Difference between revisions of "153.21 Traffic"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Updated links for TR32, TR42 and TR47 for Written Instructions.)
m (Fixed link for TR32)
Line 68: Line 68:
 
|TR31_<br/>Entrance_Shift<br/>_and_Widening_<br/>(Multiple_Owners)||Property owners desire to shift and widen existing access|| - || - ||Commission|| Chief Counsel's Office||Commission Secretary's Office|| no|| [http://epg.modot.org/index.php?title=Category:105_Control_of_Work#105.21_Agreement_for_Shifting_State_Highway_Entrance EPG 105.21 Agreement for Shifting State Highway Entrance] and [http://epg.modot.org/index.php?title=Category:941_Permits_and_Access_Requests#941.2.2_Evaluation_Guidelines_and_Considerations EPG Evaluation Guidelines and Considerations]
 
|TR31_<br/>Entrance_Shift<br/>_and_Widening_<br/>(Multiple_Owners)||Property owners desire to shift and widen existing access|| - || - ||Commission|| Chief Counsel's Office||Commission Secretary's Office|| no|| [http://epg.modot.org/index.php?title=Category:105_Control_of_Work#105.21_Agreement_for_Shifting_State_Highway_Entrance EPG 105.21 Agreement for Shifting State Highway Entrance] and [http://epg.modot.org/index.php?title=Category:941_Permits_and_Access_Requests#941.2.2_Evaluation_Guidelines_and_Considerations EPG Evaluation Guidelines and Considerations]
 
|-
 
|-
|TR32_<br/>Supplemental_Signing<br/>_Agreement<sup>'''5'''</sup> ||Extension of the contract duration for the TR-15 ||Districts ||Central Office Highway Safety and Traffic || State Highway Safety and Traffic Engineer|| - || - || no || [http://sp/sites/ts/Contracts1/Forms/AllItems.aspx?RootFolder=%2Fsites%2Fts%2FContracts1%2FSigning%2FProcesses&FolderCTID=0x01200005DEE6E0F43F1A45B27697605C229FA1&View=%7B20DF2984%2D686A%2D4896%2DB31A%2D444231D01063%7D Written Instruction for TR32  
+
|TR32_<br/>Supplemental_Signing<br/>_Agreement<sup>'''5'''</sup> ||Extension of the contract duration for the TR-15 ||Districts ||Central Office Highway Safety and Traffic || State Highway Safety and Traffic Engineer|| - || - || no || [http://sp/sites/ts/Contracts1/Forms/AllItems.aspx?RootFolder=%2Fsites%2Fts%2FContracts1%2FSigning%2FProcesses&FolderCTID=0x01200005DEE6E0F43F1A45B27697605C229FA1&View=%7B20DF2984%2D686A%2D4896%2DB31A%2D444231D01063%7D Written Instruction for TR32]
 
|-
 
|-
 
|TR34_<br/>Agreement_for_<br/>Street_Marking||Contract with third party to apply pavement markings to non-state roadways|| - || - || Commission|| Chief Counsel's Office|| Commission Secretary's Office|| no|| -
 
|TR34_<br/>Agreement_for_<br/>Street_Marking||Contract with third party to apply pavement markings to non-state roadways|| - || - || Commission|| Chief Counsel's Office|| Commission Secretary's Office|| no|| -

Revision as of 11:24, 7 October 2019

Available Traffic Boilerplate Agreements1 What triggers the use of this agreement? When is it used? Who are the drafters? Who needs to review the document prior to execution2? Who signs for MoDOT?3 Is acknowledge-
ment by a notary public required?
Link to Available Instructions4
Executing Signature Approval as to Form Attestation Signature
Performance_
Bond_Form
Used when third party is working on MoDOT right of way Bonding company none - - - yes -
TR01_
School_Crossing_
Signal_Agreement
(In_Municipalities)
School desires to install a school crossing signal Districts Central Office Highway Safety and Traffic - only if modified District Engineer - - yes EPG 902.11.2 Mid-Block School Crossing
TR02_
School_Crossing_
Agreement_(By
_Municipalities)
School desires to install a mid-block school crossing signal Districts Central Office Highway Safety and Traffic - only if modified District Engineer - - yes EPG 902.11.2 Mid-Block School Crossing
TR03_
School_Crossing_
at_Existing_
Intersection
(In_Municipalities)
School desires to install a school crossing signal at existing signal Districts Central Office Highway Safety and Traffic - only if modified District Engineer - - yes EPG 902.11.1 School Crossing Indications at Existing Signal
TR04_
School_Crossing_
at_Existing_
Intersection (Outside
_Municipalities)
School desires to install a school crossing at existing signal Districts Central Office Highway Safety and Traffic - only if modified District Engineer - - yes EPG 902.11.1 School Crossing Indications at Existing Signal and EPG 902.11.2 Mid-Block School Crossing
TR05_
School_Crossing_
Signal_(By_
School_District)
School desires to install a school signal with crossing Districts Central Office Highway Safety and Traffic - only if modified District Engineer - - yes EPG 902.11.2 Mid-Block School Crossing
TR06_
Fire_Station_
Signal_Agreement
(Outside_
Municipalities)
Fire station desires to install a signal Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.8.1 Application of Emergency-Vehicle Traffic Control Signals and Hybrid Beacons
TR07_
Fire_Station_
Signal_Agreement
(In_Municipalities)
Fire station desires to install a signal Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.8.1 Application of Emergency-Vehicle Traffic Control Signals and Hybrid Beacons
TR08_
Roadside_Flashers
_for_School_
Operation
School desires to install a school flasher Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 903.19.5.1 School Assembly Installation Contracts and EPG 903.19.14 School Speed Limit Flasher Assembly (S4-3P, R2-1, S4-4P) and END SCHOOL SPEED LIMIT Sign (S5-3)
TR09_
Application_For
_Signs_at_
Cattle_Crossing
Third party desires to sign a cattle crossing Districts Central Office Highway Safety and Traffic - only if modified District Engineer - - no EPG 903.6.41 Non-Vehicular Warning Signs (W11-2, W11-3, W11-4, W11-7, W11-32, W11-33, W16-9P)
TR10_
Contract_for_
Signs_at_School
_Crossing (Outside
_Municipalities)
School desires to install school crossing signs and a crosswalk Districts Central Office Highway Safety and Traffic - only if modified District Engineer - - no -
TR11_
Contract_for_
School_Crossing_
(In_Municipalities)
School desires to install school crossing signs and a crosswalk Districts Central Office Highway Safety and Traffic - only if modified District Engineer - - no EPG 903.19.5.1 School Assembly Installation Contracts
TR12_
Contract_for_
Signs_at_
Truck_Crossing
Third party desires to install truck crossing signs Districts Central Office Highway Safety and Traffic - only if modified District Engineer - - no EPG 903.6.40 Vehicular Traffic Warning Signs (W11-1, W11-1b, W11-5, W11-8, W11-10, W11-12P, W11-14)
TR13_
Joint_Use_
Driveway_Agreement
Two property owners will share a driveway Districts Central Office Highway Safety and Traffic - only if modified None - - no EPG 941.9.7.10 Guidelines for Review of Requests for Overweight Crossings of State Highways
TR14_
Entrance_Shiftin
g_Agreement
Property owner wants to shift existing access - - District Engineer Chief Counsel's Office Commission Secretary's Office yes EPG 105.21 Agreement for Shifting State Highway Entrance and EPG Evaluation Guidelines and Considerations
TR15_
Signing_Paid_
by_Applicant 5
Third party desires to install guide signs or custom city limit or accomplishement plaques. Districts Central Office Highway Safety and Traffic State Highway Safety and Traffic Engineer - - no Written Instruction for TR15
TR16_
Agreement_for_
Installation_of_
Traffic_Signal_
by_Others
Third party desires to install a traffic signal Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office no EPG 902.4.1.1 Conditions for installation by permit
TR17_
Traffic_Engineering
_Studies
Use of a consultant to perform traffic engineering services - - Commission Chief Counsel's Office Commission Secretary's Office no -
TR18_
Towing_Services
_Agreement
Use of a towing company to assist the Emergency Response program - - Commission Chief Counsel's Office Commission Secretary's Office no -
TR19_
Contract_
for_School_Signal
_(District)
School desires to install a traffic signal Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.11.3 School Signal at Entrance
TR20_
Contract_for_
School_Signal_
(In_Municipalities)
School desires to install a traffic signal Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.11.3 School Signal at Entrance
TR21_
Contract_for_
School_Signal
(Outside_
Municipalities)
School desires to install a traffic signal Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.11.3 School Signal at Entrance
TR23_
Annual_Traffic_
Safety_Conference
Contract with University of Missouri to coordinate the Annual Traffic and Safety Conference Central Office Highway Safety and Traffic - Commission Chief Counsel's Office Commission Secretary's Office no -
TR24_
Entrance_Shift_
and_Widening_Agreement
Property owner wants to shift and widen an existing access - - Commission Chief Counsel's Office Commission Secretary's Office no EPG 105.21 Agreement for Shifting State Highway Entrance and EPG Evaluation Guidelines and Considerations
TR25_
Entrance_Widening
_Agreement
Property owner want to widen an exisiting access - - Commission Chief Counsel's Office Commission Secretary's Office no EPG 105.21 Agreement for Shifting State Highway Entrance and EPG Evaluation Guidelines and Considerations
TR26_
Installation_of_
Roadside_Flashers_
for_Emergency_
Vehicle_Operation
Emergency service desires to install a road side flasher Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.12.7 Procedures For Advance Beacon Installations by Outside Parties
TR27_
Contract_for_
School_Signal_
with_School_
Crossing_Signal_
(District)
School desires to install a signal, pedestrian crossing and roadside flashers Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.11.3 School Signal at Entrance
TR28_
Contract_for_
School_Signal_
with_School_
Crossing_Signal_
(In_Municipalities)
School desires to install a signal and pedestrian signals Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.11.3 School Signal at Entrance
TR29_
Contract_for_
School_Signal_
with_School_
Crossing_Signal_
(Outside_
Municipalities)
School desires to install a signal and pedestrian signals Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.11.3 School Signal at Entrance
TR30_
Contract_for_
Emergency_Vehicle
_Operation_Signal
Emergency service desires to install an emergency signal Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.8.1 Application of Emergency-Vehicle Traffic Control Signals and Hybrid Beacons
TR31_
Entrance_Shift
_and_Widening_
(Multiple_Owners)
Property owners desire to shift and widen existing access - - Commission Chief Counsel's Office Commission Secretary's Office no EPG 105.21 Agreement for Shifting State Highway Entrance and EPG Evaluation Guidelines and Considerations
TR32_
Supplemental_Signing
_Agreement5
Extension of the contract duration for the TR-15 Districts Central Office Highway Safety and Traffic State Highway Safety and Traffic Engineer - - no Written Instruction for TR32
TR34_
Agreement_for_
Street_Marking
Contract with third party to apply pavement markings to non-state roadways - - Commission Chief Counsel's Office Commission Secretary's Office no -
TR35_
Agreement_for_
Painting_Traffic
_Signals
Third party desires to apply a paint coating to a traffic signal Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes -
TR36_
Automated_Speed
_Enforcement_Agreement
Third party desires to install automated enforcement on our right of way Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 950.2.1 Applications for Automated Speed Enforcement
TR37_
School_Bus_
Stop_Ahead_Flashers
School desires to install flashers on the School Bus Stop Ahead sign Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes -
TR38_
Highway_Naming
_Agreement
County/City desires to name a portion of a state roadway Districts Central Office Highway Safety and Traffic Commission Chief Counsel's Office Commission Secretary's Office no -
TR39_
Lighting_Agreement
County/City desires to install lighting on MoDOT right of way Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office no -
TR40_
Traffic_Signal
_Pre-Emption_Agreement
Third party desires to install pre-emption equipment on our signals Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office no -
TR41_
Cattle_Pass
_Agreement
Third party desires to create a cattle pass using Commission bridge/box Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office no -
TR42_
Signing_Installed
_and_Maintained_
by_Applicant 5
Third party desires to install community awareness/local reference signs Districts Central Office Highway Safety and Traffic State Highway Safety and Traffic Engineer - - no Written Instruction for TR42
TR43_
Automated_Traffic
_Signal_Enforcement
_Agreement
Third party desires to install automated enforcement on our right of way Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 950.1.6 Conditions for Intersections with Automated Red-Light Violation Enforcement Equipment Installed After January 2011 and EPG 950.1.7 Conditions for Intersections with Automated Red-Light Violation Enforcement Equipment Installed Prior to January 2011
TR44_
Levee_Attachment
_Agreement
Levee district desires to install a levee on Commission right of way - - Commission Chief Counsel's Office Commission Secretary's Office yes EPG 203.2.5 Levee Attachments
TR45_
KC_Scout_Data_
and_Video_Access
_Agreement
Company desires to have access to CCTV feed Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes -
TR46_
Gateway_Guide_
Data_and_Video
_Access_Agreement
Company desires to have access to CCTV feed Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes -
TR47_
Wayfinding_Signing
_Agreement 5
City desires to install wayfinding signs Districts Central Office Highway Safety and Traffic State Highway Safety and Traffic Engineer - - no Written Instruction for TR47
TR48_
Break_In_
Limited_Access
Third party desires to have an acess in limited access right of way Central Office Highway Safety and Traffic/Districts - Commission Chief Counsel's Office Commission Secretary's Office yes EPG Evaluation Guidelines and Considerations
TR49_
Impact_Assessment_
Agreement
Third party improvements will negatively affect a future Commission project Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes -
TR50_-_
Electronic_Signature_
Agreement (Utility_Permits)
Utility company wants access to generate automated permits Districts Central Office Highway Safety and Traffic Commission Chief Counsel's Office Commission Secretary's Office no -
TR51_
Break_in_Access
_License
Third party desires to have an acess in limited access right of way Central Office Highway Safety and Traffic/Districts - Commission Chief Counsel's Office Commission Secretary's Office yes EPG Evaluation Guidelines and Considerations
TR52_
Illuminated_Street
_Sign_Agreement
Third party desires to install illuminated street name signs Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office no -
TR53_
Roadside_Flashers_for
_City_County_Operation
School desires to install a school flasher Districts Central Office Highway Safety and Traffic - only if modified Commission Chief Counsel's Office Commission Secretary's Office yes EPG 902.12.7 Procedures For Advance Beacon Installations by Outside Parties
TR55_
ITS_Installation_
Maintenance_Agreement
Third party desires to install fiber optic cable which crosses various state owned right of way Districts Central Office Highway Safety and Traffic Commission Chief Counsel's Office Commission Secretary's Office yes
TR56_
Interactive_Radar
_Sign_Agreement
City/County desires to install interactive radar activated “YOUR SPEED” display signs Districts Central Office Highway Safety and Traffic Commission Chief Counsel's Office Commission Secretary's Office yes EPG 903.16 Signing Agreements
TR57_
License_Agreement
When a licensee requests to use a licensor’s trademark on licensee's website or other promotional material to reflect the licensor is a pledged partner of MoDOT’s Safety campaigns Districts/Central Office Highway Safety Central Office Highway Safety and Traffic Commission Chief Counsel's Office Commission Secretary's Office no
1 Use the eAgreements site to find and begin drafting the corresponding boilerplate agreement.
2 Any agreement that is changed from its original form must be reviewed by CCO. Please refer to EPG 153.1.4 Step 3, Chief Counsel’s Office (CCO) Review and throughout EPG 153 for guidance on when to contact CCO. When in doubt, do not hesitate to contact CCO for guidance.
3 Can also be found in the Execution of Documents Policy
4 See EPG 902.17 Execution of Contracts for Signal or Flasher Installation for additional guidance on executing signal or flasher agreements. See EPG 903.16 Signing Agreements for additional guidance of executing signing agreements.
5 If district modifies the agreement, the agreement is then signed by the Commission.