User contributions
Jump to navigation
Jump to search
- 09:54, 29 September 2022 diff hist +452 Recent Policy Changes in the EPG
- 08:56, 29 September 2022 diff hist +12 Recent Policy Changes in the EPG
- 15:58, 28 September 2022 diff hist +538 Recent Policy Changes in the EPG
- 15:41, 28 September 2022 diff hist +390 Recent Policy Changes in the EPG
- 15:32, 28 September 2022 diff hist +505 Recent Policy Changes in the EPG
- 15:06, 28 September 2022 diff hist +1,628 Recent Policy Changes in the EPG
- 08:46, 28 September 2022 diff hist -3 236.8 Relocation Assistance Program 236.8.6.12 - updated links to form 236.8.6.12(a)
- 08:16, 28 September 2022 diff hist -1 m 236.8 Relocation Assistance Program 236.8.6.9 - updated link to form 236.8.6.12(a)
- 08:09, 28 September 2022 diff hist -1 m 236.8 Relocation Assistance Program 236.8.6.8 - updated broken link to form 236.8.6.12(a)
- 07:59, 28 September 2022 diff hist -1 236.8 Relocation Assistance Program
- 07:53, 28 September 2022 diff hist -1 236.8 Relocation Assistance Program →236.8.6.11 Moving Cost Agreements
- 07:47, 28 September 2022 diff hist -5 236.8 Relocation Assistance Program
- 12:56, 26 September 2022 diff hist +5 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material 1040.2.3 updated MASH to MASH 2016
- 12:45, 26 September 2022 diff hist +10 m 751.12 Barriers, Railings, Curbs and Fences updated 751.12.1.3 from MASH to MASH 2016 in 2 places
- 10:00, 26 September 2022 diff hist +200 Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14)
- 09:02, 26 September 2022 diff hist -62 m 233.3 Roundabouts updated link to the Additional Resources box
- 15:22, 21 September 2022 diff hist +20 m 751.1 Preliminary Design 751.1.3.4 updated type C,D,G and H under header Section (Test Level) from MASH to MASH 2016
- 15:16, 21 September 2022 diff hist 0 751.1 Preliminary Design 751.1.3.4 changed Guidelines section from 2020 MASH to 2016 MASH
- 14:42, 21 September 2022 diff hist +7 m 751.1 Preliminary Design updated 751.1.3.4 changed MASH to MASH 2016 for type C and D barriers
- 14:35, 21 September 2022 diff hist +4 m Category:612 Impact Attenuators updated 612.1.1 from MASH to MASH 2016
- 14:21, 21 September 2022 diff hist +40 606.1 Guardrail updated 606.1.3.2 in several locations changing MASH to MASH 2016
- 14:03, 21 September 2022 diff hist +15 606.1 Guardrail updated 606.1.3.1 in 3 places changed MASH to MASH 2016
- 13:58, 21 September 2022 diff hist +15 m 606.1 Guardrail updated 606.1.2 - changed 2 more mash terms to MASH 2016
- 13:53, 21 September 2022 diff hist +5 m 606.1 Guardrail updated 606.1.2 - changed Mash to Mash 2016
- 13:47, 21 September 2022 diff hist +8 m Category:606 Guardrail and Guard Cable updated Guard Cable - Testing Criteria to MASH 2016 (there were 2 more changes in this section)
- 13:45, 21 September 2022 diff hist -8 Category:606 Guardrail and Guard Cable Undo revision 51836 by Hoskir (talk) Tag: Undo
- 13:44, 21 September 2022 diff hist +8 Category:606 Guardrail and Guard Cable
- 13:39, 21 September 2022 diff hist +7 m Category:606 Guardrail and Guard Cable updated Guard Cable - Testing Criteria to MASH 2016
- 13:19, 21 September 2022 diff hist +19 Category:241 Aesthetic Considerations updated to MASH 2016 and AASHTO 2016 current
- 10:45, 21 September 2022 diff hist -78 m 238.2 Land Surveying updated the links to Standard Plan 602.00
- 08:48, 21 September 2022 diff hist +22 m Category:134 Engineering Professional Services updated link to the 2012 UAG
- 10:34, 20 September 2022 diff hist +11 236.7 Negotiation →236.7.2.4 Offer Letter and Supporting Documentation
- 09:11, 16 September 2022 diff hist 0 640.1 Pavement Drainage →640.1.3.2 Composite Curb-and-Gutter Sections current
- 08:51, 16 September 2022 diff hist -1 m Category:128 Conceptual Studies Changed the RES Instructions from a docx to a PDF
- 08:51, 16 September 2022 diff hist -1 m Category:101 Standard Forms →Environmental and Cultural
- 08:50, 16 September 2022 diff hist -1 127.1 Request for Environmental Services Changed the RES Instructions from a docx to a PDF
- 08:48, 16 September 2022 diff hist 0 N File:2022-08-31 RES Instruction Manual.pdf
- 08:19, 16 September 2022 diff hist +11 m Category:128 Conceptual Studies updated the RES Form Instructions
- 08:18, 16 September 2022 diff hist +11 m 127.1 Request for Environmental Services updated the RES Form Instructions
- 08:15, 16 September 2022 diff hist +11 Category:101 Standard Forms →Environmental and Cultural
- 07:58, 16 September 2022 diff hist 0 N File:2022-08-31 RES Instruction Manual.docx
- 09:24, 13 September 2022 diff hist +978 m 806.1 Erosion Control Measures →806.1.7.1 Design Considerations
- 08:37, 12 September 2022 diff hist +243 Category:101 Standard Forms →Materials Related
- 09:19, 7 September 2022 diff hist 0 LPA:136.6 Environmental and Cultural Requirements
- 09:17, 7 September 2022 diff hist +43 N File:136.6.16 2022.pdf LPA Project Process Checklist current
- 08:17, 7 September 2022 diff hist +17 LPA:136.6 Environmental and Cultural Requirements
- 08:12, 7 September 2022 diff hist +31 N File:136.6.15 e106 Example 2022.pdf e106 Form Example current
- 14:57, 2 September 2022 diff hist +63 237.8 Contract Time
- 14:57, 1 September 2022 diff hist -5 m Category:171 Maintenance Policy and Operations current
- 14:56, 1 September 2022 diff hist +12 m Category:171 Maintenance Policy and Operations Revised per revision request 3549