User contributions for Hoskir
Jump to navigation
Jump to search
15 April 2025
- 13:1213:12, 15 April 2025 diff hist −2 m 106.24 Purchase Order Items updated formatting Tag: Reverted
- 13:1013:10, 15 April 2025 diff hist +2 m 106.23 Online Research Publications (Research Publications) updated formatting current
- 13:0913:09, 15 April 2025 diff hist −6 m 106.22 Material Inspection Revisions updated formatting Tag: Reverted
- 13:0813:08, 15 April 2025 diff hist +89 m 106.21 Summary of Materials Inspected updated formatting
- 12:5412:54, 15 April 2025 diff hist +23 m 106.20 Reporting updated formatting
- 12:4112:41, 15 April 2025 diff hist +82 m 106.19 Materials Acceptance updated formatting
- 12:3812:38, 15 April 2025 diff hist +18 m 106.17 New Product Evaluation updated formatting current
- 12:3512:35, 15 April 2025 diff hist −10 m 106.17 New Product Evaluation updated formatting
- 12:2912:29, 15 April 2025 diff hist +81 m 106.16 Special Designs and Shop Drawings updated formatting
- 12:2712:27, 15 April 2025 diff hist +54 m 106.15 Pipe Shipping Report Form updated formatting
- 12:2112:21, 15 April 2025 diff hist +4 m 106.14 Proprietary Items updated formatting current
- 11:4811:48, 15 April 2025 diff hist +3 106.13 Quality Control/Quality Assurance updated formatting current
- 11:4711:47, 15 April 2025 diff hist −48 m 106.12 Qualified Lists (QL) and Pre-Acceptance Lists (PAL) updated formatting
- 11:4411:44, 15 April 2025 diff hist −3 m 106.11 Metric Implementation updated formatting
- 11:4311:43, 15 April 2025 diff hist +5 m 106.10 Missouri Domestic Products Requirement updated formatting current
- 11:4111:41, 15 April 2025 diff hist +90 m 106.9 Buy America Requirement updated formatting
- 11:3911:39, 15 April 2025 diff hist +3 m 106.8 Material Furnished by the Commission updated formatting current
- 11:3911:39, 15 April 2025 diff hist +4 m 106.7 Unacceptable Material updated formatting current
- 11:3611:36, 15 April 2025 diff hist +67 m 106.4 Plant Inspections updated formatting
14 April 2025
- 13:4513:45, 14 April 2025 diff hist +1 m Category:620 Pavement Marking (MUTCD Part 3) formatting update
- 13:4313:43, 14 April 2025 diff hist −276 Category:620 Pavement Marking (MUTCD Part 3) updated per RR4042 Tag: visualeditor-switched
- 13:4213:42, 14 April 2025 diff hist +27 N File:Contract Striping 4-10-25.png File uploaded with MsUpload
- 11:5411:54, 14 April 2025 diff hist +375 Recent Policy Changes in the EPG No edit summary Tag: visualeditor-switched
- 10:5210:52, 14 April 2025 diff hist +1,660 Recent Policy Changes in the EPG No edit summary
- 10:3910:39, 14 April 2025 diff hist +485 751.50 Standard Detailing Notes →G1. Concrete Bents: updated per RR4033
- 10:3410:34, 14 April 2025 diff hist +495 751.39 Pile Footings →751.39.5 Reinforcement: updated per RR4033
- 10:3110:31, 14 April 2025 diff hist +297 751.39 Pile Footings →751.39.1 Dimensions: updated per RR4033
- 10:2810:28, 14 April 2025 diff hist +665 751.38 Spread Footings →751.38.8.3.1 Spread Footing Reinforcement: updated per RR4033
- 10:2610:26, 14 April 2025 diff hist +215 751.37 Drilled Shafts →751.37.6.4 Transverse Reinforcement: updated per RR4033
- 10:2310:23, 14 April 2025 diff hist +22 751.37 Drilled Shafts →751.37.6.2 Longitudinal Reinforcement: updated per RR4033
- 10:1810:18, 14 April 2025 diff hist +183 751.37 Drilled Shafts →751.37.1.6 Drilled Shaft General Detail Considerations: updated per RR4033
- 10:1610:16, 14 April 2025 diff hist +420 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column: updated per RR4033
- 10:1010:10, 14 April 2025 diff hist +181 751.31 Open Concrete Intermediate Bents →751.31.3 Reinforcement: updated per RR4033
- 10:0910:09, 14 April 2025 diff hist +17 751.31 Open Concrete Intermediate Bents →751.31.2.4 Column Analysis: updated per RR4033
- 10:0710:07, 14 April 2025 diff hist +226 751.31 Open Concrete Intermediate Bents →751.31.2.3 General Design Assumptions: updated per RR4033
- 10:0410:04, 14 April 2025 diff hist +535 751.31 Open Concrete Intermediate Bents →751.31.1 General: updated per RR4033
- 09:5909:59, 14 April 2025 diff hist +461 751.22 Prestressed Concrete I Girders →751.22.2.7 Dowel Bars: updated per RR4033
- 09:5809:58, 14 April 2025 diff hist +154 751.11 Bearings →751.11.2.1 Elastomeric Bearings: updated per RR4033 current
- 09:3509:35, 14 April 2025 diff hist +289 Recent Policy Changes in the EPG No edit summary
- 09:0309:03, 14 April 2025 diff hist −1 751.9 Bridge Seismic Design →751.9.3.1.7 T- Joint Connections for LFD
- 09:0009:00, 14 April 2025 diff hist +6 751.40 LFD Widening and Repair →751.40.8.11.5 T- Joint Connections: updated
- 08:5408:54, 14 April 2025 diff hist −1 751.40 LFD Widening and Repair →751.40.8.11.5 T- Joint Connections
- 08:5208:52, 14 April 2025 diff hist −2 751.40 LFD Widening and Repair →751.40.8.11.5 T- Joint Connections: updated formatting
- 08:5108:51, 14 April 2025 diff hist +19,103 751.40 LFD Widening and Repair →751.40.8.11.4 Spread Footings: added 751.40.8.11.5, updated per RR4033
- 08:4708:47, 14 April 2025 diff hist −18,844 751.9 Bridge Seismic Design →751.9.3.1.7 T- Joint Connections: updated per RR4033
- 08:4408:44, 14 April 2025 diff hist +24,418 751.9 Bridge Seismic Design →751.9.1.2: updated per RR4033
- 08:4008:40, 14 April 2025 diff hist −31 751.5 Structural Detailing Guidelines →751.5.9.2.6 Cover Limits: updated per RR4033
- 08:3908:39, 14 April 2025 diff hist +284 751.5 Structural Detailing Guidelines →751.5.9.2.5 Spacing Limits: updated per RR4033
- 08:3108:31, 14 April 2025 diff hist +1,083 Recent Policy Changes in the EPG No edit summary
- 08:2808:28, 14 April 2025 diff hist −39 1044.5 Laboratory Testing Guidelines for Sec 1044 →1044.5.1.2 Physical Tests: updated per RR4030 current