13:22, 3 March 2022 diff hist +41 m 903.3 Ground-Mounted Sign Supports clarification
- 12:40, 3 March 2022 diff hist 0 m 320.1 Preliminary Geotechnical Report (PGR) →320.1.4.2 Example for the Summary for Preliminary Geotechnical Report - Form M-41
- 12:39, 3 March 2022 diff hist 0 N File:320.1.4.2 M-41 Example.jpg current
- 12:39, 3 March 2022 diff hist 0 N File:320.1 M-41.docx current
- 12:38, 3 March 2022 diff hist +136 m 320.1 Preliminary Geotechnical Report (PGR) Per CM, provided updated Summary for Preliminary Geotechnical Report (Form M-41) and example of M-41
- 07:55, 3 March 2022 diff hist -10 m 236.8 Relocation Assistance Program updated links
- 07:36, 3 March 2022 diff hist 0 m 236.7 Negotiation updated links
- 15:25, 2 March 2022 diff hist +106 m 903.3 Ground-Mounted Sign Supports updated links
- 14:42, 1 March 2022 diff hist +17 Category:129 Public Involvement updated broken link