User contributions for Hoskir
Jump to navigation
Jump to search
19 December 2025
- 13:3213:32, 19 December 2025 diff hist +13 Recent Policy Changes in the EPG No edit summary
- 13:3113:31, 19 December 2025 diff hist +148 Recent Policy Changes in the EPG No edit summary
- 12:0112:01, 19 December 2025 diff hist +888 Recent Policy Changes in the EPG No edit summary
- 11:3511:35, 19 December 2025 diff hist +2,141 320.1 Preliminary Geotechnical Report (PGR) →320.1.1 Procedure: updated per RR4141 current
- 08:5808:58, 19 December 2025 diff hist −28 751.39 Pile Footings →751.39.5 Reinforcement: updated per RR4140
- 08:3808:38, 19 December 2025 diff hist +27 N File:751.39.5-03 2025.png File uploaded with MsUpload current
- 08:2608:26, 19 December 2025 diff hist +27 N File:751.39.5-01 2025.png File uploaded with MsUpload current
- 08:2308:23, 19 December 2025 diff hist +167 m 751.39 Pile Footings →751.39.3 Pile Design: updated per RR4140
- 08:2108:21, 19 December 2025 diff hist −11 751.39 Pile Footings →751.39.1 Dimensions: updated per RR4140
- 08:1208:12, 19 December 2025 diff hist +27 N File:751.39.1-01 2025.png File uploaded with MsUpload current
- 08:1208:12, 19 December 2025 diff hist +27 N File:751.39.1-02 2025.png File uploaded with MsUpload current
- 08:0108:01, 19 December 2025 diff hist −8 751.9 Bridge Seismic Design →751.9.1.2.4.2 Footing (Spread Footing and Pile Cap Footing) Joint Shear Reinforcement: updated per RR4140
18 December 2025
- 15:2315:23, 18 December 2025 diff hist 0 m Category:1001 General Requirements for Material →1001.5 Field Testing Procedures: moved image up just a formatting change
- 15:2015:20, 18 December 2025 diff hist −8 Category:1001 General Requirements for Material →Table 1001.5.1.2 Size of Testing: updated to match AASHTO per RR4133
- 14:5214:52, 18 December 2025 diff hist +5 Category:1001 General Requirements for Material →Table 1001.3 Size of Original Field Samples: updated table to match AASHTO per RR4132
17 December 2025
- 15:5315:53, 17 December 2025 diff hist +2 Job Special Provisions No edit summary
15 December 2025
- 15:0315:03, 15 December 2025 diff hist −76 m 751.50 Standard Detailing Notes →H11. Fences and Sidewalks: changes to notes per email missed in RR3995
- 10:3410:34, 15 December 2025 diff hist −1,433 User talk:Hoskir →616.8.2.1 Typical Applications
- 08:5508:55, 15 December 2025 diff hist +571 User talk:Hoskir →616.8.2.1 Typical Applications
12 December 2025
- 14:3014:30, 12 December 2025 diff hist +3,681 User talk:Hoskir →616.8.2.1 Typical Applications
- 12:5412:54, 12 December 2025 diff hist +1,028 User talk:Hoskir →616.8.2.1 Typical Applications
- 09:5209:52, 12 December 2025 diff hist +207 User talk:Hoskir →616.8.2.1 Typical Applications
- 09:2709:27, 12 December 2025 diff hist +1,318 User talk:Hoskir →TA's
11 December 2025
- 09:0709:07, 11 December 2025 diff hist +583 User talk:Hoskir →TA's
- 08:1608:16, 11 December 2025 diff hist +35,347 User talk:Hoskir No edit summary
4 December 2025
- 11:2311:23, 4 December 2025 diff hist +10 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: added and back in and added underscores
- 11:2111:21, 4 December 2025 diff hist −10 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: removed word and from note H2c1.46
25 November 2025
- 15:3815:38, 25 November 2025 diff hist +95 m 616.16 Typical Applications (MUTCD Chapter 6P) →616.8.2.1 Typical Applications: updated draft TA note
- 15:3115:31, 25 November 2025 diff hist +1 616.16 Typical Applications (MUTCD Chapter 6P) →616.8.2.1 Typical Applications
- 15:0115:01, 25 November 2025 diff hist +55 m 616.16 Typical Applications (MUTCD Chapter 6P) →616.8.2.1 Typical Applications: updated draft TA note
- 14:5614:56, 25 November 2025 diff hist +488 616.16 Typical Applications (MUTCD Chapter 6P) →616.8.2.1 Typical Applications
- 11:2411:24, 25 November 2025 diff hist −50 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1.2 Step 2, Cultural Resource Investigations: updated links in 136.6.4.1.2 step 2a
- 08:1708:17, 25 November 2025 diff hist −2 m 751.50 Standard Detailing Notes →C1. Bill of Reinforcing Steel: removed period from end of note c1.9
24 November 2025
- 08:3508:35, 24 November 2025 diff hist 0 m 121.7 Program Estimates corrected report date current
19 November 2025
- 13:5613:56, 19 November 2025 diff hist +27 Category:941 Permits and Access Requests →941.6.3.6 Deposit Requirements: updated per RR4127 - added starting date for performance bonds
- 13:4913:49, 19 November 2025 diff hist +453 Recent Policy Changes in the EPG No edit summary
- 13:2913:29, 19 November 2025 diff hist −324 751.50 Standard Detailing Notes →C. Reinforcing Steel Notes: updated per RR4125
- 12:5712:57, 19 November 2025 diff hist +77 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses and Standard Plans: updated per RR7125
- 11:2211:22, 19 November 2025 diff hist −7 m Category:129 Public Involvement →129.6.4 Presentation for Location and Design Approval to the Commission and Commission Actions Needed: updated link to agenda checklist / backup schedule current
- 11:1511:15, 19 November 2025 diff hist +50 m Category:941 Permits and Access Requests →941.2.6 Final Approval and/or Document Execution: updated link to backup schedule
- 10:2710:27, 19 November 2025 diff hist +16 m LPA:136.8 Local Public Agency Land Acquisition →136.8.2.1 Funding Requirements: updated link to Uniform Act
18 November 2025
- 14:5114:51, 18 November 2025 diff hist −79 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Pollution Prevention Plan (SWPPP): updated link to Land disturbance inspection record. current
- 12:4212:42, 18 November 2025 diff hist +305 Job Special Provisions added njsp1901 back
- 09:2009:20, 18 November 2025 diff hist +23 Recent Policy Changes in the EPG No edit summary
- 09:1809:18, 18 November 2025 diff hist +396 Recent Policy Changes in the EPG No edit summary
- 09:1009:10, 18 November 2025 diff hist +24 m 129.6 Public Hearing updated link to 23 CFR 771.111 current
- 09:0109:01, 18 November 2025 diff hist 0 m 121.7 Program Estimates updated Eng Factors Report in Related Info Box
- 09:0009:00, 18 November 2025 diff hist +86 121.7 Program Estimates updated Engineering Factors Report
17 November 2025
- 14:3514:35, 17 November 2025 diff hist −419 903.18 Memorial Signs →903.14.5 Adopt-A-Highway Program: removed per RR4122
- 14:3414:34, 17 November 2025 diff hist +462 903.18 Memorial Signs Undo revision 56861 by Hoskir (talk) Tag: Undo