User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:38, 9 April 2020 diff hist +429 m Category:239 Construction Inspection Guidelines for Final Plans Per EPS, added Bluebeam Revu User Resources
- 10:22, 9 April 2020 diff hist +224 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, further revision of H1
- 10:40, 8 April 2020 diff hist 0 m 751.50 Standard Detailing Notes →A5. Miscellaneous
- 10:32, 8 April 2020 diff hist +113 m 751.50 Standard Detailing Notes →A5. Miscellaneous: Per BR, further revision
- 10:10, 8 April 2020 diff hist -137 m 751.50 Standard Detailing Notes →A5. Miscellaneous: Per BR, further revision of A5.1
- 13:44, 7 April 2020 diff hist +177 m Recent Policy Changes in the EPG EPG 751.5 and EPG 751.50
- 13:41, 7 April 2020 diff hist +24 m 751.50 Standard Detailing Notes →H. Superstructure Notes
- 13:07, 7 April 2020 diff hist +678 m 751.50 Standard Detailing Notes Per BR, moved Fracture Critical Member (FCM) notes from EPG 751.5.9.3.3 to EPG 751.50. Revised notes to refer to the specifications.
- 12:37, 7 April 2020 diff hist -427 m 751.5 Structural Detailing Guidelines →751.5.9.3.3 Fracture Control Plan (FCP) *: Per BR, moved Fracture Critical Member (FCM) notes from EPG 751.5.9.3.3 to EPG 751.50. Revised notes to refer to the specifications.
- 07:28, 7 April 2020 diff hist -71 m Recent Policy Changes in the EPG EPG 127.29.8
- 07:25, 7 April 2020 diff hist 0 N File:127.29.9 FRCP.pdf current
- 07:24, 7 April 2020 diff hist -37 m Category:101 Standard Forms →Maintenance: Per MT, replaced Deer Death Form with FRCP (Facility Runoff Control Plans) form
- 07:22, 7 April 2020 diff hist +1,004 m 127.29 Stormwater →127.29.8 MCM 6: Pollution Prevention/Good Housekeeping: Per Env'l, expanded facility runoff control plan guidance
- 08:20, 6 April 2020 diff hist -292 m Recent Policy Changes in the EPG EPG 236.16
- 08:18, 6 April 2020 diff hist +3,201 m 236.16 Outdoor Advertising Per RW, updated and clarified article. Updated vegetation policies to match traffic policies for work on right of way
- 15:02, 2 April 2020 diff hist +88 m Recent Policy Changes in the EPG EPG 113
- 14:38, 2 April 2020 diff hist -7,697 m Category:113 Construction Inspection Guidance for Contractor's Claims Per CM, revised the Claims Process guidance.
- 12:42, 2 April 2020 diff hist +9 m 127.25 Maintenance Environmental Policies →127.25.6.2 Tier II Reporting: Per Env'l, updated link
- 10:40, 1 April 2020 diff hist +64 m Recent Policy Changes in the EPG EPG 903.9.9
- 10:31, 1 April 2020 diff hist +169 m 903.9 General Information Signs →903.9.9 City/County Limit Signs (I4, I5, I6 Series): Per TS, clarified guidance for where inadaquate space exists to install a city limits sign at the standard location.
- 14:09, 31 March 2020 diff hist +38 m Recent Policy Changes in the EPG EPG 153.8
- 14:02, 31 March 2020 diff hist +814 m 153.9 Design Per Env'l, new guidance for DE62 Stream Wetland Credit Purchase Agreement and DE66 TCF Bat Habitat Credit Purchase Agreement
- 13:54, 26 March 2020 diff hist +496 m 153.7 Construction and Materials Per CM, added new Task Order contract, CMB 7 Task Order Contract with MCTI
- 14:36, 25 March 2020 diff hist +7 m Recent Policy Changes in the EPG
- 14:34, 25 March 2020 diff hist -428 m Recent Policy Changes in the EPG EPG 402 and 409
- 14:27, 25 March 2020 diff hist 0 N File:402 FY2021 Contract Leveling Coat Guidelines b.docx current
- 14:27, 25 March 2020 diff hist 0 m Category:402 Bituminous Surface Leveling
- 14:23, 25 March 2020 diff hist 0 N File:402 FY2021 Contract Leveling Coat Guidelines a.docx current
- 14:23, 25 March 2020 diff hist +2 m Category:402 Bituminous Surface Leveling
- 13:59, 25 March 2020 diff hist -101 m Recent Policy Changes in the EPG EPG 147.4
- 13:17, 25 March 2020 diff hist 0 N File:147.4.2.docx current
- 13:13, 25 March 2020 diff hist 0 N File:409 FY 2021 Seal Coat Plans.pdf current
- 13:12, 25 March 2020 diff hist 0 N File:409 FY2021 Contract Seal Coat Guidelines a.docx current
- 13:12, 25 March 2020 diff hist 0 m Category:409 Seal Coat Per EPS, updated Seal Coat guidance for FY 2021
- 12:35, 25 March 2020 diff hist 0 N File:402 CLC 2021 Plans.pdf current
- 12:34, 25 March 2020 diff hist 0 N File:402 FY2021 Contract Leveling Coat Guidelines.docx current
- 12:34, 25 March 2020 diff hist 0 m Category:402 Bituminous Surface Leveling Per EPS, updated CLC guidance for FY 2021
- 11:21, 25 March 2020 diff hist +6,296 N 147.4 Fixed Price Variable Scope (FPVS) Contracting Per DE, new article provides guidance for new contracting method, Fixed Price Variable Scope (FPVS) Contracting
- 13:29, 24 March 2020 diff hist +6 m Recent Policy Changes in the EPG
- 13:29, 24 March 2020 diff hist -84 m Recent Policy Changes in the EPG EPG 153.19
- 12:59, 24 March 2020 diff hist +1,259 m 153.20 Right of Way Per RW, added info for 6 agreements
- 10:33, 24 March 2020 diff hist -1 m Main Page
- 08:34, 24 March 2020 diff hist -2 m 606.2 Guard Cable →606.2.1 Guard Cable Types: updated links
- 15:14, 20 March 2020 diff hist +51 m 153.11 Financial Services Per FS, updated agreement requirements
- 11:25, 20 March 2020 diff hist +92 m Recent Policy Changes in the EPG EPG 642
- 11:18, 20 March 2020 diff hist +4,228 N 642.14 ADA Transition Plan Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.
- 11:13, 20 March 2020 diff hist +1,400 N 642.13 ADA Self-Evaluation Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12. current
- 11:01, 20 March 2020 diff hist +1,393 N 642.7 Maintenance Responsibility Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12. current
- 11:00, 20 March 2020 diff hist -42 m 642.6 Local Projects and ADA Considerations →642.6.2 Agreements current
- 10:59, 20 March 2020 diff hist +2,619 N 642.6 Local Projects and ADA Considerations Per DE, please closely read the article since most of the article has been re-written. EPG 642.1 through EPG 642.5 have been slightly revised and renumbered as EPG 642.8 through EPG 642.12.