Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 130)
m (EPG 642.1)
Line 39: Line 39:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early September, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early September, the numbers of hits are:'''
 
|-
 
|-
|'''20.''' [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], 44826||'''10.''' [[:Category:903 Highway Signing|EPG 903]], 77451
+
|'''20.''' [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], 44865||'''10.''' [[:Category:903 Highway Signing|EPG 903]], 77496
 
|-
 
|-
|'''19.''' [[:Category:1000 MATERIALS|EPG 1000]], 56798||'''9.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 94484
+
|'''19.''' [[:Category:1000 MATERIALS|EPG 1000]], 56800||'''9.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 94489
 
|-
 
|-
|'''18.''' [[903.5 Regulatory Signs|EPG 903.5]], 61089||'''8.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 106857
+
|'''18.''' [[903.5 Regulatory Signs|EPG 903.5]], 61095||'''8.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 106868
 
|-
 
|-
|'''17.''' [[751.13 Expansion Devices|EPG 751.13]], 62990||'''7.''' [[:Category:200 GEOMETRICS|EPG 200]], 107480
+
|'''17.''' [[751.13 Expansion Devices|EPG 751.13]], 62997||'''7.''' [[:Category:200 GEOMETRICS|EPG 200]], 107493
 
|-
 
|-
|'''16.''' [[751.5 Standard Details|EPG 751.5]], 64795 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 130231
+
|'''16.''' [[751.5 Standard Details|EPG 751.5]], 64806 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 130254
 
|-
 
|-
|'''15.''' [[903.6 Warning Signs|EPG 903.6]], 66017 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 155303
+
|'''15.''' [[903.6 Warning Signs|EPG 903.6]], 66022 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 155326
 
|-
 
|-
|'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 67392||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 161832
+
|'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 67398||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 161859
 
|-
 
|-
|'''13.''' [[:Category:101 Standard Forms|EPG 101]], 69429 ||'''3.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 168570
+
|'''13.''' [[:Category:101 Standard Forms|EPG 101]], 69458 ||'''3.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 168608
 
|-
 
|-
|'''12.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 72629||'''2.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 179439
+
|'''12.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 72654||'''2.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 179468
 
|-
 
|-
|'''11.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 72945||'''1.''' EPG Main Page, 802088
+
|'''11.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 72954||'''1.''' EPG Main Page, 802446
 
|}
 
|}
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[media:136.9.4 Sept 2012.doc|ADA Checklist]]'''
 +
 +
9/4/12: The ADA Checklist was updated, replacing the old "ADA Post-Construction Checklist". The new ADA Checklist presents expanded information to comply with the US Access Board's PROWAG 2005 and 2010 ADA/ABA standards.
 +
 
'''Value Engineering'''
 
'''Value Engineering'''
  
Line 156: Line 160:
  
 
7/25/12:  This new article includes guidance for [[147.2 Add Alternate Bidding|Add Alternate Bidding]] (additional items of work that the contractors all bid on and may be awarded if the bids come within the budget specified in the bidding documents), [[147.3 Job Order Contracting (JOC)|Job Order Contracting (JOC)]] (a procurement process that allows MoDOT to award fixed price construction contracts with indefinite delivery and indefinite quantities at individual work locations throughout the project limits) and [[147.1 Alternative Technical Concepts|Alternative Technical Concepts]] (a proposed change to agency-supplied base design configurations, project scope, design criteria or construction criteria that provides a solution that is equal or better to the requirement in the contract).
 
7/25/12:  This new article includes guidance for [[147.2 Add Alternate Bidding|Add Alternate Bidding]] (additional items of work that the contractors all bid on and may be awarded if the bids come within the budget specified in the bidding documents), [[147.3 Job Order Contracting (JOC)|Job Order Contracting (JOC)]] (a procurement process that allows MoDOT to award fixed price construction contracts with indefinite delivery and indefinite quantities at individual work locations throughout the project limits) and [[147.1 Alternative Technical Concepts|Alternative Technical Concepts]] (a proposed change to agency-supplied base design configurations, project scope, design criteria or construction criteria that provides a solution that is equal or better to the requirement in the contract).
 
'''[[:Category:450 Bituminous Pavement Design#450.9 Safety EdgeSM|EPG 450.9 Safety Edge]]'''
 
 
7/25/12: New guidance for Safety Edge<sup>SM</sup>.  This concept consists of beveling the edge of an HMA pavement during placement, to provide a smooth height transition for future errant vehicles to regain the roadway.  The Safety Edge<sup>SM</sup> is easy to construct, uses very little additional material, and has the residual benefit of increasing the compaction of the edge.
 

Revision as of 14:18, 4 September 2012

EPG.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
WELCOME
RECENT POLICY CHANGES IN THE EPG
Maintenance Worker Marc Jackson (left) practices a pre-trip inspection with Darnel DeBoise (right), a student earning his commercial drivers license at St. Louis' Westlake training site.
Shari Dye, NE District Safety and Health Manager, discusses the contents of a chemical's container with Elsberry Maintenance Supervisor Roy Niemeyer during his building's annual environmental inspection.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Checking plans on the Chestnut Expressway/Rte. 65 Diverging Diamond Interchange project, Springfield's newest DDI, are Resident Engineer Brad Gripka, left, and Sr. Construction Inspector Craig Huckaby.
Keith Zey, a Central District Maintenance Crew Leader, became the first Safety Jackpot winner. Safety Jackpot is one of the first new programs promoting a safe work environment. This incentive program rewards excellence in safety.
Perhaps you've wondered how many hits the most popular EPG articles have. As of early September, the numbers of hits are:
20. EPG 136, 44865 10. EPG 903, 77496
19. EPG 1000, 56800 9. EPG 616, 94489
18. EPG 903.5, 61095 8. EPG 616.23, 106868
17. EPG 751.13, 62997 7. EPG 200, 107493
16. EPG 751.5, 64806 6. EPG 600, 130254
15. EPG 903.6, 66022 5. EPG 100, 155326
14. EPG 620.2, 67398 4. EPG 700, 161859
13. EPG 101, 69458 3. EPG 751, 168608
12. EPG 751.40, 72654 2. EPG 900, 179468
11. EPG 400, 72954 1. EPG Main Page, 802446

ADA Checklist

9/4/12: The ADA Checklist was updated, replacing the old "ADA Post-Construction Checklist". The new ADA Checklist presents expanded information to comply with the US Access Board's PROWAG 2005 and 2010 ADA/ABA standards.

Value Engineering

9/4/12: EPG 130 Value Engineering was clarified to bring guidance in line with nationwide VE standards.

Three Updated QRGs

8/31/12: Contractor Pay Estimates, Daily Work Reports and Subcontracts were updated.

Navigable Waters Insurance Protection

8/30/12: Navigable Waters Insurance Protection guidance was added to help Resident Engineers understand when this special type of insurance is required and what is needed to verify coverage.

Prime Consultants and Subconsultants

8/29/12: In EPG 134.1.3 Consultant Qualification, guidance was clarified for qualification.

Anchor Bolts Used on Weathering Steel Bridges

8/28/12: Bridge has clarified some the H3c and d Bearings Standard Detailing Notes to change the requirement for anchor bolts used on weathering steel bridges to coated with inorganic zinc primer. Also, in numerous notes and figures, especially in EPG 751.11.3 Details, "rod" was changed to "bolt", as in "anchor bolt".

Full Depth Pavement Repair Dowel Bars

8/28/12: New guidance instructs designers calculating quantities for full depth repairs that each dowel bar is to be counted separately as a pay item, regardless of whether being drilled into a slab or placed as part of a dowel basket with other bars.

Links to Free Web-based NHI Training

8/27/12: Links to NHI's Transportation Curriculum Coordination Council courses are now available at EPG 106.18 Technician Certification Program.

Overcoating Existing Steel Standard Detailing Notes

8/24/12: Three paint notes were modified, primarily revising an existing note that prime coat shall not be required for calcium sulfonate overcoating projects.

Two Updated QRGs

8/23/12: Change Orders – Value Engineering and Job Order Contracts were updated.

Widening and Repair of Bridges

8/23/12: Bridge has updated numerous figures in EPG 751.40.2.4.1 Cast-In-Place Deck With (and Without) an Existing Wearing Surface, Hydro Demolition to match the standard plans.

Consultant Contract Invoicing

8/22/12: The invoice template guidance was clarified and slightly expanded in EPG 134.5.1 Invoicing.

Mulch Overspray

8/20/12: An acceptance statement was added to clarify the method of acceptance for mulch overspray.

Girder/Beam Chairs and Concrete Pile Cap Integral End Bents

8/14/12: Bridge Division has clarified guidance for girder chairs and for reinforcement of concrete pile cap integral end bents.

Table 1020.4.17 Tensile Strength of Lock Seams

8/9/12: This table's values have been updated to conform with AASHTO and ASTM standard practices.

EPG 751.2.1.1 Dead Load

8/9/12: The table of unit weights of dead load was updated to conform with AASHTO Table 3.5.1-1.

Safety EdgeSM

8/3/12: A Safety EdgeSM constructed at the edge of each shoulder has been added as a minimum expectation for minor route shouldering projects.

Copying Detailing Notes

8/2/12: Bridge has produced directions on how to copy detailing notes from the EPG to MicroStation drawings.

Minor Routes Shouldering Project Guidelines

8/2/12: Since the public perceives shoulders as an enhancement to the transportation system and consistently identifies them as a top tier desire, this new article facilitates the design of shoulders for minor routes.

EPG 139 Design-Build

7/31/12: Guidance for the procurement process and implementation procedures has been expanded in this article.

Two Updated QRGs

7/31/12: Contract Adjustments and Line Item Adjustments were updated.

New Adopt-A-Highway Signs

7/26/12: New guidance has been added to EPG 903.9.6 for the updated signs.

Sequential Flashing Warning Light

7/26/12: Fig. 616.6.83 has been added for additional guidance.

New Guardrail Height Requirement

7/25/12: Guidance was revised with the new guardrail height requirements per FHWA and AASHTO. New height requirements were also provided for using guardrail with urban sections of curb and curb and gutter.

Innovative Contracting

7/25/12: This new article includes guidance for Add Alternate Bidding (additional items of work that the contractors all bid on and may be awarded if the bids come within the budget specified in the bidding documents), Job Order Contracting (JOC) (a procurement process that allows MoDOT to award fixed price construction contracts with indefinite delivery and indefinite quantities at individual work locations throughout the project limits) and Alternative Technical Concepts (a proposed change to agency-supplied base design configurations, project scope, design criteria or construction criteria that provides a solution that is equal or better to the requirement in the contract).