User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 16:13, 19 December 2019 diff hist +21 m 751.35 Concrete Pile Cap Integral End Bents
- 15:55, 19 December 2019 diff hist -4 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.3 Wing Reinforcement: Per BR, slightly modified H bar development lengths in end bent wings for rounding and for large skews
- 13:12, 19 December 2019 diff hist -270 m Recent Policy Changes in the EPG EPG 409.2.8
- 12:20, 19 December 2019 diff hist +474 m Category:409 Seal Coat →409.2 Construction Inspection for Sec 409: Per CM, new sub-article to explain method of measurement.
- 10:28, 19 December 2019 diff hist -148 m Recent Policy Changes in the EPG EPG 236.3.12
- 10:10, 19 December 2019 diff hist +7,534 m 236.3 Administration Per RW, new guidance to document the established practice of initiating consultant right of way acquisition and relocations services
- 10:29, 18 December 2019 diff hist -166 m 236.7 Negotiation Per RW, removed link to Form 7-7.4 (Real Estate Reporting for Form 1099-S)
- 08:41, 18 December 2019 diff hist -103 m Recent Policy Changes in the EPG EPG 103
- 08:34, 18 December 2019 diff hist +4,105 m 103.1 Bid Opening and Award Process →103.1.2 Bid Opening Location: Per CM, added new Emergency Work Procurement Process guidance to reflect established practice
- 11:52, 17 December 2019 diff hist -1 m Category:1001 General Requirements for Material Per CM, AASHTO has decided that all AASHTO “T” type methods will be tests, and the AASHTO “R” type methods will be for things like sampling.
- 10:53, 17 December 2019 diff hist +212 m Category:501 Concrete →501.1.8.1 Calibration: Per CM, updated and deleted archaic terms and items. A few additional edits for clarification.
- 09:10, 17 December 2019 diff hist -257 m Category:501 Concrete →501.1.4 Consistency (Sec 501.5): Per CM, updated and deleted archaic terms and items. A few additional edits for clarification.
- 14:48, 16 December 2019 diff hist +249 m LPA:136.13 LPA Policy Changes EPG 136.4.1.6
- 14:46, 16 December 2019 diff hist +36 m Recent Policy Changes in the EPG EPG 136.4.1.6
- 14:41, 16 December 2019 diff hist +443 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.6 Conflict of Interest: Per LPA, added confilict of interest information pertaining to when a consultant acts as a city engineer.
- 09:16, 16 December 2019 diff hist -96 m Category:145 Transportation Management Systems (TMS) Per TP, updated contact info link
- 15:53, 13 December 2019 diff hist -96 m Recent Policy Changes in the EPG EPG 237.14
- 15:51, 13 December 2019 diff hist +330 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, guidance was updated to reflect the use of the latest design software.
- 12:06, 13 December 2019 diff hist +1 m Recent Policy Changes in the EPG
- 12:06, 13 December 2019 diff hist +173 m Recent Policy Changes in the EPG Form 806.8.2
- 11:58, 13 December 2019 diff hist 0 m Category:101 Standard Forms Per Env'l, updated form by adding a new page for REs/Inspectors to identify the BMPs that will be used on a project
- 11:57, 13 December 2019 diff hist 0 N File:Form 806.8.2 dec 2019.pdf current
- 11:57, 13 December 2019 diff hist 0 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Env'l, updated form by adding a new page for REs/Inspectors to identify the BMPs that will be used on a project
- 14:53, 12 December 2019 diff hist +157 m 236.7 Negotiation Per RW, added new MoDOT Public Participation Survey (Title VI Survey) link for externals' access
- 11:18, 12 December 2019 diff hist -71 m Recent Policy Changes in the EPG EPG 237.14.1
- 11:07, 12 December 2019 diff hist +131 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.1 MoDOT and Consultant Electronic Design Data Requirements: Per CADD, clarified EDD requirements
- 10:04, 12 December 2019 diff hist -12 m Category:134 Engineering Professional Services →134.5.3 Consultant Contract Close-Out
- 10:03, 12 December 2019 diff hist +2 m Category:134 Engineering Professional Services →134.5.1 Invoicing
- 10:01, 12 December 2019 diff hist 0 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution
- 09:59, 12 December 2019 diff hist -8 Category:134 Engineering Professional Services →134.3.4 Basis of Payment
- 09:56, 12 December 2019 diff hist +39 m Category:134 Engineering Professional Services →134.3.3 Man Hours Review
- 09:45, 12 December 2019 diff hist -4 m Category:134 Engineering Professional Services →134.3.1.2 Payment Bond
- 09:42, 12 December 2019 diff hist -41 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts
- 09:39, 12 December 2019 diff hist -95 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts
- 09:36, 12 December 2019 diff hist -41 Category:134 Engineering Professional Services
- 09:32, 12 December 2019 diff hist -32 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts
- 09:30, 12 December 2019 diff hist -30 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 09:28, 12 December 2019 diff hist +10 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 09:28, 12 December 2019 diff hist -15 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 09:26, 12 December 2019 diff hist -17 m Category:134 Engineering Professional Services →134.2.2.4 Solicitation and Selection Step 4 – Consultant Response to the Solicitation/RFQ
- 09:23, 12 December 2019 diff hist +10 m Category:134 Engineering Professional Services →134.2.2.2 Solicitation and Selection Step 2 – PM/CA to Submit Solicitation & Request Letter to PSC
- 09:21, 12 December 2019 diff hist -7 m Category:134 Engineering Professional Services →134.1.5 Suspension/Debarment
- 09:16, 12 December 2019 diff hist +3 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 09:14, 12 December 2019 diff hist -6 m Category:134 Engineering Professional Services →134.1.2 State Law
- 08:47, 12 December 2019 diff hist 0 m 460.3 Plant Inspection →460.3.13 Asphalt Binder Sampling and Test Results: minor editorial correction
- 13:42, 10 December 2019 diff hist +7 m Category:100 GENERAL
- 13:40, 10 December 2019 diff hist +21 m Category:101 Standard Forms
- 13:18, 10 December 2019 diff hist -245 m 750.6 Erosion Control and Energy Dissipation updated several std plan links
- 12:12, 10 December 2019 diff hist -1 m Category:145 Transportation Management Systems (TMS)
- 12:10, 10 December 2019 diff hist 0 N File:145 2019.jpg current