User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:57, 15 July 2020 diff hist +196 m Category:401 Bituminous Base and Pavement corrected link
- 13:55, 15 July 2020 diff hist +203 m 104.7 Scoping Estimates →Maintenance of Traffic Operations During Construction (Sec 104.7.3): corrected link
- 13:53, 15 July 2020 diff hist -167 m Recent Policy Changes in the EPG EPG 617.1
- 13:49, 15 July 2020 diff hist +1,154 m 617.1 Temporary Traffic Barriers Per CM, DE and TS, added guidance on how to properly use Relocating Temporary Traffic Barrier pay item.
- 13:20, 15 July 2020 diff hist -190 m Category:401 Bituminous Base and Pavement link intentionally, temporarily broken
- 13:19, 15 July 2020 diff hist -190 m Category:403 Asphaltic Concrete Pavement link intentionally, temporarily broken
- 13:18, 15 July 2020 diff hist -142 m 104.7 Scoping Estimates →Maintenance of Traffic Operations During Construction (Sec 104.7.3)
- 13:18, 15 July 2020 diff hist -55 m 104.7 Scoping Estimates →Maintenance of Traffic Operations During Construction (Sec 104.7.3): link intentionally, temporarily broken
- 12:24, 15 July 2020 diff hist -11 m Recent Policy Changes in the EPG EPG 104.7
- 12:22, 15 July 2020 diff hist +25 m Category:403 Asphaltic Concrete Pavement
- 12:21, 15 July 2020 diff hist +25 m Category:401 Bituminous Base and Pavement
- 12:21, 15 July 2020 diff hist +25 m 104.7 Scoping Estimates →Maintenance of Traffic Operations During Construction (Sec 104.7.3)
- 11:29, 15 July 2020 diff hist +163 m Category:403 Asphaltic Concrete Pavement Per CM, added link to "Guidance for Administering and Planning Pavement Maintenance Responsibilities during Construction"
- 11:26, 15 July 2020 diff hist +165 m Category:401 Bituminous Base and Pavement Per CM, added link for "Guidance for Administering and Planning Pavement Maintenance Responsibilities during Construction"
- 11:16, 15 July 2020 diff hist 0 N File:104.7 Maintenance.docx current
- 11:16, 15 July 2020 diff hist +407 m 104.7 Scoping Estimates Per CM, new guidance about Maintenance of Traffic Operations During Construction. There is no cost impact, just additional guidance and best practices.
- 13:25, 14 July 2020 diff hist +95 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 13:23, 14 July 2020 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, minor updates to Fig. 136.9.3, Federal Project Bid Proposal Boilerplate
- 13:23, 14 July 2020 diff hist 0 N File:Fig. 136.9.3 July 2020.docx
- 13:23, 14 July 2020 diff hist +35 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, minor updates to Fig. 136.9.3, Federal Project Bid Proposal Boilerplate
- 13:02, 14 July 2020 diff hist -327 m Recent Policy Changes in the EPG EPG 106.20
- 12:55, 14 July 2020 diff hist -2 m 106.20 Reporting →106.20.6 Material Transfer Reports
- 12:53, 14 July 2020 diff hist -1 m 106.20 Reporting →106.20.6 Material Transfer Reports
- 12:51, 14 July 2020 diff hist +984 m 106.20 Reporting →106.20.6 Transfer Reports: Per CM, guidance updated to reflect the change to AASHTOWare Project (AWP) from Sitemanager and further clarify the Material Transfer process.
- 13:56, 10 July 2020 diff hist -332 m Recent Policy Changes in the EPG
- 13:55, 10 July 2020 diff hist +380 m Recent Policy Changes in the EPG EPG 101
- 13:11, 10 July 2020 diff hist +175 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG, AWP MA Sample Record Changing Material Code Source or Sample Type
- 10:38, 10 July 2020 diff hist 0 m Recent Policy Changes in the EPG
- 10:32, 10 July 2020 diff hist -277 m Recent Policy Changes in the EPG EPG 902.19
- 10:27, 10 July 2020 diff hist +1,224 m 902.19 Construction Inspection Guidelines for Sec 902 Per CM and TS, new guidance to provide more detail on the intent of Sec 902.2 to help ensure consistent administration of contract signal work
- 08:24, 10 July 2020 diff hist +1 m Category:135 The Section 106 Process current
- 08:23, 10 July 2020 diff hist -29,157 m Category:135 The Section 106 Process EPG 135 deleted Tag: Replaced
- 08:20, 10 July 2020 diff hist +13 m LPA:136.6 Environmental and Cultural Requirements updated link
- 08:19, 10 July 2020 diff hist +13 m LPA:136.6 Environmental and Cultural Requirements updated link
- 08:18, 10 July 2020 diff hist -66 m Borrow and Excess Material Areas Updated link current
- 08:16, 10 July 2020 diff hist +13 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction updated link
- 08:15, 10 July 2020 diff hist +13 m LPA:136.8 Local Public Agency Land Acquisition updated link
- 08:14, 10 July 2020 diff hist +13 Category:129 Public Involvement updated link
- 08:13, 10 July 2020 diff hist +13 m 127.23 Negotiated Commitments and Mitigation in the National Environmental Policy Act (NEPA) Process updated link
- 08:13, 10 July 2020 diff hist +13 m 127.22 Off-Site Borrow, Spoil, and Staging Areas updated link current
- 08:12, 10 July 2020 diff hist +13 m 127.16 Wetland and Stream Mitigation updated link
- 08:11, 10 July 2020 diff hist +12 m 127.10 Section 4(f) Public Lands updated link
- 08:10, 10 July 2020 diff hist -218 m 127.2 Historic Preservation and Cultural Resources removed links
- 08:08, 10 July 2020 diff hist +13 m Category:107 Legal Relations and Responsibility to the Public updated link
- 07:56, 10 July 2020 diff hist -28 m Category:Shoulder Maintenance updated link current
- 07:55, 10 July 2020 diff hist -56 m 320.1 Preliminary Geotechnical Report (PGR) updated links
- 07:53, 10 July 2020 diff hist -28 m Category:239 Construction Inspection Guidelines for Final Plans updated link
- 07:53, 10 July 2020 diff hist -28 m 238.4 Construction Surveying updated link
- 07:52, 10 July 2020 diff hist -28 m Category:235 Preliminary Plans updated link
- 07:51, 10 July 2020 diff hist +53 m LPA:136.8 Local Public Agency Land Acquisition →136.8.1.3 Local Public Agency’s Responsibility