User contributions
Jump to navigation
Jump to search
- 13:35, 23 February 2018 diff hist -680 m 236.6 Appraisal and Appraisal Review Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)
- 13:28, 23 February 2018 diff hist -60 m 236.7 Negotiation Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)
- 10:49, 23 February 2018 diff hist -463 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, removed archaic non-LED figures
- 08:59, 23 February 2018 diff hist -2,359 m 153.20 Right of Way Per RW, removed obsolete forms RW05, 06, 09, 07, 11, 19, 26, 30, 32 and 38.
- 14:12, 22 February 2018 diff hist +99 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM: Per EPS, brought article in accordance with new Std Plan 401.00 Sheet 3
- 14:11, 22 February 2018 diff hist -141 m Category:550 Portland Cement Concrete Pavement Design →550.1 Safety EdgeSM: Per EPS, brought article in accordance with new Std Plan 401.00 Sheet 3
- 13:01, 22 February 2018 diff hist -252 m Main Page EPG 146.2
- 12:57, 22 February 2018 diff hist +345 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per ECR, clarification regarding overruns and underruns as they relate to DBE participation.
- 13:09, 21 February 2018 diff hist -385 m 153.21 Traffic Per MT, TS and Commission Secr, replaced TR57 with MT27.
- 13:08, 21 February 2018 diff hist -609 m 153.9 Design Per MT, DE and Commission Secr, replaced DE64 and DE65 with MT01 and MT17, respectively.
- 13:07, 21 February 2018 diff hist +1,447 m 153.16 Maintenance Per MT, DE and Commission Secr, replaced DE64 and DE65 with MT01 and MT17, respectively. Per MT, TS and Commission Secr, replaced TR57 with MT27.
- 12:23, 21 February 2018 diff hist -1,447 m 153.16 Maintenance Per MT, DE and Commission Secr, moved former MT01 and MT17 to DE64 and DE65 respectively. Per MT, TS and Commission Secr, moved former MT27 to TR57.
- 12:21, 21 February 2018 diff hist +385 m 153.21 Traffic Per MT, TS and Commission Secr, moved former MT27 to TR57.
- 12:09, 21 February 2018 diff hist +609 m 153.9 Design Per MT, DE and Commission Secr, moved former MT01 and MT17 to DE64 and DE65 respectively.
- 11:15, 21 February 2018 diff hist 0 N File:101 DBE Identification Submittal Form.pdf current
- 11:15, 21 February 2018 diff hist +6 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR, added DBE Identification Submittal Form (replacing "DBE Program Submittal" form)
- 14:15, 20 February 2018 diff hist +1 m Main Page
- 13:06, 20 February 2018 diff hist -38 m 751.6 General Quantities Per BR, “Supplementary television camera inspection” was recently revised to “video camera inspection” in both the official bid listing and Sec 701
- 13:56, 16 February 2018 diff hist 0 m Category:806 Pollution, Erosion and Sediment Control →Silt Fence
- 13:49, 16 February 2018 diff hist -699 m Category:806 Pollution, Erosion and Sediment Control →806.2.1 Temporary Measures: Per DE. In 2009 Type I and Type II ditch checks were replaced w/ rock and alternate ditch checks; straw bails were removed from use as ditch checks.
- 12:21, 16 February 2018 diff hist -24 m Main Page EPG 134, EPG 153.8
- 11:11, 16 February 2018 diff hist +100 m 153.9 Design Per ECR and DE, DBE Concurrence must be requested prior to executing a consultant contracts
- 11:04, 16 February 2018 diff hist +1,830 m Category:134 Engineering Professional Services Per ECR and DE, DBE Concurrence must be requested prior to executing a consultant contracts
- 12:29, 15 February 2018 diff hist -9 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.50: Per TS, corrected sign no of WET PAINT (Arrow Pivots)
- 12:20, 15 February 2018 diff hist 0 N File:Figure 901.13.10.pdf current
- 12:20, 15 February 2018 diff hist -15 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways →901.13.10 Submittal: Per TS, updated Fig. 901.13.10 with LED info
- 12:17, 15 February 2018 diff hist 0 N File:901.13.4.pdf current
- 12:17, 15 February 2018 diff hist +223 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways →901.13.4 Lighting Style, Luminaire Type and Mounting Height
- 12:12, 15 February 2018 diff hist -55 m Category:101 Standard Forms Per TS, updated figures with LED info
- 12:11, 15 February 2018 diff hist 0 N File:Form D21 2018.pdf current
- 12:11, 15 February 2018 diff hist +4 m 901.6 Programming Per TS, updated D21 with LED info
- 11:50, 15 February 2018 diff hist -220 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, updated figures with LED info
- 11:48, 15 February 2018 diff hist 0 N File:901.11.7.pdf current
- 11:48, 15 February 2018 diff hist 0 N File:901.11.6.pdf current
- 11:48, 15 February 2018 diff hist -132 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, updated figures with LED info
- 11:44, 15 February 2018 diff hist -24 m 901.9 Layout Per TS, updated figures with LED info
- 11:41, 15 February 2018 diff hist 0 N File:901.7.5.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.4.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.3.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.2.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.1.pdf current
- 11:40, 15 February 2018 diff hist -581 m 901.7 Light Source and Intensity Per TS, updated figures with LED info
- 11:31, 15 February 2018 diff hist 0 N File:901.2.1.pdf current
- 11:30, 15 February 2018 diff hist -94 m 901.2 Lighting to be Provided, Operated, and Maintained at the Expense of the Local Political Subdivision Per TS, updated Fig. 901.2.1 with LED info
- 11:22, 15 February 2018 diff hist 0 N File:101 No Rise Certificate 2018.pdf
- 11:22, 15 February 2018 diff hist 0 m Category:101 Standard Forms →Bridge: Per BR, minor update for No-Rise Certificate
- 09:30, 15 February 2018 diff hist +934 m 153.11 Financial Services Per FS, added F31 and F32 info
- 14:31, 14 February 2018 diff hist +88 m 751.50 Standard Detailing Notes →G7. Steel HP Pile
- 14:30, 14 February 2018 diff hist +88 m 751.1 Preliminary Design →751.1.2.21 Substructure Type
- 14:20, 14 February 2018 diff hist -12 m 751.1 Preliminary Design →751.1.2.23 Types of Piling