User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:11, 25 June 2020 diff hist +429 m 616.23 Traffic Control for Field Operations Per TS, numerous minor clarifications
- 14:58, 24 June 2020 diff hist -269 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, numerous minor clarifications
- 08:44, 24 June 2020 diff hist -228 m Recent Policy Changes in the EPG EPG 134.5.1
- 08:41, 24 June 2020 diff hist +139 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per BR, additional contact guidance
- 12:13, 23 June 2020 diff hist +1 m 127.25 Maintenance Environmental Policies Per Env'l, updated link
- 11:19, 23 June 2020 diff hist +15 m Category:101 Standard Forms →Construction and Materials: updated link
- 11:18, 23 June 2020 diff hist +15 m Category:703 Concrete Masonry Construction →703.2.12 Checklist: updated link
- 11:14, 23 June 2020 diff hist -477 m Recent Policy Changes in the EPG EPG 153.18
- 11:00, 23 June 2020 diff hist +503 m 153.19 Multimodal Per Multimodal, new MO-21 agreement, Coronavirus Aid Relief and Economic Security Act Agreement
- 10:05, 23 June 2020 diff hist +288 m LPA:136.13 LPA Policy Changes EPG 136.4.2.6
- 09:59, 23 June 2020 diff hist +236 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.6 Step 5 - Selection of Consultant: Per LPA, added guidance about on an LPA disqualifying a consultant.
- 09:25, 23 June 2020 diff hist +22 m Recent Policy Changes in the EPG EPG 703.2.12,EPG 101
- 09:11, 23 June 2020 diff hist 0 N File:703.2.12 PODI Bridge Deck Pour Checklist.pdf current
- 09:10, 23 June 2020 diff hist +90 m Category:101 Standard Forms →Construction and Materials: Per CM, new PODI Bridge Deck Pour Checklist
- 09:08, 23 June 2020 diff hist -4,175 m Category:703 Concrete Masonry Construction →703.2.12 Checklist: Per CM, the new, FHWA-based "PODI Bridfe Deck Pour Checklist" form replaced the former textual guidance.
- 13:41, 19 June 2020 diff hist +1 m LPA:136.13 LPA Policy Changes
- 13:40, 19 June 2020 diff hist +199 m LPA:136.13 LPA Policy Changes EPG 136.6.3
- 13:37, 19 June 2020 diff hist 0 N File:136.6.3 programmatic agreement.pdf current
- 13:36, 19 June 2020 diff hist +56 m LPA:136.6 Environmental and Cultural Requirements →136.6.3 Categorical Exclusion (CE): Per Env'l, updated guidance with FHWA agreement requirements
- 10:13, 19 June 2020 diff hist -60 m Recent Policy Changes in the EPG EPG 105.9.14
- 09:20, 19 June 2020 diff hist -1,038 m Category:105 Control of Work →105.9.14 Project Diaries: Per CM, updated guidance to current AASHTOWARE procedures. EPG had provided project diary guidance for the outdated SiteManger procedures.
- 08:11, 19 June 2020 diff hist 0 N File:139 FHWA Design Build Program Agreement 2020.pdf current
- 08:10, 19 June 2020 diff hist +82 m Category:139 Design - Build Per DE, provided latest version of FHWA Design Build Program Agreement and updated links to Mo Design-Build Statue 227.107
- 13:36, 18 June 2020 diff hist +276 m Recent Policy Changes in the EPG EPG 237.9
- 12:41, 18 June 2020 diff hist +9 m 237.9 Submission of Plans and Supporting Documents →237.9.3.6 Finalizing the PS&E for Advertisement
- 12:35, 18 June 2020 diff hist +15 m 237.9 Submission of Plans and Supporting Documents →237.9.3.6.1 Creating Bidding Documents
- 12:34, 18 June 2020 diff hist -844 m 237.9 Submission of Plans and Supporting Documents →237.9.3.7 Posting Projects for Advertisement
- 12:34, 18 June 2020 diff hist +1,199 m 237.9 Submission of Plans and Supporting Documents →237.9.3.6 Finalizing the PS&E for Advertisement: Per DE, updated guidance since proposals are not advertised anymore. The proposal is now split into a Bid Book, Roadway JSPs, and Bridge JSPs and each is advertised.
- 07:34, 18 June 2020 diff hist +16 m Category:130 Value Engineering Per CM, updated C-104 links
- 07:32, 18 June 2020 diff hist +125 m 104.13 Construction Inspection Guidance for Sec 104 Per CM, updated C-104 links
- 15:12, 17 June 2020 diff hist +184 m Recent Policy Changes in the EPG EPG 146.3.1
- 15:00, 17 June 2020 diff hist +321 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.1 DBE Subcontract – Performing Work Onsite: Per ECR, updates/clarification. When a DBE is a prime contractor, a CUF should be performed on the DBE firm as well as any other DBE firms being utilized. The CUF review should be conducted on the prime DBE every 60 days until the project is completed.
- 13:43, 17 June 2020 diff hist +1 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1.1 Step 1, Determine Need for Cultural Resource Investigations
- 13:37, 17 June 2020 diff hist -9 m LPA:136.13 LPA Policy Changes
- 13:31, 17 June 2020 diff hist +589 m LPA:136.13 LPA Policy Changes EPG 136.6.4.1.1
- 13:29, 17 June 2020 diff hist -11,176 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1.1 Step 1, Determine Need for Cultural Resource Investigations: Per Env'l, the LPA is to now submit a Request for Environmental Review to MoDOT.
- 12:26, 16 June 2020 diff hist +1 m 751.50 Standard Detailing Notes →K1. General: minor correction
- 08:07, 12 June 2020 diff hist -1 m 751.50 Standard Detailing Notes →B3a. Bridges: Per BR, minor correction
- 09:19, 11 June 2020 diff hist -138 m Recent Policy Changes in the EPG New QRG in EPG 101
- 09:18, 11 June 2020 diff hist +88 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG, I.A.S. Lab Audit]
- 14:04, 10 June 2020 diff hist 0 m 751.10 General Superstructure →751.10.1.2 Limit States and Load Factors
- 13:39, 10 June 2020 diff hist +172 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.3 Wing Reinforcement: Per BR, updated link and info related to recent changes in EPG 751.12
- 13:37, 10 June 2020 diff hist +217 m 751.33 Concrete Semi Deep Abutments →751.33.4.2 Wing Elevation: Per BR, updated link and info related to recent changes in EPG 751.12
- 13:11, 10 June 2020 diff hist -71 m 751.10 General Superstructure →751.10.1.6 Slab Overhang Section Design: Per BR, updated link and info related to updates in EPG 751.12
- 13:03, 10 June 2020 diff hist +5 m 751.10 General Superstructure →751.10.1.3 Loads
- 13:02, 10 June 2020 diff hist -31 m 751.10 General Superstructure →751.10.1.3 Loads: updated link
- 07:38, 10 June 2020 diff hist -19,533 m Category:100 GENERAL Per CM, EPG 100.1 and EPG 100.2 presented archaic info as well as information that is presented in other articles. They were deleted.
- 13:56, 9 June 2020 diff hist +6 m 751.50 Standard Detailing Notes →H11. Miscellaneous: updated link
- 13:41, 9 June 2020 diff hist +114 m Recent Policy Changes in the EPG EPG 751.12
- 11:06, 9 June 2020 diff hist 0 N File:751.12.3.3.jpg current