Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m (EPG 751.1.2.6)
Line 30: Line 30:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2" |    [[image:Main Page Aug 15, 2014.jpg|center|390px|thumb|<center>'''  Maintc. Worker David Poynter ensures the trench is level as Sr. Maintc. Worker Tim Porter digs for a county road [http://epg.modot.mo.gov/index.php?title=171.5_Drainage#171.5.1_Pipe.2FWater_Flow drain pipe] on Rte. Y in Clinton County.  '''  </center>]]
+
|colspan="2" |    [[image:Main Page Aug 18, 2014.jpg|center|390px|thumb|<center>'''  Sr. Chemist Jeff Wilson pours asphalt binder for [[460.1 Quality Control/Quality Assurance|quality assurance testing]].  '''  </center>]]
 
|-
 
|-
|colspan="2" |    [[image:Main Page Aug 13, 2014.jpg|center|390px|thumb|<center>'''  Maintc. Crew Leaders Cody Key (left) and Sr. Maintc. Worker Chad Embrey (right) are part of the crew patching Webster County Rte. PP near Fordland.  '''  </center>]]
+
|colspan="2" |    [[image:Main Page Aug 15, 2014.jpg|center|390px|thumb|<center>'''  Maintc. Worker David Poynter ensures the trench is level as Sr. Maintc. Worker Tim Porter digs for a county road [http://epg.modot.mo.gov/index.php?title=171.5_Drainage#171.5.1_Pipe.2FWater_Flow drain pipe] on Rte. Y in Clinton County.  '''  </center>]]
 
|-
 
|-
|colspan="2" |  [[image:Main Page Aug 12, 2014.jpg|center|390px]]
+
|colspan="2" |  [[image:Main Page Aug 13, 2014.jpg|center|390px|thumb|<center>'''  Maintc. Crew Leaders Cody Key (left) and Sr. Maintc. Worker Chad Embrey (right) are part of the crew patching Webster County Rte. PP near Fordland.  '''  </center>]]
|-
 
|<center>'''  When [[910.3 Dynamic Message Signs (DMS)| Dynamic Message Signs]] are not showing emergency or lane closure information, they display safety remindersRecently, they have been given a hint of sarcasm and humor to resonate with motorists.  '''  </center>
 
|-
 
|colspan="2" |    [[image:Main Page 2 Aug 12, 2014.jpg|center|390px]]
 
 
|}
 
|}
  
Line 49: Line 45:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2" | [[image:Main Page Aug 8, 2014.jpg|center|390px|thumb|<center>'''  Construction continues on the new [http://www.modot.org/stlouis/major_projects/newdanielboonebridge.htm I-64 Daniel Boone Bridge over the Missouri River].      '''  </center>]]
+
|colspan="2" | [[image:Main Page Aug 12, 2014.jpg|center|390px]]
 +
|-
 +
|<center>'''  When [[910.3 Dynamic Message Signs (DMS)| Dynamic Message Signs]] are not showing emergency or lane closure information, they display safety reminders. Recently, they have been given a hint of sarcasm and humor to resonate with motorists.   '''  </center>
 +
|-
 +
|colspan="2" |    [[image:Main Page 2 Aug 12, 2014.jpg|center|390px]]
 
|}
 
|}
  
Line 56: Line 56:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-August, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-August, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 100191 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 146278
+
|'''20.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 100262 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 146442
 
|-
 
|-
|'''19.'''  [[751.5 Standard Details|EPG 751.5]], 101121     ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 174611
+
|'''19.'''  [[751.5 Standard Details|EPG 751.5]], 101444     ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 175343
 
|-
 
|-
|'''18.'''    [[903.6 Warning Signs|EPG 903.6]], 101457 ||'''8.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 179599
+
|'''18.'''    [[903.6 Warning Signs|EPG 903.6]], 101776 ||'''8.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 179772
 
|-
 
|-
|'''17.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 105050     ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 180718
+
|'''17.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 105170     ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 181101
 
|-
 
|-
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 106859   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 183027
+
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 107005   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 183969
 
|-
 
|-
|'''15.'''    [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 110746   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 220860
+
|'''15.'''    [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 110839   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 221357
 
|-
 
|-
|'''14.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 111230 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 229068
+
|'''14.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 111801 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 229292
 
|-
 
|-
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 113800   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 246926
+
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 113944   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 247126
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 126254 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 277336
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 126393 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 277633
 
|-
 
|-
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 143109 ||'''1.''' EPG Main Page, 1666384
+
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 143223 ||'''1.''' EPG Main Page, 1669618
 
|}
 
|}
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[751.1 Preliminary Design#751.1.2.6.3.3 Roadway Fill|EPG 751.1.2.6.3.3 Roadway Fill]]'''
 +
 +
8/18/14: Guidance for the minimum fill over box culverts under roadway has been added.
 +
 
'''[[903.10 General Service Signs#903.10.1 Sizes of General Service Signs (MUTCD Section 2I.01)|EPG 903.10.1 Sizes of General Service Signs]]'''
 
'''[[903.10 General Service Signs#903.10.1 Sizes of General Service Signs (MUTCD Section 2I.01)|EPG 903.10.1 Sizes of General Service Signs]]'''
  
Line 173: Line 177:
 
'''[[:Category:109 Measurement and Payment#Contractor's Affidavit Regarding Settlement of Claims (C-242)|Contractor's Affidavit Regarding Settlement of Claims (C-242)]]'''
 
'''[[:Category:109 Measurement and Payment#Contractor's Affidavit Regarding Settlement of Claims (C-242)|Contractor's Affidavit Regarding Settlement of Claims (C-242)]]'''
  
7/1/14: New guidance has been provided, reflecting existing C-242 practice, that answers what the RE should do when contacted by suppliers or subcontractors claiming they have not been paid by the prime contractor.
+
7/1/14: New guidance has been provided, reflecting existing C-242 practice, that answers what the RE should do when contacted by suppliers or subcontractors claiming they have not been paid by the prime contractor.
 
 
'''New Request for Environmental Services (RES) Form'''
 
 
 
6/30/14: The new [http://res/pages/default.aspx RES Form] and the associated [http://sharepoint/systemdelivery/RW/environmental_historic_pres/_layouts/WordViewer.aspx?id=/systemdelivery/RW/environmental_historic_pres/Shared%20Documents/RES%20instructions.docx&Source=http%3A%2F%2Fsharepoint%2Fsystemdelivery%2FRW%2Fenvironmental_historic_pres%2FShared%2520Documents%2FForms%2FAllItems%2Easpx%3FInitialTabId%3DRibbon%252EDocument%26VisibilityContext%3DWSSTabPersistence&DefaultItemOpen=1 instructions for the RES Form] are now available.
 

Revision as of 14:27, 18 August 2014

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available


WELCOME
RECENT POLICY CHANGES IN THE EPG
Sr. Chemist Jeff Wilson pours asphalt binder for quality assurance testing.
Maintc. Worker David Poynter ensures the trench is level as Sr. Maintc. Worker Tim Porter digs for a county road drain pipe on Rte. Y in Clinton County.
Maintc. Crew Leaders Cody Key (left) and Sr. Maintc. Worker Chad Embrey (right) are part of the crew patching Webster County Rte. PP near Fordland.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Main Page Aug 12, 2014.jpg
When Dynamic Message Signs are not showing emergency or lane closure information, they display safety reminders. Recently, they have been given a hint of sarcasm and humor to resonate with motorists.
Main Page 2 Aug 12, 2014.jpg
Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-August, the numbers of hits are:
20. EPG 400, 100262 10. EPG 616, 146442
19. EPG 751.5, 101444 9. EPG 101, 175343
18. EPG 903.6, 101776 8. EPG 600, 179772
17. EPG 134, 105170 7. EPG 616.23, 181101
16. EPG 136.4, 107005 6. EPG 136.12, 183969
15. EPG 751.40, 110839 5. EPG 100, 221357
14. EPG 136.9, 111801 4. EPG 700, 229292
13. EPG 620.2, 113944 3. EPG 900, 247126
12. EPG 903, 126393 2. EPG 751, 277633
11. EPG 200, 143223 1. EPG Main Page, 1669618

EPG 751.1.2.6.3.3 Roadway Fill

8/18/14: Guidance for the minimum fill over box culverts under roadway has been added.

EPG 903.10.1 Sizes of General Service Signs

8/13/14: General Service Signs have been discontinued. They shall be left in place until they reach the end of their service life.

Land Disturbance Training 2014 and Land Disturbance Tablet Training 2014

8/13/14: In EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP), the Land Disturbance Training 2014, a summarized refresher presentation, was updated. Also, a video, Land Disturbance Tablet Training 2014, is now available for ipad and tablet users.

EPG 750.7.11.1 Minimum Fill Heights

8/12/14: Guidance has been added for minimum fill heights over box culverts. Also, guidance for minimum fill heights over pipes was updated.

Standard Detailing Notes

8/8/14: Note A1.1 was updated for LRFD Seismic Design.

EPG 751.5.3 Hydraulics

8/8/14: Guidance and flood data tables were updated to be consistent with practical design.

EPG 622.2.1 Construction Inspection for Diamond Grinding of Existing Portland Cement Concrete Pavement

8/7/14: MoDOT and MDNR have agreed to a sixth precaution involving dispersal of diamond grinding residue.

EPG 236.5.14 Release of Temporary Easements and Retention Clauses

8/6/14: A fourth method is now available to release temporary easements or retention clauses.

Sidewalks

8/5/14: A new paragraph at the bottom of Maintenance Responsibility clarifies existing policy. Guidance in EPG 642.1.1 Sidewalk Location and Width was revised to reflect the 4 ft. minimum width allowed after approval through the Design Exception process.

Updated QRGs

8/4/14: Two QRGs, Emergency Contacts and Line Item Adjustments, have been updated in EPG 101 Standard Forms.

EPG 902.15 Designing a Traffic Signal

8/1/14: The Signal Design Worksheets spreadsheet is now available.

Standard Detailing Note

7/29/14: The new note, A5.6, will be used for all concrete superstructures where precast panels are used.

EPG 903.4.12 Overhead Sign and Truss Inspection/Inventory

7/29/14: This revison reflects the decision to move sign truss inspection responsibility to Bridge. There is no approved inspection frequency at this time.

EPG 203 Compacting in Cut

7/25/14: The extent of cut compaction has been extended to include unclassified material areas that fit the description of Class A material.

Design Exception Process

7/21/14: In EPG 131.1.5.1 Safety Related Features, AASHTO's Highway Safety Manual analysis has been clarified.

Standard Detailing Note B3.33

7/21/14: In EPG 751.50, Note B3.33 was added stating the maximum actual weight of corrugated steel stay in place forms used for girder loading. The weight of stay in place corrugated forms was not included on plans before, but since the depth of these forms is to be designed by manufacturer, the assumed weight of these forms for girder loading is given as a limit.

EPG 236.3.7.3 Contents of Clearance Certification

7/16/14: The copy of the estimate captioned "Acquisition Complete" is no longer to be attached to the certification when the project is certified clear.

FY 2015 Contract Level Course and Seal Coat Projects

7/14/14: Updated guidance for FY 2015 Contract Level Course and Seal Coat projects is now available in EPG 409 Seal Coat and EPG 402 Bituminous Surface Leveling. Each district will need to submit a list of their FY15 Contract Level Course and Seal Coat projects to allow statewide review of the groupings. Also, the PS&E submittal date will be pushed back to July 21, 2014 for the Contract Level Course and Seal Coat projects in the September 19, 2014 bid opening, to allow for revisions to be incorporated.

Mechanical Bar Splices

7/10/16: In EPG 751.5.11.1, new guidance specifies the need for additional mechanical bar splices when required in the approach slabs because of stage construction. Also, new Standard Detailing Notes, A3.6 and B1.9.7 were added and C.3 Mechanical Bar Splices was deleted.

ROW Leases and Airspace License Agreements

7/8/14: Guidance has been clarified and figures updated in EPG 236.5.25.6 Security Assessment for Leased Areas Over or Under Highway Structures.

Updated QRGs

7/8/14: Two QRGs, Digital Signature for Adobe Pro 10 (Contractors) and Digital Signature for Adobe Pro 10 (MoDOT), have been updated in EPG 101 Standard Forms.

Contractor Performance Evaluation

7/2/14: EPG 102.2 Contractor Performance Rating System now presents the latest version of the Contractor Performance Evaluation Example Form.

PPE Posters

7/2/14: New PPE requirements are in effect for all MoDOT workers on MoDOT right of way with slightly different requirements for daytime workers, daytime flaggers, nighttime workers and nighttime flaggers. The most significant change is for nighttime flaggers (who shall wear highly visible and reflective hard hats). Contractors are also being held to the same standards as MoDOT employees.

EPG 104.13.2 Value Engineering Proposals, Concept Proposal

7/1/14: Guidance has been expanded to clarify for the resident engineers and any contractors of the minimum expectations for VECP and PDVECP submittal information.

Contractor's Affidavit Regarding Settlement of Claims (C-242)

7/1/14: New guidance has been provided, reflecting existing C-242 practice, that answers what the RE should do when contacted by suppliers or subcontractors claiming they have not been paid by the prime contractor.