Difference between revisions of "Main Page"
m |
m (EPG 150, EPG 137.7) |
||
Line 30: | Line 30: | ||
{| style="margin: 1em auto 1em auto" | {| style="margin: 1em auto 1em auto" | ||
|- | |- | ||
− | |colspan="2" | [[image:Main Page June | + | |colspan="2" | [[image:Main Page June 13, 2014.jpg|center|390px|thumb|<center>''' Crews set girders on the [http://www.modot.org/kansascity/major_projects/ManchesterBridgeatI-70.htm I-70 Manchester Bridge’s] westbound bridge. Travelers will experience little impact as this aging bridge is replaced due to innovations. The new bridge will rise next to existing lanes, traffic will switch to new pavement and the old bridge will be removed with zero total closures of I-70, zero lane closures during peak periods and zero reduction in lane widths or speeds through the work zones – very rare for a major bridge replacement. ''' </center>]] |
|- | |- | ||
− | |colspan="2" | [[image:Main Page June | + | |colspan="2" | [[image:Main Page 2 June 13, 2014.jpg|center|390px|thumb|<center>''' MoDOT crews [[413.4 Bituminous Fog Sealing|fog sealing]] Rte. C in McDonald County. ''' </center>]] |
|- | |- | ||
− | |colspan="2" | [[image:Main Page June | + | |colspan="2" | [[image:Main Page June 11, 2014.jpg|center|390px|thumb|<center>''' Walsh-Alberici joint venture employees work on I-64 [http://www.modot.org/stlouis/major_projects/newdanielboonebridge.htm new Daniel Boone Bridge’s] reinforcement steel for the deck slab. The project is scheduled to have all traffic in final position by October 2015. ''' </center>]] |
|} | |} | ||
Line 45: | Line 45: | ||
{| style="margin: 1em auto 1em auto" | {| style="margin: 1em auto 1em auto" | ||
|- | |- | ||
− | |colspan="2" | [[image:Main Page | + | |colspan="2" | [[image:Main Page June 7, 2014.jpg|center|390px|thumb|<center>''' Mtnc. Crew Leader Eric Kaiser mows U.S. 63 in southern Boone County. ''' </center>]] |
|} | |} | ||
Line 52: | Line 52: | ||
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-June, the numbers of hits are:''' | |colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-June, the numbers of hits are:''' | ||
|- | |- | ||
− | |'''20.''' [[751.5 Standard Details|EPG 751.5]], | + | |'''20.''' [[751.5 Standard Details|EPG 751.5]], 95809 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 142226 |
|- | |- | ||
− | |'''19.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], | + | |'''19.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 98044 ||'''9.''' [[:Category:101 Standard Forms|EPG 101]], 163195 |
|- | |- | ||
− | |'''18.''' [[903.6 Warning Signs|EPG 903.6]], | + | |'''18.''' [[903.6 Warning Signs|EPG 903.6]], 98928 ||'''8.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 172003 |
|- | |- | ||
− | |'''17.''' [[:Category:134 Engineering Professional Services|EPG 134]], | + | |'''17.''' [[:Category:134 Engineering Professional Services|EPG 134]], 102447 ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 174650 |
|- | |- | ||
− | |'''16.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], | + | |'''16.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 105273 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 175232 |
|- | |- | ||
− | |'''15.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], | + | |'''15.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 106786 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 214965 |
|- | |- | ||
− | |'''14.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], | + | |'''14.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 109407 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 222338 |
|- | |- | ||
− | |'''13.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], | + | |'''13.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 110085 ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 241008 |
|- | |- | ||
− | |'''12.''' [[:Category:903 Highway Signing|EPG 903]], | + | |'''12.''' [[:Category:903 Highway Signing|EPG 903]], 120872 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 268021 |
|- | |- | ||
− | |'''11.''' [[:Category:200 GEOMETRICS|EPG 200]], | + | |'''11.''' [[:Category:200 GEOMETRICS|EPG 200]], 140144 ||'''1.''' EPG Main Page, 1592435 |
|} | |} | ||
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | |valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | ||
+ | '''New article, [[:Category:150 Quality Management|EPG 150 Quality Management]]''' | ||
+ | |||
+ | 6/13/14: EPG 105.23 Quality Management was updated and moved to EPG 150 Quality Management. This new article establishes file organization for Quality Management projects and increases efficiencies for users searching for files. New [[:Category:137 Construction Inspection Guidance for Records to be Maintained#137.7 Close Out Procedure for Quality Management|EPG 137.7 Close Out Procedure for Quality Management]] supports the new EPG 150 guidance. | ||
+ | |||
'''[[:Category:748 Hydraulics and Drainage|EPG 748 Hydraulics and Drainage]]''' | '''[[:Category:748 Hydraulics and Drainage|EPG 748 Hydraulics and Drainage]]''' | ||
Line 170: | Line 174: | ||
5/2/14: Guidance was clarified to state that contractors on MoDOT projects are required to pay the appropriate state or federal prevailing hourly wage rate. | 5/2/14: Guidance was clarified to state that contractors on MoDOT projects are required to pay the appropriate state or federal prevailing hourly wage rate. | ||
− | |||
− | |||
− | |||
− |
Revision as of 11:12, 13 June 2014
HELPFUL EPG VIDEOS: | •Logging into the EPG | |
•Finding Info in the EPG | ||
•Article History & How to Receive EMails When Articles are Revised | ||
___________ | ||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | ||
___________ | ||
The Electronic MoDOT Spec Book for Mobile Devices is now available |
RECENT POLICY CHANGES IN THE EPG | |||||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
New article, EPG 150 Quality Management 6/13/14: EPG 105.23 Quality Management was updated and moved to EPG 150 Quality Management. This new article establishes file organization for Quality Management projects and increases efficiencies for users searching for files. New EPG 137.7 Close Out Procedure for Quality Management supports the new EPG 150 guidance. EPG 748 Hydraulics and Drainage 6/11/14: Various changes to EPG 748 articles include: EPG Category:750 Hydraulic Analysis 6/11/14: Various changes to EPG 750 articles include: EPG 350 Design for Bases and Aggregate Surfaces 6/11/14: Guidance about daylighting pavement drainage material in was clarified in this article. 6/11/14: This subarticle was reorganized to make info easier to access. Guardrail attachment guidance was also updated. Updated QRG 6/10/14: Digital Signature for Adobe Pro 10 (Contractors) has been updated in EPG 101 Standard Forms. EPG 131.2 Proprietary Items and Public Interest Findings 6/9/14: This article has been revised to better reflect the documentational requirements of CFR 635.411. Full Wage Rate Order 6/9/14: In EPG 110.1 Wage Rates, additional guidance is now available for acceptable locations of the full wage order. Also, a description of a spreadsheet of wages in lieu of the full wage order has been provided. EPG 751.1.3.6 Asphalt Wearing Surface 6/6/14: New guidance is available for the current bridge asphalt overlay seal coat policy. Concrete Plant Inspection 6/5/14: In EPG 106.4 Plant Inspections and EPG 501.1.5 Measurement of Material, guidance was revised to clarify the QC/QA roles for concrete plant inspections. This is part of the broader quality management (QM) initiative that MoDOT has been implementing over the past two years. Design Exception Information Form 6/4/14: This form has been updated to reflect the 13 criteria recently added to EPG 131.1 Design Exception Process. EPG 236.16 Outdoor Advertising 5/30/14: This article has been generally re-written and updated to reflect legislative changes. Readers should be sure to thoroughly familiarize themselves with the article. EPG 236.7.2.6 E. Acquisition of Outdoor Advertising Billboards 5/30/14: Guidance for Outdoor Advertising Structures Considered Real Estate was clarified. New guidance for Sign Agreement Reset Program - Partial Waiver and Reset Agreement has been produced. Also, a new form, Form 236.7.2.6 Written Notice of the Intended Acquisition for Outdoor Advertising, is now available. EPG 236.6.3.1 19.D.2 Billboard Valuation Definitions 5/30/14: Definitions are now available for "Conforming Out of Standard" structure status and the "Reset Option". Also, the Appraisal Review and Approval of Just Compensation (Form 236.6.4.3) was updated. EPG 130.1.5.2 Non-Traditional Studies, Value Focused Risk Assessment 5/29/14: New guidance is available for an additional use of the Risk Assessment as a value analysis effort. EPG 606.1.3.3 Bullnose Guardrail System 5/29/14: Guidance for the use of bullnose guardrail has been clarified. 5/27/14: This new subarticle was a district Innovations Challenge winner in 2012-13. Traffic pacing facilitates short duration overhead work operations by pacing traffic at a slow speed for a predetermined distance upstream of the work area, rather than being completely stopped. District Final Design Checklist, Form D-12 5/21/14: The latest version of this form is now available. The route, county and job no. info is now more easily entered. 5/20/14: This new article presents a new method created to quantify the amount of PPA added to asphalt binders by the producer. EPG 617.1 Temporary Traffic Barriers 5/14/14: Guidance has been clarified so that there will be consistency in payment for relocating barrier wall and impact attenuators. EPG 903.3.8 Perforated Square Steel Tube Posts 5/13/14: Readers are now directed to the PSST Sepcial Sheet to provide improved guidance for PSST anchors. Quality Management SiteManager Reporting – MoDOT Staff Only 5/13/14: EPG 105.23 Quality Management has been expanded with new QM SiteManager guidance for MoDOT staff. EPG 236.3.3.2 Right of Way Cost Estimates and EPG 236.3.3.3 Preparation of Right of Way Cost Estimate Forms 5/7/14: The Acquisition Complete Cost Estimate Worksheet, Form 236.3.3.3B, is no longer used. The former Form 236.3.3.3C, Right of Way Cost Estimate, has been retitled as Form 236.3.3.3B. The new Form 236.3.3.3B from FMS is more accurate, efficient and eliminates the need for completing the final cost estimate. EPG 643.3.15 Bridge Attachment Policy and Procedures for Utilities 5/7/14: The types of utilities permitted on bridges was clarified. 5/2/14: Guidance was clarified to state that contractors on MoDOT projects are required to pay the appropriate state or federal prevailing hourly wage rate. |