Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (New EPG 172)
m (re-titled EPG 941.29)
Line 11: Line 11:
  
 
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.   
 
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.   
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|'''[[:Category:172 Maintenance Facility Performance Expectations Environmental Compliance|EPG 172 Maintenance Facility Performance Expectations Environmental Compliance]]'''
+
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|'''[[941.29 Maintenance of Residential, Commercial and Public Road Entrances|941.29 Maintenance of Residential, Commercial and Public Road Entrances]]'''
 +
 
 +
2/2/10: EPG 941.29 Driveway Maintenance has been clarified and re-titled.
 +
 
 +
'''[[:Category:172 Maintenance Facility Performance Expectations Environmental Compliance|EPG 172 Maintenance Facility Performance Expectations Environmental Compliance]]'''
  
 
1/26/10: New guidance for environmental compliance has been provided for Maintenance facilities.
 
1/26/10: New guidance for environmental compliance has been provided for Maintenance facilities.
Line 86: Line 90:
  
 
10/20/09: The 80% limit on partial payments for structural steel material was removed.
 
10/20/09: The 80% limit on partial payments for structural steel material was removed.
 
'''[[:Category:105 Control of Work#Stockpiling Material on Bridge Decks|Stockpiling Material on Bridge Decks]]'''
 
 
10/14/09: The contractor shall not be allowed to store any material on a bridge deck without the approval of the engineer.
 

Revision as of 12:56, 2 February 2010

Engineering Policy Guide.jpg
WELCOME
RECENT POLICY CHANGES IN THE EPG
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as practical design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

941.29 Maintenance of Residential, Commercial and Public Road Entrances

2/2/10: EPG 941.29 Driveway Maintenance has been clarified and re-titled.

EPG 172 Maintenance Facility Performance Expectations Environmental Compliance

1/26/10: New guidance for environmental compliance has been provided for Maintenance facilities.

238.3.2.1 MoDOT CORS Real Time Network (RTN)

1/19/10: CADD has provided guidance describing MoDOT's GPS real time kinematic network.

EPG 1001.3.2.3 Identification of Sample

1/15/10: Expanded guidance to help inspectors correctly select concrete aggregate material codes when submitting source approvals samples to the laboratory.

MoDOT is a good steward of Missouri's natural and cultural resources

1/14/10: MoDOT's Environmental Section has provided interesting information why MoDOT performs historical preservation and environmental studies.

620.2.7 Warrants for Use of Edgelines

1/12/10: Guidance has been updated to reflect the Systemwide Safety WOW policy.

613.3 Pavement Repair Design

1/11/10: Clarification of how to estimate quantities for subgrade compaction and aggregate for base has been provided.

Pedestrian Facilities

1/06/10: Pedestrian guidance that includes Americans with Disabilities Act (ADA) has been provided in a significantly expanded 642 Pedestrian Facilities as well as in 616.24 Traffic Control for Non-Motorized Traffic and 902.2 Warrants for Traffic Signal Installation. Guidance for pedestrian pushbutton detectors has been provided in 902.6.6.7.1 Pedestrian Pushbutton Detectors.

IAS System Based Program

1/05/10: EPG 123.3 Materials Requirements has been updated to provide Independent Assurance Samples guidance for the System Based program.

236.13.8 Plan Requirements for Right of Way Plans

12/18/09: On right of way plans, the required accuracy level for non-surveyed parcels was decreased from 0.01 acre to 0.1 acre.

Aggregate Surfacing Measurement by Weight

12/7/09: Both "small" and "large" measurements have been combined into one measurement to reflect current practice. Also, Form C-214 is no longer being used, thus affecting guidance in 239.21.1 Resident Engineer's Office, ITEM NO: 310-X0.02 (310-X0.06) and several items in EPG's Section 400 .

Pedestrian Pushbutton Detectors

11/25/09: Expanded and updated guidance for pedestrian pushbotton detectors as well as new accessible pedestian signal information.

135.5.1 Wage Rate Compliance Checks

11/18/09: Guidance was updated to reflect that project documentation is now usually stored at the project office and that federal SSN rules have changed. Also, guidance for equipment rental with operator and purchase ordered work was added.

No Fluorescent Paint

10/29/09: The reference to fluorescent paint was removed from the Guidance portion of 620.3.2 Markings for Objects in the Roadway.

Measurement and Payment

10/27/09: How Central Office expects rounding to be performed relative to when work is posted to the job was clarified.

Slab Stabilization

10/22/09: New guidance for slab stabilization, including undersealing and slab jacking, has been developed to accompany new specifications (See Sec 625) and pay items.

Erosion Control Blankets and Turf Reinforcement Mats

10/22/09: Design guidance for specifying erosion control blanket types has been removed from 750.6 Erosion Control and Energy Dissipation and 806.7 Pollution, Erosion and Sediment Control and consolidated in Storm Water Pollution Prevention Plan (SWPPP). New pay items match the guidance in the SWPPP.

Project Core Team Certification No Longer Required

10/22/09: The Project Core Team Certification is no longer required. It has been removed from the EPG and the District Final Design Checklist.

Fluorescent Yellow Sheeting and Paint

10/20/09: Fluorescent yellow sheeting (instead of yellow) will now be used, as indicated, for example, in 903.6 Warning Signs, 903.8 Freeway and Expressway Guide Signs and 903.16 Traffic Controls for School Areas. Fluorescent yellow object markers and paint stripes, instead of yellow, will also now be used.

Material Allowance

10/20/09: The 80% limit on partial payments for structural steel material was removed.