Recent Policy Changes in the EPG
Full Depth Pavement Repairs Basis of Payment 1/26/22: EPG 613.1.1 Full Depth Pavement Repairs, Basis of Payment presents Resident Engineers with expanded guidance about compensating contractors the concrete costs for full depth repairs that significantly exceed typical section plan depths Increased Federal Share Program 1/26/22: New EPG 104.2.1 Increased Federal Share Program and EPG 104.2.2 District Role present guidance about how and when to apply for a 5% increase of the federal cost share of innovative projects (that is, 15% state matching vs. 20% state matching). Design-Build 1/26/22: The new, expanded design-build guidance, including updated forms and checklists, brings EPG 139 Design - Build up to current practices. EPG 149's title was slightly modified and its guidance has also been brought up to current practices for project delivery method determination and initial risks. Since design-build is only one method of project delivery, EPG 149 roject Delivery Determination and Initial Risk Assessment also reflects the concurrent revisions in EPG 139. EPG 105.9.4 Documentation Records 1/21/22: Guidance has been updated to reflect current methods of documentation. Subcontractor Insurance 1/14/22: Guidance has been updated in EPG 102 Bidding Requirements and Conditions and EPG 108.1.1 Review and Approval of a Subcontract Request to reflect that, as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance. EPG 1036.2.1.1 Reinforcing Steel, Dowel Bars, Mechanical Bar Splices and Cold Drawn Wire 1/13/22: To decrease the risk of fracture in the jaws, a 30” minimum length for the #14 and #18 reinforcing steel tension test bars is now required. 1/10/22: Guidance has been expanded to align with the updated MoDOT/MDNR Memorandum of Understanding (MOU). EPG 903.9.9 City/County Limit Signs (I4, I5, I6 Series) and EPG 903.9.11 Custom City Limit and Custom County Line Signs (I4-1a, I4-2b, I6-1a) 12/30/21: Populations will no longer be included on city limit signs. City limit and county line sign designs will be modified to match the MUTCD standard layout of jurisdictional boundary signs. EPG 127.1 Request for Environmental Services 12/28/21: Guidance for the process of Request for Environmental Services (RES) submittals, especially that of the electronic process, has been clarified. Associated guidance in EPG 147.3 Job Order Contracting (JOC) was also clarified. Price Adjustment for Fuel 12/22/21: In EPG 109.14 Price Adjustment for Fuel, guidance was clarified to explicitly exclude fixed-cost pay items in Job Order Contracts from qualifying for the Fuel Adjustment, per Sec. 109.14. MSE Wall Construction: Pipe Pile Spacers Guidance 12/17/21: In EPG 751.24.2.1 Design, guidance was revised so that, in lieu of using pipe pile spacers, the contractor will have the option to use pile jackets for bridges up to 200 feet long. Numerous revisions in EPG 751.50 Standard Detailing Notes reflect this pile jacket revision. EPG 909.2 Nonrecurring Congestion 12/14/21: "Work Zone Management Guidebook" and associated information has been added. New Statewide Operating Permit Authorization 12/13/21: Guidance throughout much of EPG 127.29 Stormwater and in EPG 173.2.1 Governing Regulations, CWA Section 402 (Land Disturbance) has been updated and expanded to reflect the new permit cycle, particularly the obligations of the new comprehensive permit obligations of the TS4. Generally, the changes to the permit do not alter MoDOT's overall stormwater or land disturbance program. EPG 806.8.4 Site Inspections and Reports was revised so that a routine inspection may be delayed until the next business day if it falls on a holiday. EPG 237.9.3.2 Required Information for Submittal 12/7/21: Guidance has been revised for which documents need to be submitted and how they are to be submitted when turning in PS&E to CO Design. EPG 236.6.3.3 Waiver Valuation 12/6/21: The maximum threshold for waiver valuation reports was increased to $25,000 from $10,000. 12/6/21: Guidance is now available for contract TR62, Kansas Department of Transportation, Kansas City Scout Bi-State Agreement. 11/23/21: Guidance is now available for two contracts (TR58, Transportation Data License Agreement and TR61, Motor Vehicle Crash Data License Agreement). EPG 206.4 Construction Inspection Guidelines for Sec 206 11/22/21: New guidance has been added to clarify culvert cleanout expectations. 11/18/21: Revisions provide a distinction between the roles for contractors and maintenance when replacing and/or repairing guard cable. A new Tension Log Form is to be used when repairing guard cable. Warrants for guard cable implementation have also been updated. Guidance for maintenance of crashworthy end terminals, guardrail, guard cable and fixed impact attenuators has been removed from EPG 171.11 Roadside Appurtenances. Work Zone Crash Cushion 11/17/21: EPG 612 Impact Attenuators was revised to provide guidance on when WZ crash cushions are to be used and clarifies when sand barrels are to be used. EPG 905.3 Transportation Impact Analysis 11/15/21: This new article is largely expected to be utilized by contractors. It is a compilation of best practices for Transportation Impact Analysis (TIA), a study that evaluates the potential adverse effects of proposed projects on surrounding and supporting transportation infrastructure and services. Revisions in EPG 905.1 Traffic Data Collection support the new TIA guidance. EPG 236.10.7.11 RWPA System Requirements for Condemnations 11/15/21: Information required to enter into RWPA for condemnation cases has been updated. Transportation Systems Management and Operations (TSMO) 11/15/21: The new EPG 909 Transportation Systems Management and Operations (TSMO) presents strategies to cost-effectively optimize the safety, reliability and capacity of the transportation system and are generally categorized to address either recurring or non-recurring congestion. Guidance related to (TSMO) that has been added or updated include EPG 235.6 Approval of Preliminary Plan and EPG 948 Incident Response Plan and Emergency Response Management. EPG 616.13.6.3 Smart Work Zone (SWZ) Strategy Selection has been revised to provide tools to access the traffic impact of the proposed project design(s). Bond Breaker for Prestressed Members, Vent Locations for Box Beams 11/12/21: In EPG 751.22.2.4, Girder-Slab Interface, reverted the field-applied two-layer roofing felt bond breaker to the previous fabricator applied bond breaker. In EPG 1029.2.15 Bond Breaker, new guidance is available for inspecting bond breakers. In EPG 751.21.3.4.1 Arrangements and EPG 751.21.3.8 Vent Pipes for Stream Crossings, added guidance that some strand locations are not available when a vent pipe is required and revised locations of vent pipes. EPG 712.1.4.1.3 Shear Connector Welding 11/12/21: Field weld testing requirements have been clarified. |