User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:47, 28 July 2021 diff hist +117 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, clarified that in the rare case where intermediate bents are made integral (by extending the beam cap stirrups into the diaphragm), plain neoprene bearing pads may be considered at the intermediate bent.
- 13:42, 27 July 2021 diff hist 0 m 236.6 Appraisal and Appraisal Review Per RW, updated broken links to forms
- 12:42, 27 July 2021 diff hist -39 m 626.2 Centerline Rumble Strips Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. Also updated typical section sheet to reflect new Std. Plan 626.00.
- 12:39, 27 July 2021 diff hist +25 m Category:626 Rumble Strips Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. current
- 12:36, 27 July 2021 diff hist 0 N File:232.2.3.2.pdf current
- 12:36, 27 July 2021 diff hist -84 m 232.2 Passing Lanes Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. Also updated typical section sheet to reflect new Std. Plan 626.00.
- 12:18, 27 July 2021 diff hist 0 N File:903.16.24 2021.jpg current
- 12:17, 27 July 2021 diff hist 0 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 12:03, 27 July 2021 diff hist 0 N File:903.16.24 2021.pdf current
- 12:02, 27 July 2021 diff hist +5 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 12:01, 27 July 2021 diff hist 0 N File:903.16.24.pdf current
- 12:01, 27 July 2021 diff hist 0 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 12:00, 27 July 2021 diff hist -1 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes: Per TS, updated figure to align with new Std. Plan 626.00
- 11:17, 27 July 2021 diff hist 0 N File:147.4 Programmatic Work Plan for FPVC.docx current
- 11:16, 27 July 2021 diff hist +378 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per EPS, added "Programmatic Work Plan for Utilizing FPVC..."
- 07:32, 27 July 2021 diff hist -38 m Recent Policy Changes in the EPG EPG 606
- 07:28, 27 July 2021 diff hist +277 m Category:606 Guardrail and Guard Cable Per EPS, provided a contact number for reporting damaged guardrail or guard cable
- 09:38, 26 July 2021 diff hist +67 m Category:948 Incident Response Plan and Emergency Response Management
- 14:06, 23 July 2021 diff hist -268 m Recent Policy Changes in the EPG EPG 402, EPG 409, EPG 147.4
- 14:05, 23 July 2021 diff hist 0 N File:147.4.2 FPVS JSP Example.docx current
- 13:55, 23 July 2021 diff hist +5,955 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per DE, Fixed price variable scope (FPVS) guidance was temporarily removed from the EPG. FHWA has now approved the use of FPVS at a programmatic level
- 13:11, 23 July 2021 diff hist 0 N File:409 FY2022 Contract Seal Coat Job Book Guidelines.docx current
- 13:09, 23 July 2021 diff hist 0 N File:409 FY2022 Contract Seal Coat Guidelines.docx current
- 13:08, 23 July 2021 diff hist +556 m Category:409 Seal Coat Per DE, the Seal Coat and JSP package were updated. New Seal Coat Book Job Guidelines and Seal Coat Book Job JSP Package were added.
- 12:28, 23 July 2021 diff hist 0 N File:402 FY2022 Contract Leveling Course Book Job Guidelines.docx current
- 12:28, 23 July 2021 diff hist 0 N File:402 FY2022 Contract Leveling Course Guidelines.docx current
- 12:28, 23 July 2021 diff hist +509 m Category:402 Bituminous Surface Leveling Per DE, the CLC and JSP package were updated. New CLC Book Job Guidelines and CLC Book Job JSP Package were added.
- 12:26, 21 July 2021 diff hist -1 m Recent Policy Changes in the EPG
- 12:26, 21 July 2021 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory System (RSAS)
- 12:21, 21 July 2021 diff hist -35 m Recent Policy Changes in the EPG EPG 616.6.89
- 12:14, 21 July 2021 diff hist +3 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.88 Screens (MUTCD 6F.88)
- 12:13, 21 July 2021 diff hist +267 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per EPS, linked new NJSP for a radar speed advisory system to renamed "Radar Speed Advisory System" (formerly "Radar Speed Advisory Assembly")
- 09:14, 21 July 2021 diff hist -1,564 m Recent Policy Changes in the EPG EPG 903.4.8 and EPG 903.4.9
- 09:11, 21 July 2021 diff hist +2,394 m 903.4 Overhead Sign Mounting Per BR and TS, in EPG 903.4.8 and .9, expanded and updated guidance for handling bridge sign attachments to current established practice. References to wall-mounted structures removed from EPG 903.4.8 and .9
- 14:09, 19 July 2021 diff hist +39 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per CM, updated link to SWPPP Form 806.8.2
- 14:07, 19 July 2021 diff hist +135 m Category:101 Standard Forms Per CM, updated links to SWPPP Form 806.8.2 and added new Non-Conformance Report (NCR) form in EPG 101
- 10:20, 16 July 2021 diff hist +68 m Help Article →EPG Approval Process
- 10:18, 16 July 2021 diff hist -65 m Help Article →EPG Approval Process
- 10:15, 16 July 2021 diff hist +2 m Help Article →EPG Ballot Cycles: updated ballot calendar
- 09:46, 16 July 2021 diff hist +51 m Recent Policy Changes in the EPG EPG 903.7.49
- 09:39, 16 July 2021 diff hist +445 m 903.7 Conventional Road Guide Signs →903.7.49 Community Wayfinding Signs (MUTCD Section 2D.50): Per TS, as a convenience to cities, provided a simplified document, "Key Wayfinding Requirements"
- 09:05, 16 July 2021 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Jul 2021.xlsx current
- 09:04, 16 July 2021 diff hist 0 m 606.1 Guardrail Per Charles Schumann, updated Length of Need Calculator by removing wording associated with cautions and warnings as well as other minor revisions.
- 12:55, 15 July 2021 diff hist +50 m Recent Policy Changes in the EPG EPG 236.4.7.2
- 12:23, 15 July 2021 diff hist +325 m 236.4 Description Writing and Titles →236.4.7.2 Quitclaim Deed (to the Commission): Per RW, clarified guidance about the determination and documentation of when the release of tenant interest is required
- 07:23, 15 July 2021 diff hist -120 m Recent Policy Changes in the EPG EPG 146
- 06:38, 15 July 2021 diff hist +158 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.2.3 Commercially Useful Function (CUF): Per ECR, updated material supplier CUF frequency to every 30 days, regardless of DBE activity
- 06:34, 15 July 2021 diff hist -29 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.3 DBE Trucking Companies: removed archaic bulldozer symbol
- 11:20, 14 July 2021 diff hist -73 Category:1180 Bituminous Stockpile Patching Material
- 11:20, 14 July 2021 diff hist 0 N File:903.7.49 Key Wayfinding.pdf current