User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:29, 25 June 2014 diff hist 0 N File:127.29 SWMP 2014.pdf
- 11:29, 25 June 2014 diff hist -26 m 127.29 Stormwater Per Environmental, updated Storm Water Management Plan
- 15:05, 24 June 2014 diff hist 0 m 751.1 Preliminary Design →Common Bridge Rails (for Rehabilitations)
- 15:05, 24 June 2014 diff hist 0 N File:751.1.3.4 thrie.jpg current
- 15:04, 24 June 2014 diff hist 0 m 751.1 Preliminary Design →Common Bridge Rails (for Rehabilitations): Per Bridge, updated photo
- 13:54, 24 June 2014 diff hist 0 m 236.5 Property Management Per CCO, updated RW4 contract link
- 10:35, 24 June 2014 diff hist +14 m Category:122 Aviation updated Aeronautical Chart link
- 10:22, 24 June 2014 diff hist 0 N File:Main Page June 24, 2014.jpg current
- 10:22, 24 June 2014 diff hist +441 m Main Page new photo
- 10:52, 23 June 2014 diff hist +68 m Main Page EPG 703.2.8
- 10:51, 23 June 2014 diff hist +226 m Category:703 Concrete Masonry Construction →703.2.8 Concrete Placement: Per Bridge and CM, guidance about pouring backwalls and associated construction joints conforming with the roadway crown was clarified
- 10:22, 23 June 2014 diff hist 0 N File:Main Page June 23, 2014.jpg current
- 10:21, 23 June 2014 diff hist -148 m Main Page EPG 703.2.9
- 09:58, 23 June 2014 diff hist +64 m Category:703 Concrete Masonry Construction →703.2.9 Curing: inserted link
- 09:49, 23 June 2014 diff hist +98 m Category:703 Concrete Masonry Construction →703.2.9 Curing
- 09:47, 23 June 2014 diff hist +7 m Category:703 Concrete Masonry Construction →703.2.9 Curing
- 09:46, 23 June 2014 diff hist +541 m Category:703 Concrete Masonry Construction →703.2.9 Curing: Per CM and Bridge, additional guidance about laying sprinkler hoses and sprayers before the concrete has proper set was provided
- 09:44, 23 June 2014 diff hist 0 N File:703.2.9.jpg current
- 09:17, 23 June 2014 diff hist +96 m LPA:136.13 LPA Policy Changes Fig. 136.8.8
- 09:16, 23 June 2014 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Updated Fig. 136.8.8
- 09:16, 23 June 2014 diff hist 0 N File:136.8.8 2014.doc current
- 09:15, 23 June 2014 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Fig. 136.8.8 RW Clearance Certification Statement Sample Letter
- 08:55, 23 June 2014 diff hist +51 m 750.1 Open Channels →750.1.4.1.1 Manning's n: minor clarification
- 08:47, 23 June 2014 diff hist +281 m 751.1 Preliminary Design →751.1.2.6 Box Culverts: Per Bridge, minor clarifications
- 08:43, 23 June 2014 diff hist 0 N File:750.7.13 Slopes for Skewed Culvert Sections.pdf current
- 08:43, 23 June 2014 diff hist +3 m 750.7 Non-Hydraulic Considerations →750.7.13 Culvert Lengths: Per Bridge, provided improved figure
- 08:41, 23 June 2014 diff hist +151 m 750.6 Erosion Control and Energy Dissipation →750.6.2.1 Shear Stress: Per Bridge, minor clarifications
- 08:28, 23 June 2014 diff hist +39 m 750.3 Bridges →750.3.2.4 Hydraulic Analysis of Bridges: added link
- 08:26, 23 June 2014 diff hist 0 N File:750.1.4.1.1 Manning.pdf current
- 08:25, 23 June 2014 diff hist -32 m 750.1 Open Channels →750.1.4.1.1 Manning's n: minor clarifications, per Bridge
- 08:00, 23 June 2014 diff hist +17 m 750.1 Open Channels →750.1.4.1.1 Manning's n
- 07:56, 23 June 2014 diff hist 0 N File:750.1.4.1.1 mean boundary shear.jpg current
- 07:26, 23 June 2014 diff hist +4 m 748.3 Freeboard →748.3.4 Levees: Per Bridge, minor clarification current
- 12:11, 20 June 2014 diff hist +1,728 m 236.15 Requests from Cities for Annexations updated CCO contract link
- 12:09, 20 June 2014 diff hist +1,450 m 236.14 Change in Route Status Report updated CCO contract links
- 12:07, 20 June 2014 diff hist +1,181 m 236.11 Mediation udpated CCO contract links
- 12:04, 20 June 2014 diff hist +1,448 m 236.8 Relocation Assistance Program CCO contract link updated
- 12:02, 20 June 2014 diff hist +14,113 m 236.7 Negotiation numerous CCO contract links updated
- 11:14, 20 June 2014 diff hist +1,820 m 236.5 Property Management updated CCO contract links
- 11:12, 20 June 2014 diff hist +2,189 m 236.4 Description Writing and Titles updated CCO contract links
- 11:07, 20 June 2014 diff hist +4,396 m 236.6 Appraisal and Appraisal Review updated numerous CCO contract links
- 10:59, 20 June 2014 diff hist +9,285 m 236.5 Property Management updated numerous contract links
- 10:41, 20 June 2014 diff hist +4,658 m 236.4 Description Writing and Titles updated numerous contract links
- 10:08, 20 June 2014 diff hist +121 m Main Page EPG 751.50
- 09:51, 20 June 2014 diff hist +1,170 m 751.50 Standard Detailing Notes →H. Superstructure Notes: Per Bridge, removed rustication requirements and revised outdated or incorrect guidance on permissible alternate barrier curb reinforcing shapes
- 12:20, 19 June 2014 diff hist -4,188 m LPA:136.3 Federal Aid Basics →136.3.18 Transportation Alternatives Program (TAP): EPG 136.3.18 deleted, since it was moved to EPG 136.3.8 in March 2014.
- 12:33, 18 June 2014 diff hist 0 m 171.6 Roadsides →171.6.4 Vegetation Management: updated link
- 12:29, 18 June 2014 diff hist +1,737 m 903.15 Signing Agreements updated links to CCO contracts
- 12:15, 18 June 2014 diff hist +159 m Category:903 Highway Signing updated CCO contract link
- 10:50, 18 June 2014 diff hist +344 m 171.1 Administration →ADM(C2) Maintenance Contracts: added link, per CM