- 08:2308:23, 29 April 2025 diff hist +51 m 751.40 LFD Widening and Repair →751.40.8.4.2.3 Development and Tension Lap Splice Lengths - Other Than Top Bars (\, F_y = 60 ksi): updated title formatting
- 08:2108:21, 29 April 2025 diff hist +53 751.40 LFD Widening and Repair →751.40.8.4.2.2 Development and Tension Lap Splice Lengths - Top Bars ( F_y = 60 ksi): updated title formatting
- 08:0608:06, 29 April 2025 diff hist +91 User:Hoskir No edit summary Tag: visualeditor
- 07:5607:56, 29 April 2025 diff hist −2 751.40 LFD Widening and Repair →751.40.8.4.2.2 Development and Tension Lap Splice Lengths - Top Bars (\, F_y = 60 ksi)
28 April 2025
- 13:2513:25, 28 April 2025 diff hist 0 Job Special Provisions No edit summary
- 13:2013:20, 28 April 2025 diff hist +4 Job Special Provisions updated JSP info
- 11:4611:46, 28 April 2025 diff hist +67 751.40 LFD Widening and Repair updating formatting and split into two pages because the Math API was getting to many requests and creating errors.
- 11:3411:34, 28 April 2025 diff hist +4,618 751.40 LFD Widening and Repair No edit summary
- 10:5310:53, 28 April 2025 diff hist +917 751.40 LFD Widening and Repair updating table of contents
- 09:2609:26, 28 April 2025 diff hist +49 751.40 LFD Widening and Repair (CONTINUED) split page due to formulas not working
- 09:2509:25, 28 April 2025 diff hist −150,925 751.40 LFD Widening and Repair No edit summary
- 07:4007:40, 28 April 2025 diff hist −52,557 751.40 LFD Widening and Repair (CONTINUED) →751.40.8.11 Open Concrete Intermediate Bents and Piers
- 07:1707:17, 28 April 2025 diff hist +27 751.40 LFD Widening and Repair (CONTINUED) No edit summary
- 07:0307:03, 28 April 2025 diff hist −195,681 751.40 LFD Widening and Repair (CONTINUED) No edit summary
- 06:5306:53, 28 April 2025 diff hist +399,339 N 751.40 LFD Widening and Repair (CONTINUED) split page due to formulas not working
25 April 2025
- 13:3613:36, 25 April 2025 diff hist +635 m 616.4 Flagger Control (MUTCD Chapter 6D) →616.5.1 Qualifications for Flaggers (MUTCD 6E.01): updated MoDOTU to MOVERS
- 13:0613:06, 25 April 2025 diff hist −1 m 106.18 Technician Certification Program updated MoDOT U to MOVERS
- 12:0512:05, 25 April 2025 diff hist −1,754 m Category:110 State and Federal Wage Rates and Other Requirements updated link
- 12:0112:01, 25 April 2025 diff hist +2,039 Category:110 State and Federal Wage Rates and Other Requirements updated per RR4048
- 08:1608:16, 25 April 2025 diff hist 0 N Category:Pages with math errors Created blank page current
- 07:3607:36, 25 April 2025 diff hist +361 Recent Policy Changes in the EPG No edit summary
- 07:2507:25, 25 April 2025 diff hist +107 106.21 Summary of Materials Inspected updated per RR4043
24 April 2025
- 11:1111:11, 24 April 2025 diff hist +188 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.10.1 Renovation and Demolition of Structures: updated Asbestos information links
- 11:0411:04, 24 April 2025 diff hist +1 m 236.5 Property Management →236.5.18 Categorical Exclusion (CE) Review: updated link to Form 3.1.2 current
- 07:3007:30, 24 April 2025 diff hist 0 N Category:Pages with math render errors Created blank page current
23 April 2025
- 12:2312:23, 23 April 2025 diff hist +1 m 751.50 Standard Detailing Notes →G1. Concrete Bents: updated note G1.45 per email
- 12:0212:02, 23 April 2025 diff hist −48,370 Category:108 Prosecution and Progress moved sub sections (ex. 108.1) to their own page Tag: Replaced
- 11:5411:54, 23 April 2025 diff hist +16,235 N 108.1 Subletting of Contract (for Sec 108.1) moved from main category to new page
- 11:4911:49, 23 April 2025 diff hist +285 N 108.2 Notice to Proceed (for Sec 108.2) moved from main category to new page current
- 09:3309:33, 23 April 2025 diff hist +183 N 108.3 Prosecution of Work moved from main category to new page current
- 09:3009:30, 23 April 2025 diff hist +186 N 108.4 Progress Schedules moved from main category to new page current
- 09:2809:28, 23 April 2025 diff hist +192 N 108.5 Labor, Methods and Equipment moved from main category to new page current
- 09:2609:26, 23 April 2025 diff hist +196 N 108.6 Temporary Suspension of Work moved from main category to new page current
- 09:2109:21, 23 April 2025 diff hist +19,650 N 108.7 Contract Time for Completion of the Work moved from main category to new page
- 08:4908:49, 23 April 2025 diff hist +334 N 108.8 Liquidated Damages for Failure or Delay in Completing Work on Time moved from main category to new page current
- 08:4708:47, 23 April 2025 diff hist +253 N 108.9 Signal and Lighting Malfunctions moved from main category to new page current
- 08:4308:43, 23 April 2025 diff hist +222 N 108.10 Default of Contract moved from main category to new page current
- 08:3908:39, 23 April 2025 diff hist +1,921 N 108.11 Termination of Contract for Convenience of the Commission moved from main category to new page
- 08:3508:35, 23 April 2025 diff hist +353 N 108.12 Notice to Contractor and Surety moved from main category to new page current
- 08:3308:33, 23 April 2025 diff hist +209 N 108.13 Termination of Contract for Misconduct moved from main category to new page current
- 08:3108:31, 23 April 2025 diff hist +206 N 108.14 Determination of Compensation and Contract Time Extension for Excusable, Noncompensable and Compensable Delays moved from main category to new page current
- 08:2808:28, 23 April 2025 diff hist +7 m 108.16 Project Dates updated formatting
- 08:2608:26, 23 April 2025 diff hist +224 N 108.15 Suspension of Work Directed by the Engineer moved from main category to new page
- 08:2108:21, 23 April 2025 diff hist +8,011 N 108.16 Project Dates moved from main category to new page
- 07:0907:09, 23 April 2025 diff hist +93 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.10.1 Renovation and Demolition of Structures: updated DNR contact information
22 April 2025
- 11:4911:49, 22 April 2025 diff hist −4 m Talk:642.9 Sidewalk Ramp and Curb Ramp Design Criteria removed nonexistant link current
18 April 2025
- 12:2312:23, 18 April 2025 diff hist +11 751.50 Standard Detailing Notes →G1. Concrete Bents: updated per RR4033
- 12:2012:20, 18 April 2025 diff hist +11 751.39 Pile Footings →751.39.1 Dimensions: updated per RR4033
- 12:1512:15, 18 April 2025 diff hist +1 m 751.38 Spread Footings →751.38.8.3.1 Spread Footing Reinforcement: updated per RR4033
- 12:1112:11, 18 April 2025 diff hist 0 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column: updated per RR4033