User contributions for Hoskir
Jump to navigation
Jump to search
24 August 2026
- 12:2112:21, 24 August 2026 diff hist +4,308 User:Hoskir/Revision Request 4256 →321.2.2.3 Box Culverts
- 12:1112:11, 24 August 2026 diff hist +4,365 User:Hoskir/Revision Request 4256 →321.2.2 Technical Guidelines for Geotechnical Investigations
- 12:0112:01, 24 August 2026 diff hist −11,013 User:Hoskir/Revision Request 4256 →321.2.4 Technical Guidelines for Geotechnical Investigations
- 12:0012:00, 24 August 2026 diff hist −1,543 User:Hoskir/Revision Request 4256 →321.2.2 Policy Sources
- 11:5911:59, 24 August 2026 diff hist −1,450 User:Hoskir/Revision Request 4256 →321.2.1.3 "Special Investigations"
- 11:5911:59, 24 August 2026 diff hist −10,187 User:Hoskir/Revision Request 4256 →321.2.3 Performing Foundation Investigations For Structures
- 11:5911:59, 24 August 2026 diff hist −1,824 User:Hoskir/Revision Request 4256 →321.2.1.2 Types of Reports
- 11:5811:58, 24 August 2026 diff hist −2,398 User:Hoskir/Revision Request 4256 →321.2.1.1 Geotechnical Organization of MoDOT
- 11:4411:44, 24 August 2026 diff hist +3 User:Hoskir →Revisions
- 11:4311:43, 24 August 2026 diff hist +427 User:Hoskir No edit summary
- 11:3811:38, 24 August 2026 diff hist +76 User:Hoskir No edit summary
- 11:3311:33, 24 August 2026 diff hist −912 User:Hoskir No edit summary
- 11:2811:28, 24 August 2026 diff hist −228 User:Hoskir No edit summary
- 09:1909:19, 24 August 2026 diff hist −5 User:Hoskir/Revision Request 4267 →616.19.6.3.1.2 Dynamic Late Merge/Zipper Merge
- 09:1209:12, 24 August 2026 diff hist +1 User:Hoskir/Revision Request 4267 →616.19.7 Traffic Pacing/Rolling Roadblock
- 09:0309:03, 24 August 2026 diff hist +1 User:Hoskir/Revision Request 4267 →616.19.6.3.1.6 Work Zone Intelligent Transportation System and Temporary Traffic Incident Management System=
- 09:0209:02, 24 August 2026 diff hist +15 User:Hoskir/Revision Request 4267 →616.19.6.3 Work Zone Intelligent Transportation Systems (WZITS) Strategy Selection
- 09:0109:01, 24 August 2026 diff hist +1 User:Hoskir/Revision Request 4267 →=616.19.6.3.1 Work Zone Intelligent Transportation Systems (WZITS) Strategy Description
- 09:0109:01, 24 August 2026 diff hist −2 User:Hoskir/Revision Request 4267 No edit summary
- 08:5908:59, 24 August 2026 diff hist +903 User:Hoskir/Revision Request 4267 No edit summary
- 08:1608:16, 24 August 2026 diff hist +30,221 N User:Hoskir/Revision Request 4267 Created page with "<div style="float: right; margin-top: 5px; margin-left: 15px; margin-bottom: 15px;">__TOC__</div> When lane closures are required for road construction, rehabilitation, or maintenance activities, the capacity of the roadway may be greatly reduced. Capacities differ for interstates, freeways, multiple-lane routes and two-lane roadways due to the number of closed lanes, how the project will affect the surrounding roadways, and geometrics of the roadway. When the reduction..."
- 07:3607:36, 24 August 2026 diff hist +27 N File:MMS tv map.png File uploaded with MsUpload current
- 07:3407:34, 24 August 2026 diff hist +27 N File:AADT map.png File uploaded with MsUpload current
- 07:1607:16, 24 August 2026 diff hist +9 User:Hoskir →Revisions
- 07:1507:15, 24 August 2026 diff hist +61 User:Hoskir →Revisions
21 August 2026
- 12:1712:17, 21 August 2026 diff hist −9,774 User:Hoskir/Revision Request 4256 →321.2.3.3 General Procedures
- 12:1612:16, 21 August 2026 diff hist +130 User:Hoskir/Revision Request 4256 →321.2.2 Technical Guidelines for Geotechnical Investigations
- 12:1212:12, 21 August 2026 diff hist +14,313 User:Hoskir/Revision Request 4256 No edit summary
- 11:1611:16, 21 August 2026 diff hist +78,934 User:Hoskir/Revision Request 4256 No edit summary
- 11:1011:10, 21 August 2026 diff hist +5,377 N User:Hoskir/Revision Request 4256 Created page with "<div style="float: right; width: 660px;"> <div style="float: right; margin: 5px; margin-bottom: 10px; padding: 10px; border: 1px solid black; border-radius:5px; box-shadow:5px 5px 5px #888888"> <categorytree mode=all>321 Geotechnical Engineering</categorytree></div> {| style="padding: 10px; margin-left:15px; margin-top: 5px; border:1px solid #a9a9a9; background:#f8f9fa" width="650px" align="right" |- | style="text-align:center;" | '''<u>Reference Documents</u>''' |- |..."
- 10:0710:07, 21 August 2026 diff hist +70 User:Hoskir No edit summary
- 09:5109:51, 21 August 2026 diff hist +441 m 902.21 Designing a MoDOT Traffic Signal worksheets were accidentally removed during the MUTCD update; some menu formatting updates current
19 August 2026
- 12:1812:18, 19 August 2026 diff hist −38 m 236.17 Junkyards →236.17.12 Junkyards Affected by Highway Projects: fixed link to 236.16.19 current
- 12:1612:16, 19 August 2026 diff hist −40 m 236.17 Junkyards →236.17.14 Financial Transactions: fixed link to 236.16.23
18 August 2026
- 10:2210:22, 18 August 2026 diff hist −3 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: updated link to DBE Identification submittal form per RR4258
- 10:2110:21, 18 August 2026 diff hist −3 m LPA:136.10 Advertisement for Bid and Project Award →136.10.6.6 Disadvantaged Business Enterprise (DBE) Requirements: updated link to DBE Identification submittal form per RR4258
- 10:2010:20, 18 August 2026 diff hist −3 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.15 Disadvantaged Business Enterprise (DBE) (49 CFR Part 26): updated link to DBE Identification submittal form per RR4258
- 10:1810:18, 18 August 2026 diff hist −3 LPA:136.9 Plans, Specs and Estimates (PSE) updated link to DBE Identification submittal form per RR4258
- 09:3409:34, 18 August 2026 diff hist 0 File:Tougher Choices Direction - Signs-07-23.pdf Hoskir uploaded a new version of File:Tougher Choices Direction - Signs-07-23.pdf current
- 09:3309:33, 18 August 2026 diff hist 0 File:Do Not Replace - Limited Use 07-23.docx Hoskir uploaded a new version of File:Do Not Replace - Limited Use 07-23.docx current
- 08:3708:37, 18 August 2026 diff hist +505 m Recent Policy Changes in the EPG No edit summary
- 06:5906:59, 18 August 2026 diff hist −1,517 Category:903 Highway Signing (MUTCD Part 2) updated per RR4259
17 August 2026
- 13:1913:19, 17 August 2026 diff hist +61 User:Hoskir →Revisions
- 12:3012:30, 17 August 2026 diff hist 0 m 103.1 Bid Opening and Award Process →103.1.2.1 Emergency Work Procurement Process: moved comma in first sentence
11 August 2026
- 11:1411:14, 11 August 2026 diff hist 0 m 121.7 Program Estimates updated eprojects to mo projects
- 11:1311:13, 11 August 2026 diff hist 0 m 110.3 Prevailing Wages and Records (Guidance for Sec 110.3) →110.3.1 Employee Interviews: updated eprojects to mo Projects
- 11:1211:12, 11 August 2026 diff hist 0 m 105.19 Digital Signatures (Sec 105.19) updated eprojects to mo projects current
10 August 2026
- 13:2713:27, 10 August 2026 diff hist +23 m Category:941 Permits and Access Requests →941.6.3.4 Section 9 Requirements for Local Government Projects: updated link to sovereign immunity limits
7 August 2026
- 14:1214:12, 7 August 2026 diff hist +24 User:Hoskir →Revisions
- 14:0814:08, 7 August 2026 diff hist +1,748 N User:Hoskir/Revision Request 4254 Created page with "<hr style="border:none; height:2px; background-color:red;" /><span style="background:#00FF00">copy 901.7.5</span><hr style="border:none; height:2px; background-color:red;" /> <br> ==901.7.5 Underpass Lighting== right|thumb|225px|<center>'''Underpass Lighting'''</center> Underpasses over 75 ft. long, measured at right angles to the structure, are lighted with underpass luminaires when necessary to maintain the continuity of exist..." current