User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:49, 22 June 2022 diff hist -4 m 751.17 Concrete Slab Bridges →751.17.2.2 Loads: minor correction current
- 10:41, 22 June 2022 diff hist +30 m 127.29 Stormwater →127.29.4.5 MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment: Per Env'l, updated link current
- 10:38, 22 June 2022 diff hist +10 m 750.3 Bridges updated several links current
- 09:12, 22 June 2022 diff hist -20 m 751.17 Concrete Slab Bridges →751.17.2.1 Limit States and Load Factors: minor correction
- 09:08, 22 June 2022 diff hist -1 m Category:725 Metal Pipe and Pipe-Arch Culverts →725.1 Construction Inspection for Sec 725: updated link current
- 08:58, 22 June 2022 diff hist +41 m Category:772 Bridge Inspections updated link current
- 08:40, 22 June 2022 diff hist -19 m 751.17 Concrete Slab Bridges →751.17.1.1 Material Properties: minor corrections
- 08:25, 22 June 2022 diff hist -75 m 771.14 Spot Painting of Bearings and Piling →Safety: deleted archaic link current
- 08:09, 22 June 2022 diff hist -490 m Category:751 LRFD Bridge Design Guidelines deleted archaic info
- 14:19, 21 June 2022 diff hist +16 m Recent Policy Changes in the EPG updated link
- 14:19, 21 June 2022 diff hist +32 m 642.8 Sidewalk Design Criteria updated links
- 14:18, 21 June 2022 diff hist +16 m LPA:136.13 LPA Policy Changes updated links
- 14:17, 21 June 2022 diff hist +32 m LPA:136.12 Figures, Glossary and Other Useful Links updated links
- 14:16, 21 June 2022 diff hist +64 m LPA:136.11 Local Public Agency Construction updated links
- 14:15, 21 June 2022 diff hist +64 m LPA:136.9 Plans, Specs and Estimates (PSE) updated links
- 14:13, 21 June 2022 diff hist +32 m Category:101 Standard Forms →Construction and Materials: updated links
- 14:12, 21 June 2022 diff hist +32 m Category:150 Quality Management updated links
- 13:43, 21 June 2022 diff hist 0 m Recent Policy Changes in the EPG
- 13:43, 21 June 2022 diff hist 0 m LPA:136.13 LPA Policy Changes
- 13:36, 21 June 2022 diff hist +104 m Recent Policy Changes in the EPG EPG 902.6 and ADA Checklist
- 13:28, 21 June 2022 diff hist +602 m LPA:136.13 LPA Policy Changes EPG 136.9, EPG 136.11
- 13:21, 21 June 2022 diff hist -30 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: ADA Checklist (Fig. 136.9.4)
- 13:18, 21 June 2022 diff hist -60 m LPA:136.11 Local Public Agency Construction Per EPS, updated ADA Checklist to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
- 13:12, 21 June 2022 diff hist -89 m LPA:136.9 Plans, Specs and Estimates (PSE) Per EPS, updated ADA Checklist to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
- 13:07, 21 June 2022 diff hist -30 m 642.8 Sidewalk Design Criteria Per EPS, updated ADA Checklist to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
- 13:05, 21 June 2022 diff hist -30 m Category:150 Quality Management Per EPS, updated ADA Checklist to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
- 13:02, 21 June 2022 diff hist 0 N File:ADA Checklist 061522.docx current
- 13:02, 21 June 2022 diff hist 0 N File:ADA Checklist 061522.pdf current
- 13:02, 21 June 2022 diff hist -30 m Category:101 Standard Forms →Construction and Materials: Per EPS, updated ADA Checklist to reflect the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
- 12:55, 21 June 2022 diff hist 0 N File:902.6.8.1 061522.jpg current
- 12:54, 21 June 2022 diff hist +17 m 902.6 Pedestrian Control Features (MUTCD Chapter 4E) →902.6.8 Pedestrian Detectors (MUTCD Section 4E.08): Per EPS, the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
- 08:36, 17 June 2022 diff hist -43 m Main Page updated broken links
- 07:24, 17 June 2022 diff hist +311 m LPA:136.13 LPA Policy Changes EPG 136.8
- 11:26, 16 June 2022 diff hist +824 m LPA:136.8 Local Public Agency Land Acquisition Per RW, clarified guidance for LPA ROW Staff negotiators.
- 08:38, 15 June 2022 diff hist -58 m 751.8 LFD Culverts Per BR, deleted archaic EPG 751.8 LFD Culverts current
- 11:18, 8 June 2022 diff hist -27 m LPA:136.3 Federal Aid Basics →136.3.5 STIP/TIP: updated broken link
- 15:11, 3 June 2022 diff hist +39 m 642.8 Sidewalk Design Criteria Per EPS, revised PROWAG and TPAR links
- 09:22, 3 June 2022 diff hist +52 m Recent Policy Changes in the EPG EPG 236.5
- 09:17, 3 June 2022 diff hist +69 m 236.5 Property Management →236.5.25.5 Risk Assessment: Per RW, sovereign immunity limits increased in January 2022 and require MoDOT to increase per occurrence coverage from $3.0 M to $3.5 M
- 08:20, 3 June 2022 diff hist 0 m 751.1 Preliminary Design Per TP, updated Major Highway System map
- 08:19, 3 June 2022 diff hist 0 m Category:941 Permits and Access Requests Per TP, updated Major Highway System map
- 08:19, 3 June 2022 diff hist 0 m 822.5 Definitions Per TP, updated Major Highway System map current
- 08:18, 3 June 2022 diff hist 0 m 822.1 Vegetation Management for Major Roads Per TP, updated Major Highway System map current
- 08:17, 3 June 2022 diff hist 0 m 748.2 Roadway Design Criteria Per TP, updated Major Highway System map current
- 08:17, 3 June 2022 diff hist 0 m 643.3 Policy, Standards and Regulations Per TP, updated Major Highway System map
- 08:16, 3 June 2022 diff hist 0 m Category:643 Utility Procedures Per TP, updated Major Highway System map current
- 08:16, 3 June 2022 diff hist 0 m 626.3 Construction Inspection Guidelines for Sec 626 Per TP, updated Major Highway System map current
- 08:16, 3 June 2022 diff hist 0 m 626.2 Centerline Rumble Strips Per TP, updated Major Highway System map
- 08:15, 3 June 2022 diff hist 0 m 626.1 Edgeline Rumble Strips Per TP, updated Major Highway System map current
- 08:14, 3 June 2022 diff hist 0 m 620.12 Construction Inspection for Sec 620 Per TP, updated Major Highway System map