User contributions for Redirect fixer
A user with 11 edits. Account created on 18 January 2012.
20 January 2017
- 11:3211:32, 20 January 2017 diff hist +16 132.2 Missouri's Blueprint to Arrive Alive 132.2 Missouri's Blueprint to Save More Lives has been moved, it is now a redirect to 132.2 Missouri's Blueprint - A Partnership Toward Zero Deaths current
10 November 2016
- 09:0509:05, 10 November 2016 diff hist −1 771.18 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler has been moved, it is now a redirect to 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) current
- 09:0509:05, 10 November 2016 diff hist −1 771.16 Bridge Deck Crack Pouring 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler has been moved, it is now a redirect to 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) current
17 June 2016
- 11:0111:01, 17 June 2016 diff hist −6 903.3 Overhead Guide Sign Mounting 903.4 Overhead Guide Sign Mounting has been moved, it is now a redirect to 903.4 Overhead Sign Mounting current
27 July 2015
- 08:4108:41, 27 July 2015 diff hist +12 751.40 Widening and Repair (Non-LRFD) 751.40 Widening and Repair (Non-LFD) has been moved, it is now a redirect to 751.40 Widening and Repair (LFD and Not Updated) current
- 08:4108:41, 27 July 2015 diff hist +12 751.40 Widening and Repair 751.40 Widening and Repair (Non-LFD) has been moved, it is now a redirect to 751.40 Widening and Repair (LFD and Not Updated) current
8 July 2015
- 08:1808:18, 8 July 2015 diff hist −1 751.40 Widening and Repair 751.40 Widening and Repair (Non-LRFD) has been moved, it is now a redirect to 751.40 Widening and Repair (Non-LFD)
22 June 2015
- 12:2912:29, 22 June 2015 diff hist +15 748.8 Bridge Drainage 748.7 Bridge Deck Drainage has been moved, it is now a redirect to 748.7 Bridge Deck and Bridge End Drainage current
10 June 2015
- 12:2512:25, 10 June 2015 diff hist 0 771.16 Bridge Deck Crack Pouring 771.18 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler has been moved, it is now a redirect to 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler
23 April 2012
- 14:1814:18, 23 April 2012 diff hist −3 136.9 Final Design 136.9 Plans, Specs and Estimates (PS & E) has been moved, it is now a redirect to 136.9 Plans, Specs and Estimates (PSE) current
18 January 2012
- 14:1314:13, 18 January 2012 diff hist −5 620.12 3M Tape 620.14 3M Tape Installation Contract has been moved, it is now a redirect to 620.14 3M Installation Contract current