User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:07, 18 February 2021 diff hist +122 m LPA:136.13 LPA Policy Changes Fig. 136.3.20, BEAP Project Tracking Form
- 11:05, 18 February 2021 diff hist -5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20 BEAP Project Tracking Form
- 11:04, 18 February 2021 diff hist 0 N File:Fig.136.3.20 2021.docx
- 11:03, 18 February 2021 diff hist -10 m LPA:136.3 Federal Aid Basics Per BR, minor revisions for Fig. 136.3.20, BEAP Project Tracking Form
- 09:18, 18 February 2021 diff hist -61 m 147.3 Job Order Contracting (JOC) removed errant link
- 08:18, 18 February 2021 diff hist -197 m Recent Policy Changes in the EPG EPG 147.3
- 08:14, 18 February 2021 diff hist +325 m 147.3 Job Order Contracting (JOC) Per DE, FHWA has incorporated their Final Rule for ID/IQ projects into 23 CFR 635 Subpart F. JOCs are a procurement means for delivering ID/IQ projects.
- 13:15, 17 February 2021 diff hist +2 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor corrections
- 11:17, 17 February 2021 diff hist +74 m Recent Policy Changes in the EPG EPG 902.5.8.4
- 11:01, 17 February 2021 diff hist +42 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.4 Record Keeping
- 10:58, 17 February 2021 diff hist +144 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8 Responsibility for Operation and Maintenance (MUTCD Section 4D.02): Per TS, new Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist
- 10:22, 17 February 2021 diff hist 0 N File:902.5.8.3.1 checklist.xlsx current
- 10:20, 17 February 2021 diff hist +133 m Category:101 Standard Forms →Financial Services: Per TS, added Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist
- 10:16, 17 February 2021 diff hist 0 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.36.2 Yellow Change and Red Clearance Intervals (MUTCD Section 4D.26): Per TS, minor correction
- 09:46, 17 February 2021 diff hist +38 m Recent Policy Changes in the EPG EPG 237.13.1
- 09:38, 17 February 2021 diff hist 0 N File:237.13.1 no typical.jpg current
- 09:38, 17 February 2021 diff hist +655 m 237.13 Contract Plan File Name Convention →237.13.1 Design Contract Plans: Per Bid & Contracts, clarified how to name contract plan files when typical sections are not included in the plans
- 09:51, 16 February 2021 diff hist +149 m 231.2 Clear Zones →231.2.1 Introduction: Per TS, minor clarifications current
- 09:24, 11 February 2021 diff hist +60 m Recent Policy Changes in the EPG EPG 127.1.2.1
- 09:21, 11 February 2021 diff hist +23 m 127.1 Request for Environmental Services →127.1.2.1 Location/Conceptual Plan Stage: Per Env'l, clarified that NEPA can be approved at location/conceptual plan stage for simple projects but occurs later for more complicated projects.
- 08:15, 10 February 2021 diff hist -560 m Recent Policy Changes in the EPG EPG 134.3.2
- 15:40, 9 February 2021 diff hist +146 m 751.12 Barriers, Railings, Curbs and Fences →751.12.1.3.3 End of Barrier Reinforcement: Per BR, minor correction in the barbill guidance
- 08:32, 9 February 2021 diff hist -68 m 231.4 Shoulder Width →231.4.2.1 Rural Major Routes: updated link
- 15:54, 8 February 2021 diff hist -1 m 751.13 Expansion Joint Systems →751.13.3.1 General
- 15:53, 8 February 2021 diff hist 0 N File:751.13.3.1 2021.jpg current
- 15:52, 8 February 2021 diff hist +7,704 m 751.13 Expansion Joint Systems Per BR, implemented open cell foam joint seal and updated preformed compression seal for revised manufacturer data.
- 15:35, 8 February 2021 diff hist +865 m Recent Policy Changes in the EPG
- 15:24, 8 February 2021 diff hist +569 m 751.50 Standard Detailing Notes →H5. Expansion Joint Systems: Per BR, H5f. Open Cell Foam Joint Seal (new notes for Bridge Standard Drawings)
- 14:17, 5 February 2021 diff hist -194 m Category:109 Measurement and Payment →109.12.1.1 Change Order Approval Level Criteria
- 14:16, 5 February 2021 diff hist +83 m Category:109 Measurement and Payment →109.12.3 Time Adjustment Change Orders
- 14:16, 5 February 2021 diff hist -82 m Category:109 Measurement and Payment →109.12.1.3 Contingent Items - Settlement for Cost
- 13:52, 5 February 2021 diff hist 0 N File:109.12.1 Time.pdf current
- 13:51, 5 February 2021 diff hist 0 N File:109.12.1 RE.pdf current
- 13:51, 5 February 2021 diff hist 0 N File:109.12.1 Division.pdf current
- 13:51, 5 February 2021 diff hist 0 N File:109.12.1 Chief Engineer.pdf current
- 13:50, 5 February 2021 diff hist 0 N File:109.12.1 Mobilization.pdf current
- 13:50, 5 February 2021 diff hist +170 m Category:109 Measurement and Payment →109.12 Change Orders: Per CM, updated example change orders.
- 09:24, 5 February 2021 diff hist +681 m 907.1 Safety Program Guidelines Per TS, minor clarifications
- 14:05, 4 February 2021 diff hist +56 m 751.22 Prestressed Concrete I Girders →751.22.1.4.2 Girder Length and Geometric Layout: minor clarification
- 12:01, 4 February 2021 diff hist -11 m Recent Policy Changes in the EPG
- 10:27, 4 February 2021 diff hist -176 m Recent Policy Changes in the EPG EPG 751.22.1.4
- 10:17, 4 February 2021 diff hist 0 N File:751.22.1.4.2.jpg current
- 10:17, 4 February 2021 diff hist 0 N File:751.22.1.4.1.jpg current
- 10:14, 4 February 2021 diff hist -240 m 751.22 Prestressed Concrete I Girders →751.22.1.4 Span and Structure Lengths: Per BR, guidance added from 2013 design bulletin that limited spans lengths for Type 6 (bulb-tee) girders to 105 ft. due to stabilities issues beyond this length.
- 08:53, 4 February 2021 diff hist +21 m 903.9 General Information Signs →903.9.15 River and Major Lake Name (I3-1): Per TS, added Missouri River to listing
- 14:18, 2 February 2021 diff hist +4 m 231.4 Shoulder Width →231.4.3.2 Design: Per CM and EPS, further clarified shoulder design and construction processes
- 14:17, 2 February 2021 diff hist +241 m Other Aspects of Pavement Design →Shoulder Surface: Per CM and EPS, further clarified shoulder design and construction processes
- 13:08, 2 February 2021 diff hist +1 m 751.50 Standard Detailing Notes →H3d. Laminated Neoprene Pad Assembly
- 12:28, 2 February 2021 diff hist +139 m Recent Policy Changes in the EPG EPG 751.50
- 12:15, 2 February 2021 diff hist +912 m 751.50 Standard Detailing Notes →H3. Bearings: Per BR, clarified coating requirements for Grade 50 W steel sole plate.
- 15:37, 1 February 2021 diff hist +565 m Recent Policy Changes in the EPG EPG 231.4
- 14:32, 1 February 2021 diff hist -218 m Recent Policy Changes in the EPG EPG 231.2
- 14:12, 1 February 2021 diff hist 0 N File:231.4.3.2.jpg current
- 14:11, 1 February 2021 diff hist +6,993 m 231.4 Shoulder Width Per EPS, standardized the construction of shoulder widening projects across all districts; Type A2 and Type A3 shoulders are used only in conjunction with the construction of new pavement. EPG 231.4.3 Shoulder Widening Projects revised and moved from EPG Minor Routes Shouldering Project Guidelines
- 14:06, 1 February 2021 diff hist +2 m Category:Minor Routes Shouldering Project Guidelines current
- 14:06, 1 February 2021 diff hist -5,238 m Category:Minor Routes Shouldering Project Guidelines Per EPS, standardized the construction of shoulder widening projects across all districts; Type A2 and Type A3 shoulders are used only in conjunction with the construction of new pavement. Revised guidance moved to EPG 231.4.3 Shoulder Widening Projects Tag: Replaced
- 13:54, 1 February 2021 diff hist 0 N File:231.2 Table 5-1b.docx current
- 13:53, 1 February 2021 diff hist 0 N File:231.2 Table 5-2.pdf current
- 13:53, 1 February 2021 diff hist +4,824 m 231.2 Clear Zones Per DE, guidance now incorporates additional Roadside Design Guide (RDG) verbiage, RDG tables, and recommends a safety analysis as a means of documenting decisions for safety strategies.
- 08:04, 1 February 2021 diff hist 0 m 121.5 Asset Management minor corrections
- 11:56, 28 January 2021 diff hist +8 m 236.3 Administration →B. State Funded Early Acquisition
- 11:55, 28 January 2021 diff hist +24 m 236.3 Administration →B. State Funded Early Acquisition
- 11:53, 28 January 2021 diff hist +672 m 236.3 Administration →236.3.4 Right of Way Acquisition Authority and Project Funding: Per TS, inserted links
- 11:42, 28 January 2021 diff hist -703 m 236.13 Designing Right of Way Plans Per RW, deleted archaic EPG 236.13.12 Advanced Right of Way Acquisition. Subsequent subarticles renumbered.
- 11:15, 28 January 2021 diff hist 0 m 236.3 Administration updated link
- 11:14, 28 January 2021 diff hist 0 m 236.10 Right Of Way Condemnation updated link
- 11:13, 28 January 2021 diff hist 0 m 237.9 Submission of Plans and Supporting Documents updating links
- 16:10, 27 January 2021 diff hist +65 m 236.6 Appraisal and Appraisal Review →236.6.4.2 Assignment of Appraisal Review: updated link
- 16:09, 27 January 2021 diff hist +65 m 236.6 Appraisal and Appraisal Review →236.6.1.7 Commission Member and Employee Property Valuation: updated link
- 16:08, 27 January 2021 diff hist -1 m 127.2 Historic Preservation and Cultural Resources →127.2.11 Early Acquisition of Right-of-Way and Disposal of Uneconomic Remnants
- 16:08, 27 January 2021 diff hist -45 m 127.2 Historic Preservation and Cultural Resources →127.2.11 Early Acquisition of Right-of-Way and Disposal of Uneconomic Remnants: updated link
- 16:07, 27 January 2021 diff hist +53 m 236.7 Negotiation →236.7.1.4 Protective Buying Authorization: updated link
- 16:05, 27 January 2021 diff hist -20 m 236.7 Negotiation →236.7.1 General Provisions: updated links
- 16:02, 27 January 2021 diff hist +76 m Recent Policy Changes in the EPG
- 16:01, 27 January 2021 diff hist +263 m Recent Policy Changes in the EPG EPG 127.14.3.7 and EPG 236.4
- 15:43, 27 January 2021 diff hist +5,168 m 236.3 Administration →236.3.4 Right of Way Acquisition Authority and Project Funding: Per RW, guidance updated to match FHWA requirements
- 14:52, 27 January 2021 diff hist +1,613 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents →127.14.3.6 Projects Involving New or Revised Interstate Access: Per RW, new EPG 127.14.3.7 Early and Advanced Acquisition of Right of Way guidance to match FHWA requirements
- 14:49, 27 January 2021 diff hist -3 m Category:127 MoDOT and the Environment
- 16:29, 26 January 2021 diff hist -129 m 751.1 Preliminary Design →751.1.2.31 Finishing Up Design Layout: Per BR, removed archaic guidance concerning asphalt type and thickness for optional asphalt bridge approach on minor routes.
- 15:51, 26 January 2021 diff hist +1 m 231.8 Bridge Width current
- 15:50, 26 January 2021 diff hist -12 m 231.8 Bridge Width Per BR, dropped superscript "1" at the end of the first bullet point. There was concern that on Design-build projects they would just use 2’ instead of the full shoulder width.
- 10:34, 26 January 2021 diff hist -51 m Recent Policy Changes in the EPG EPG 616.6.2.2
- 10:27, 26 January 2021 diff hist +527 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.2 Flags and Advance Warning Rail System on Signs: Per CM and TS, clarification on when to use flags on signs
- 09:13, 26 January 2021 diff hist +36 m Help Article →FHWA Contacts
- 09:11, 26 January 2021 diff hist +623 m Help Article →Division Contacts: added FHWA contacts
- 08:02, 26 January 2021 diff hist +6 m 131.2 Proprietary Items and Public Interest Findings →131.2.2.1 Requests for use of a Proprietary Item: minor clarification
- 13:48, 22 January 2021 diff hist +173 m 751.50 Standard Detailing Notes →H1. Steel: minor clarification, per BR
- 13:36, 22 January 2021 diff hist -21 m Recent Policy Changes in the EPG EPG 101 QRG
- 13:32, 22 January 2021 diff hist +125 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG, AWP CO Estimate Final
- 12:21, 22 January 2021 diff hist +31 m Recent Policy Changes in the EPG EPG 751.50
- 12:17, 22 January 2021 diff hist +29 m 751.50 Standard Detailing Notes →I. Revised Structures Notes
- 09:14, 22 January 2021 diff hist +247 m 751.50 Standard Detailing Notes →I. Revised Structures Notes: Per BR, new note I1.71 replaced detail on Bridge Std Dwg REDECK01. Added detail for new rock blankets under redecks.
- 13:59, 21 January 2021 diff hist -248 m Recent Policy Changes in the EPG EPG 129.3
- 13:56, 21 January 2021 diff hist +852 m Category:129 Public Involvement →129.3 “Virtual” Public Involvement (VPI): Per Env'l, additional information related to recording and posting virtual events
- 11:35, 21 January 2021 diff hist -2 m Category:107 Legal Relations and Responsibility to the Public →107.12 Contractor's Responsibility for Work: Per CM, minor correction
- 08:04, 21 January 2021 diff hist -13 m Category:644 Weigh Stations, Rest Areas, Welcome/Information Centers and Commuter Parking Lots →Commuter Parking Lots: updated link current
- 10:00, 20 January 2021 diff hist -42 m Recent Policy Changes in the EPG EPG 751.5.1.1.1
- 09:51, 20 January 2021 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.1.1.1 CAD Levels
- 09:43, 20 January 2021 diff hist 0 N File:751.5.1.1 CAD 2021.jpg current
- 09:43, 20 January 2021 diff hist +217 m 751.5 Structural Detailing Guidelines →751.5.1.1.1 CAD Levels: Per BR, added to list of Bridge CADD levels two levels used for internal editorial purposes; also added some basic instructions for printing editorial content in color on an otherwise black and white print drawing.