User contributions for Kleins1
Jump to navigation
Jump to search
1 December 2022
- 15:1915:19, 1 December 2022 diff hist +19 m 617.2 Construction Inspection Guidelines for Sec 617 Clarifying NCHRP 350 is the latest approved crash test for Type F three-loop concrete barrier. current
28 November 2022
- 16:3416:34, 28 November 2022 diff hist +11 m 903.3 Ground-Mounted Sign Supports →903.3.4.3 Perforated Square Steel Tube Posts (PSST)
- 13:0813:08, 28 November 2022 diff hist +1 m 903.3 Ground-Mounted Sign Supports →903.3.4.3 Perforated Square Steel Tube Posts (PSST)
8 September 2022
- 15:0415:04, 8 September 2022 diff hist +53 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way per TS Division
7 September 2022
- 09:1009:10, 7 September 2022 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities: per revision 3536
- 09:0809:08, 7 September 2022 diff hist 0 N File:136.6.18photo.JPG No edit summary current
6 September 2022
- 15:2415:24, 6 September 2022 diff hist +108 m LPA:136.6 Environmental and Cultural Requirements Updated per revision request #3536
2 August 2022
28 July 2022
- 14:2514:25, 28 July 2022 diff hist −146 m Category:941 Permits and Access Requests →941.10.2.2.3 LPRs and PTZs Installed on New Stand-Alone Structures: ; minor revision per revision #3530
- 14:2514:25, 28 July 2022 diff hist −146 m Category:941 Permits and Access Requests →941.10.2.2.2 LPRs and PTZs Installed on non-MoDOT Structures: : minor edit per revision request #3530
27 July 2022
- 10:2410:24, 27 July 2022 diff hist 0 N File:EPG 753.15.pdf No edit summary current
25 July 2022
- 10:4510:45, 25 July 2022 diff hist +1,694 Category:501 Concrete Updated per COCM Revision Req. #3478
15 July 2022
- 11:0811:08, 15 July 2022 diff hist +49 m 643.3 Policy, Standards and Regulations →643.3.1 Application for Permits: updated link
- 10:4910:49, 15 July 2022 diff hist +78 m Category:948 Incident Response Plan and Emergency Response Management updated link
30 June 2022
- 14:3114:31, 30 June 2022 diff hist +16 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way Updated flier document per MT and CR request
- 14:2814:28, 30 June 2022 diff hist 0 N File:UnauthorizedItemsoffRoadsidesFlier 2021.pdf No edit summary current
2 June 2022
- 12:3112:31, 2 June 2022 diff hist +1 m Category:129 Public Involvement →129.3 “Virtual” Public Involvement (VPI)
3 May 2022
- 15:4815:48, 3 May 2022 diff hist −4 m Category:143 Practical Design updated minimum guardrail height
22 April 2022
- 13:0213:02, 22 April 2022 diff hist −104 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.2 Survey Report: Survey_Report.pdf and Survey_Report_Example.pdf were uploaded directly into the EPG due to a broken SP link.
- 12:5412:54, 22 April 2022 diff hist 0 N File:Survey Report Example.pdf No edit summary
- 12:5312:53, 22 April 2022 diff hist 0 N File:Survey Report.pdf No edit summary
8 April 2022
- 09:0309:03, 8 April 2022 diff hist +6 m 131.2 Proprietary Items and Public Interest Findings →131.2.2.1 Requests for use of a Proprietary Item
17 March 2022
- 11:4911:49, 17 March 2022 diff hist 0 m Category:612 Impact Attenuators Corrected spelling errors
27 January 2022
- 13:4413:44, 27 January 2022 diff hist 0 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System
19 January 2022
- 10:5910:59, 19 January 2022 diff hist 0 147.3 Job Order Contracting (JOC) No edit summary
12 January 2022
- 10:5410:54, 12 January 2022 diff hist −54 m Category:101 Standard Forms →Scoping
- 10:4610:46, 12 January 2022 diff hist 0 N File:Project Estimate Quality Assurance Report.docx No edit summary current
10 January 2022
- 13:1613:16, 10 January 2022 diff hist 0 File:Preparing As-Built Plans 2019.pdf Kleins1 uploaded a new version of File:Preparing As-Built Plans 2019.pdf current
7 January 2022
- 14:2214:22, 7 January 2022 diff hist +8 Help Article →FHWA Contacts
- 14:2014:20, 7 January 2022 diff hist +3 Help Article →Division Contacts
28 December 2021
- 16:4816:48, 28 December 2021 diff hist +3 m Main Page No edit summary
15 December 2021
- 15:5615:56, 15 December 2021 diff hist −775 m 147.3 Job Order Contracting (JOC) No edit summary
- 13:0113:01, 15 December 2021 diff hist +886 147.3 Job Order Contracting (JOC) Revisions to EPG 147.3 JOCs per Design and FHWA
9 December 2021
- 01:5501:55, 9 December 2021 diff hist −68 m 606.2 Guard Cable →606.2.3.1 Lateral Placement in the Median
- 01:4701:47, 9 December 2021 diff hist −28 m 606.2 Guard Cable →606.2.2 Warrants
- 01:4101:41, 9 December 2021 diff hist −478 606.2 Guard Cable →606.2.3.4 Slopes: This article is being edited based on ballot comments effective January 2022
- 01:3801:38, 9 December 2021 diff hist +704 606.2 Guard Cable →606.2.4 Maintenance and Repair: This article has been updated based on ballot comments for January 2022 effective date.
- 01:2301:23, 9 December 2021 diff hist +1 m 606.2 Guard Cable →606.2.1 Guard Cable Types
- 01:2201:22, 9 December 2021 diff hist 0 m 606.2 Guard Cable →606.2.1 Guard Cable Types
- 01:1101:11, 9 December 2021 diff hist −960 606.2 Guard Cable →606.2.4 Maintenance and Repair: This article was NOT intended to be updated (see ballot comments)
21 November 2021
- 22:3722:37, 21 November 2021 diff hist +42 m 131.2 Proprietary Items and Public Interest Findings →131.2.2.1 Requests for use of a Proprietary Item
9 November 2021
- 12:2912:29, 9 November 2021 diff hist −1 m Category:101 Standard Forms No edit summary
12 October 2021
- 12:4412:44, 12 October 2021 diff hist −92 m LPA:136.11 Local Public Agency Construction Removed Fig. 136.11.16
- 11:2011:20, 12 October 2021 diff hist 0 N File:134.2.2.5.3 Oct 2021.docx No edit summary current
6 October 2021
- 14:4014:40, 6 October 2021 diff hist 0 N File:123 PoDI Matrix MoDOT PY2022.xlsx No edit summary
- 14:4014:40, 6 October 2021 diff hist +14 Category:123 Federal-Aid Highway Program →PoDI Information
17 August 2021
- 14:3614:36, 17 August 2021 diff hist −13 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
12 August 2021
- 11:4211:42, 12 August 2021 diff hist +1 m Category:450 Bituminous Pavement Design →450.1 Asphalt Binder
12 July 2021
- 11:3911:39, 12 July 2021 diff hist +26 m 147.3 Job Order Contracting (JOC) →147.3.10 Guardrail and Guard Cable Repair
24 June 2021
- 10:0510:05, 24 June 2021 diff hist −4 m Category:239 Construction Inspection Guidelines for Final Plans No edit summary