User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:50, 14 May 2014 diff hist +292 m 617.1 Temporary Traffic Barriers Per Design, clarification to provide consistency in payment for relocating barrier wall and impact attenuators
- 07:09, 14 May 2014 diff hist -4 m Category:756 Seismic Design Per Bridge, updated Seismic Design Process Flowchart link
- 14:34, 13 May 2014 diff hist +145 m LPA:136.13 LPA Policy Changes Fig. 136.8.20
- 14:32, 13 May 2014 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.8.20
- 14:32, 13 May 2014 diff hist 0 N File:136.8.20.docx
- 14:31, 13 May 2014 diff hist +2 m LPA:136.8 Local Public Agency Land Acquisition Per RW, Fig. 136.8.20 verbiage tweaked to include more uniform act check items
- 11:12, 13 May 2014 diff hist +89 m Category:756 Seismic Design Per Bridge, updated link to the Bridge Seismic Design Process Flowchart
- 09:49, 13 May 2014 diff hist +97 m LPA:136.13 LPA Policy Changes Fig. 136.3.18
- 09:48, 13 May 2014 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated Fig. 136.3.18
- 09:48, 13 May 2014 diff hist 0 N File:136.3.18 2014.xls current
- 09:47, 13 May 2014 diff hist +10 m LPA:136.3 Federal Aid Basics Per LPA, updated Fig. 136.3.18
- 09:16, 13 May 2014 diff hist -8 m Main Page EPG 903.3.8
- 09:11, 13 May 2014 diff hist +97 m 903.3 Ground-Mounted Sign Supports →903.3.8 Perforated Square Steel Tube Posts: Per Traffic, updated a PSST post link to provide improved guidance.
- 08:44, 13 May 2014 diff hist 0 N File:Main Page May 13, 2014.jpg current
- 08:44, 13 May 2014 diff hist -136 m Main Page EPG 105.23
- 07:41, 13 May 2014 diff hist +79 m Category:105 Control of Work →105.23 Quality Management: added link
- 07:36, 13 May 2014 diff hist +676 m Category:105 Control of Work →105.23 Quality Management: Per CM, new QM SiteManager guidance for only MoDOT staff
- 13:45, 12 May 2014 diff hist -1 m Main Page
- 10:36, 12 May 2014 diff hist +289 m LPA:136.13 LPA Policy Changes EPG 136.11.17.1
- 10:32, 12 May 2014 diff hist +58 m LPA:136.11 Local Public Agency Construction →136.11.17.1 Material Acceptance: inserted link
- 10:30, 12 May 2014 diff hist 0 m LPA:136.11 Local Public Agency Construction →136.11.17.1 Material Acceptance: Per LPA, minor correction
- 08:47, 12 May 2014 diff hist -2 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail (TL-4 [NCHRP 350]): minor clarification, per Bridge
- 10:20, 9 May 2014 diff hist 0 N File:Main Page May 9, 2014.jpg current
- 10:20, 9 May 2014 diff hist -650 m Main Page new photo
- 08:03, 9 May 2014 diff hist 0 N File:236.7 Form 7.8.1.docx
- 08:03, 9 May 2014 diff hist +277 m 236.7 Negotiation Per RW, clarification about negotiator's experience. Also, Form 7.8.1, Application for Employment as a Contract Negotiator, updated.
- 13:23, 7 May 2014 diff hist -68 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per Design, consultant invoices no longer must be electronically submitted by the PM/CA to Design Div.
- 13:09, 7 May 2014 diff hist 0 N File:Main Page May 7, 2014.jpg current
- 13:09, 7 May 2014 diff hist -96 m Main Page EPG 236.3.3
- 12:53, 7 May 2014 diff hist 0 N File:236.6.3.1 Standard Appraisal.docx
- 12:53, 7 May 2014 diff hist 0 N File:236.6.3.1B Certificate.docx
- 12:53, 7 May 2014 diff hist -337 m 236.6 Appraisal and Appraisal Review Per RW, upated Forms 236.6.3.1 and 236.6.3.1B
- 12:40, 7 May 2014 diff hist 0 N File:236.3.3.3B 2014.docx
- 12:40, 7 May 2014 diff hist -2,062 m 236.3 Administration Per RW, minor revisions removing Form 236.3.3.3B. (Current Form 236.3.3.3C was retitled as "B".) The new report from FMS is more accurate, efficient and eliminates need to complete the final cost est
- 10:48, 7 May 2014 diff hist +184 m LPA:136.13 LPA Policy Changes Form 136.8.18
- 10:46, 7 May 2014 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Per RW, updated Form 136.8.18, RW Plan Review Checklist
- 10:45, 7 May 2014 diff hist 0 N File:136.8.18.docx
- 10:45, 7 May 2014 diff hist +3 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Form 136.8.18, RW Plan Review Checklist
- 07:56, 7 May 2014 diff hist -46 m Main Page EPG 643.3.15
- 07:39, 7 May 2014 diff hist -28 m 643.3 Policy, Standards and Regulations →643.3.15 Bridge Attachment Policy and Procedures for Utilities: Per Bridge, clarification of utilities permitted on bridges
- 07:12, 7 May 2014 diff hist 0 N File:236.6.3.2 Value Finding Appraisal.docx
- 07:11, 7 May 2014 diff hist -57 m 236.6 Appraisal and Appraisal Review Per RW, updated Form 236.6.3.2, Value Finding Appraisal Format
- 13:53, 6 May 2014 diff hist 0 m Main Page
- 12:25, 6 May 2014 diff hist +22 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per ECR, minor clarification. The prime and sub mut submit payrolls within 7 days
- 10:50, 6 May 2014 diff hist +36 m 231.4 Shoulder Width photo
- 10:50, 6 May 2014 diff hist 0 N File:231.4.1.2.jpg current
- 13:24, 5 May 2014 diff hist +25 m 236.16 Outdoor Advertising updated divisional name
- 13:21, 5 May 2014 diff hist +8 m Category:941 Permits and Access Requests updated divisional name
- 13:17, 5 May 2014 diff hist +12 m 643.3 Policy, Standards and Regulations
- 13:16, 5 May 2014 diff hist +26 m 643.3 Policy, Standards and Regulations →643.3.10 Allocation of Cost: updated divisional names