Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 1080, EPG 751.50)
m (EPG 236.3.5.2)
Line 50: Line 50:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early March, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early March, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[751.5 Standard Details|EPG 751.5]], 90295 ||'''10.''' [[:Category:200 GEOMETRICS|EPG 200]], 133366
+
|'''20.'''  [[751.5 Standard Details|EPG 751.5]], 90354 ||'''10.''' [[:Category:200 GEOMETRICS|EPG 200]], 133486
 
|-
 
|-
|'''19.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 93424   ||'''9.'''  [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 147815
+
|'''19.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 93455   ||'''9.'''  [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 148119
 
|-
 
|-
|'''18.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 93759 ||'''8.''' [[:Category:101 Standard Forms|EPG 101]], 148625
+
|'''18.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 93794 ||'''8.''' [[:Category:101 Standard Forms|EPG 101]], 148729
 
|-
 
|-
|'''17.'''    [[903.6 Warning Signs|EPG 903.6]], 94088   ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 162279
+
|'''17.'''    [[903.6 Warning Signs|EPG 903.6]], 94139   ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 162487
 
|-
 
|-
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 94155   ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 166486
+
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 94344   ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 166597
 
|-
 
|-
|'''15.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 95717 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 202520
+
|'''15.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 95839 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 202648
 
|-
 
|-
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 100625 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 209770
+
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 100648 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 209955
 
|-
 
|-
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 102303   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 228156
+
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 102379   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 228315
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 112322 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 248031
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 112482 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 248342
 
|-
 
|-
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 132658 ||'''1.''' EPG Main Page, 1457864
+
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 132758 ||'''1.''' EPG Main Page, 1459785
 
|}
 
|}
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[236.3 Administration#236.3.5.2 Expenditure Accounting|EPG 236.3.5.2 Expenditure Accounting]]'''
 +
 +
3/5/14: The Payroll Cover Letter is no longer needed in the right of way expenditure accounting process.
 +
 
'''[[:Category:1080 Structural Steel Fabrication#1080.1 High Strength Bolts|EPG 1080.1 High Strength Bolts]]'''
 
'''[[:Category:1080 Structural Steel Fabrication#1080.1 High Strength Bolts|EPG 1080.1 High Strength Bolts]]'''
  
Line 167: Line 171:
 
'''[[:Category:950 Automated Traffic Enforcement|EPG 950 Automated Traffic Enforcement]]'''
 
'''[[:Category:950 Automated Traffic Enforcement|EPG 950 Automated Traffic Enforcement]]'''
  
1/10/14: There have been numerous clarifications in this article as well as the addition of new guidance for established practices (such as [[:Category:950 Automated Traffic Enforcement#950.2.2 Automated Speed Enforcement by a Law Enforcement Officer|EPG 950.2.2 Automated Speed Enforcement by a Law Enforcement Officer]]).
+
1/10/14: There have been numerous clarifications in this article as well as the addition of new guidance for established practices (such as [[:Category:950 Automated Traffic Enforcement#950.2.2 Automated Speed Enforcement by a Law Enforcement Officer|EPG 950.2.2 Automated Speed Enforcement by a Law Enforcement Officer]]).
 
 
'''MAP-21's Transportation Alternatives Program (TAP)'''
 
 
 
1/9/14: New LPA guidance, [[136.3 Federal Aid Basics#136.3.18 Transportation Alternatives Program (TAP)|EPG 136.3.18 Transportation Alternatives Program (TAP)]], is now available. TAP includes the pre-MAP-21 programs of Transportation Enhancements, Recreational Trails, Safe Routes to School and Scenic Byways.
 

Revision as of 14:45, 5 March 2014

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available
WELCOME
RECENT POLICY CHANGES IN THE EPG
Crews continue clearing roadways, in this case Rte. 63 in Howell County.
KCI Construction crews have begun Stage 2 of the Park Over the Highway project. They have demolished the old Walnut St. Bridge and are constructing a new, wider bridge as well as improvements to Walnut St. from Memorial St. to Broadway Ave.
Maintc. Crew Leader Brian Bottcher and Sr. Maintc. Workers JC Frame, Tim Williams, Brad Bowles and George Woody repair edge ruts on Rte. 13 south of Bethany during a brief break in the winter weather.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Late winter weather has brought some flooding, such as on Rte. E in Adair County.
Perhaps you've wondered how many hits the most popular EPG articles have. As of early March, the numbers of hits are:
20. EPG 751.5, 90354 10. EPG 200, 133486
19. EPG 400, 93455 9. EPG 136.12, 148119
18. EPG 136.9, 93794 8. EPG 101, 148729
17. EPG 903.6, 94139 7. EPG 616.23, 162487
16. EPG 136.4, 94344 6. EPG 600, 166597
15. EPG 134, 95839 5. EPG 100, 202648
14. EPG 751.40, 100648 4. EPG 700, 209955
13. EPG 620.2, 102379 3. EPG 900, 228315
12. EPG 903, 112482 2. EPG 751, 248342
11. EPG 616, 132758 1. EPG Main Page, 1459785

EPG 236.3.5.2 Expenditure Accounting

3/5/14: The Payroll Cover Letter is no longer needed in the right of way expenditure accounting process.

EPG 1080.1 High Strength Bolts

3/4/14: The requirements for nuts, bolts, and washers have been consolidated into EPG 1080.1. PAL sample sizes have been revised to 6 pieces (nuts, bolts or washers). AASHTO M298 has also been replaced with references to ASTM B695, the equivalent ASTM spec.

Bridge Standard Detailing Notes

3/4/14: Revisions to A1 standard notes include adjusting the design unit stresses of piles since typically contractors have a choice in grade of steel. G5 standard notes were clarified to show that closure plates are required and are included in the price of the pile. In the G6 standard notes, pile grade was added to the list of items to be included in the remarks column.

Updated QRGs

2/27/14: Change Orders was updated to clarify instruction for adding contingency items due to JSP or spec changes. Change Orders – Mobilization and Contract Bond was also updated to address how to handle mobilization and contract bond for contracts with multiple projects. 

EPG 616.27 Fleet Lighting

2/27/14: Current fleet lighting and aerial equipment lighting guidelines are now available in this new article.

EPG 751.6.1 Index of Quantities

2/26/14: New guidance is now available to clarify accuracy and rounding of estimated quantities.

Engineering Professional Services Contract Distribution

2/25/14: It is no longer required to send executed contracts to the Audits and Investigation Division.

Invoicing of Engineering Professional Services

2/24/14: EPG 134.5.1 Invoicing guidance was expanded.

Two-tube Rail

2/21/14: New guidance has been provided for two-tube bridge rail. This type of bridge rail was used in the Safe and Sound bridge program and is now available for regular use.

EPG 131.1 Design Exception Process

2/19/14: This article was generally rewritten to improve the review and approval process as well as clarify roles and responsibilities by obtaining concurrence during the early stage of the process.

Edgeline Rumble Strips

2/19/14: EPG 626.1 was revised to offer new options for urban areas: to offset the rumble strips and to limit their use.

Mandatory Reasonableness Factors for Sound Walls

2/19/14: EPG 127.13.9 was revised to reflect that the warrant for the inclusion of sound walls on a project will now use an area (sq. ft.) threshold. This area remains static regardless of market conditions.

Two New Consultant Contract Checklists

2/18/14: The Fig. 134.2.2 Processing Standard Consultant Contracts Checklist and Fig. 134.2.4 Processing On-Call/MOU Consultant Contracts Checklist are now available in EPG 134 Engineering Professional Services.

EPG 751.12 Protective Barriers

2/10/14: This article, previously EPG 751.12 Protective Barricades, was retitled to more accurately reflect its subject.

New QRG

2/4/14: Moving Files from SharePoint to CIA details how the project office is to move quality management documentation from the external SharePoint to the appropriate folder on V:\Contract Information Archive.

Subcontracts QRG

1/31/14: This QRG has been clarified.

EPG 127.13.9 Reasonableness

1/30/14: Mandatory Reasonableness Factor #3 was clarified to state that "Noise abatement measures must provide...a minimum of 7 dBA for 67 percent of benefitted first-row receptors."

EPG 751.10 General Superstructure

1/29/14: In order to provide a taller joint filler on various P/S girders to reduce costly girder steps: P/C P/S panel deck cantilever reinforcement details was added in EPG 751.10.1.7.2; Deck joint guidance was expanded in EPG 751.10.1.12; and joint filler dimensions were revised in EPG 751.10.2.1.

Standard Detailing Note C2a.3

1/29/14: This note was revised so that "to the nearest inch" is now underlined.

EPG 134.4 Contract Approval, Execution and Distribution

1/27/14: A note was added to remind project managers and contract administrators to get funds obligated prior to issuing a Notice to Proceed.

Bridge Memorandums

1/24/14: Bridge Memo guidance has been expanded and clarified in both EPG 751.1.2.17 Bridge Memorandums and EPG 751.1.3.1 Overview.

Concrete Mix Design Creation QRG

1/22/14: This QRG was updated to reflect previous spec and organization changes.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts

1/21/14: Guidance for the MOU process has been updated to reflect that all MOUs are now federally funded.

EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)

1/13/14: Best management practices (BMPs) have been both altered and removed. MoDOT will no longer utilize the nomenclature "Type I" and "Type II" ditch checks, but will utilize "Rock Ditch Check" and "Alternate Ditch Check". Please familiarize yourself with the newly revised SWPPP guidance.

EPG 950 Automated Traffic Enforcement

1/10/14: There have been numerous clarifications in this article as well as the addition of new guidance for established practices (such as EPG 950.2.2 Automated Speed Enforcement by a Law Enforcement Officer).