User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:54, 21 June 2022 diff hist +17 m 902.6 Pedestrian Control Features (MUTCD Chapter 4E) →902.6.8 Pedestrian Detectors (MUTCD Section 4E.08): Per EPS, the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
- 07:36, 17 June 2022 diff hist -43 m Main Page updated broken links
- 06:24, 17 June 2022 diff hist +311 m LPA:136.13 LPA Policy Changes EPG 136.8
- 10:26, 16 June 2022 diff hist +824 m LPA:136.8 Local Public Agency Land Acquisition Per RW, clarified guidance for LPA ROW Staff negotiators.
- 07:38, 15 June 2022 diff hist -58 m 751.8 LFD Culverts Per BR, deleted archaic EPG 751.8 LFD Culverts current
- 10:18, 8 June 2022 diff hist -27 m LPA:136.3 Federal Aid Basics →136.3.5 STIP/TIP: updated broken link
- 14:11, 3 June 2022 diff hist +39 m 642.8 Sidewalk Design Criteria Per EPS, revised PROWAG and TPAR links
- 08:22, 3 June 2022 diff hist +52 m Recent Policy Changes in the EPG EPG 236.5
- 08:17, 3 June 2022 diff hist +69 m 236.5 Property Management →236.5.25.5 Risk Assessment: Per RW, sovereign immunity limits increased in January 2022 and require MoDOT to increase per occurrence coverage from $3.0 M to $3.5 M
- 07:20, 3 June 2022 diff hist 0 m 751.1 Preliminary Design Per TP, updated Major Highway System map
- 07:19, 3 June 2022 diff hist 0 m Category:941 Permits and Access Requests Per TP, updated Major Highway System map
- 07:19, 3 June 2022 diff hist 0 m 822.5 Definitions Per TP, updated Major Highway System map current
- 07:18, 3 June 2022 diff hist 0 m 822.1 Vegetation Management for Major Roads Per TP, updated Major Highway System map current
- 07:17, 3 June 2022 diff hist 0 m 748.2 Roadway Design Criteria Per TP, updated Major Highway System map current
- 07:17, 3 June 2022 diff hist 0 m 643.3 Policy, Standards and Regulations Per TP, updated Major Highway System map
- 07:16, 3 June 2022 diff hist 0 m Category:643 Utility Procedures Per TP, updated Major Highway System map current
- 07:16, 3 June 2022 diff hist 0 m 626.3 Construction Inspection Guidelines for Sec 626 Per TP, updated Major Highway System map current
- 07:16, 3 June 2022 diff hist 0 m 626.2 Centerline Rumble Strips Per TP, updated Major Highway System map
- 07:15, 3 June 2022 diff hist 0 m 626.1 Edgeline Rumble Strips Per TP, updated Major Highway System map current
- 07:14, 3 June 2022 diff hist 0 m 620.12 Construction Inspection for Sec 620 Per TP, updated Major Highway System map
- 07:14, 3 June 2022 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy Per TP, updated Major Highway System map
- 07:12, 3 June 2022 diff hist 0 m 236.13 Designing Right of Way Plans Per TP, updated Major Highway System map
- 07:12, 3 June 2022 diff hist 0 m Category:232 Facility Selection Per TP, updated Major Highway System map
- 07:11, 3 June 2022 diff hist 0 m 231.4 Shoulder Width Per TP, updated Major Highway System map
- 07:10, 3 June 2022 diff hist 0 m 144.5 Pavement Maintenance Per TP, updated Major Highway System map
- 07:09, 3 June 2022 diff hist 0 m Category:144 Practical Operations Per TP, updated Major Highway System map current
- 07:08, 3 June 2022 diff hist 0 m 133.5 Operator’s Guide for Anti-Icing Per TP, updated Major Highway System map current
- 07:07, 3 June 2022 diff hist 0 N File:144 Major Highway System 2022.pdf current
- 07:06, 3 June 2022 diff hist 0 m 121.5 Asset Management Per TP, updated Major Highway System map
- 14:06, 2 June 2022 diff hist +12 m LPA:136.13 LPA Policy Changes EPG 136.8
- 13:57, 2 June 2022 diff hist +559 m LPA:136.13 LPA Policy Changes EPG 136.8
- 13:46, 2 June 2022 diff hist +1 m LPA:136.8 Local Public Agency Land Acquisition Per RW, increased the value of waiver valuations to $25,000 (from $10,000), per FHWA's approval in 2021
- 09:45, 2 June 2022 diff hist +1 m 751.22 Prestressed Concrete I Girders →751.22.3.7.2 Reinforcement
- 09:43, 2 June 2022 diff hist +4 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 09:42, 2 June 2022 diff hist +72 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 12:23, 1 June 2022 diff hist +429 m Recent Policy Changes in the EPG EPG 751
- 11:23, 1 June 2022 diff hist +8 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.11 Dowel Bars and Concrete Shear Blocks: updated a link
- 10:29, 1 June 2022 diff hist +24 m 751.50 Standard Detailing Notes updated links
- 10:26, 1 June 2022 diff hist -92 m 751.11 Bearings updated links
- 10:23, 1 June 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams updated links
- 10:21, 1 June 2022 diff hist 0 m 751.9 Bridge Seismic Design updated links
- 10:13, 1 June 2022 diff hist 0 m 751.22 Prestressed Concrete I Girders →751.22.3 Details
- 10:10, 1 June 2022 diff hist 0 N File:751.22.3.10 Open2.jpg current
- 10:09, 1 June 2022 diff hist 0 N File:751.22.3.10 Open1.jpg current
- 10:08, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed2.jpg current
- 10:05, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed1.jpg current
- 10:03, 1 June 2022 diff hist 0 N File:751.22.3.9.3 2022.jpg current
- 10:01, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU2.jpg current
- 09:59, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU1.jpg current
- 09:58, 1 June 2022 diff hist 0 N File:751.22.3.9.2 BulbTee2.jpg current