Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 108.11)
m (EPG 134)
Line 45: Line 45:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-December, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-December, the numbers of hits are:'''
 
|-
 
|-
|'''20.''' [[136.12 Figures and Glossary|EPG 136.12]], 57773||'''10.''' [[:Category:903 Highway Signing|EPG 903]], 84981
+
|'''20.''' [[136.12 Figures and Glossary|EPG 136.12]], 57998||'''10.''' [[:Category:903 Highway Signing|EPG 903]], 85083
 
|-
 
|-
|'''19.''' [[:Category:1000 MATERIALS|EPG 1000]], 59423||'''9.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 99953
+
|'''19.''' [[:Category:1000 MATERIALS|EPG 1000]], 59484||'''9.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 100120
 
|-
 
|-
|'''18.''' [[751.13 Expansion Devices|EPG 751.13]], 66518 ||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 111749
+
|'''18.''' [[751.13 Expansion Devices|EPG 751.13]], 66629 ||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 111801
 
|-
 
|-
|'''17.''' [[903.5 Regulatory Signs|EPG 903.5]], 67468||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 116186
+
|'''17.''' [[903.5 Regulatory Signs|EPG 903.5]], 67624||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 116335
 
|-
 
|-
|'''16.''' [[751.5 Standard Details|EPG 751.5]], 70999 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 135841
+
|'''16.''' [[751.5 Standard Details|EPG 751.5]], 71098 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 135958
 
|-
 
|-
|'''15.''' [[903.6 Warning Signs|EPG 903.6]], 71846 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 162144
+
|'''15.''' [[903.6 Warning Signs|EPG 903.6]], 71915 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 162273
 
|-
 
|-
|'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 74544||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 169578
+
|'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 74624||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 169741
 
|-
 
|-
|'''13.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 77865 ||'''3.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 180391
+
|'''13.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 77990 ||'''3.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 180704
 
|-
 
|-
|'''12.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 80569 ||'''2.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 188171
+
|'''12.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 80610 ||'''2.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 188327
 
|-
 
|-
|'''11.''' [[:Category:101 Standard Forms|EPG 101]], 83960   ||'''1.''' EPG Main Page, 903946
+
|'''11.''' [[:Category:101 Standard Forms|EPG 101]], 84169   ||'''1.''' EPG Main Page, 906039
 
|}
 
|}
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[:Category:134 Engineering Professional Services|EPG 134 Engineering Professional Services]]'''
 +
 +
12/11/12:  Numerous group email addresses were added to guidance. Also, in [[:Category:134 Engineering Professional Services#134.4 Contract Approval, Execution and Distribution|EPG 134.4 Contract Approval, Execution and Distribution]] the distribution and number of copies of executed contracts was adjusted.
 +
 
'''Settlement for Left-Over Material on a Construction Project'''
 
'''Settlement for Left-Over Material on a Construction Project'''
  
Line 161: Line 165:
 
'''Consultant Contract Negotiation, Basis of Payment'''
 
'''Consultant Contract Negotiation, Basis of Payment'''
  
10/25/12: In [http://epg.modot.org/index.php?title=Category:134_Engineering_Professional_Services#134.3.5_Basis_of_Payment EPG 134.3.5 Basis of Payment], the mileage reimbursable rate was changed from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
+
10/25/12: In [http://epg.modot.org/index.php?title=Category:134_Engineering_Professional_Services#134.3.5_Basis_of_Payment EPG 134.3.5 Basis of Payment], the mileage reimbursable rate was changed from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
 
 
'''[http://epg.modot.org/index.php?title=903.6_Warning_Signs#903.6.6_Placement_of_Warning_Signs_.28MUTCD_Section_2C.05.29 Replacing, Maintaining or Modifying the Placement of a Warning Sign ]'''
 
 
 
10/23/12:  A statement was added reiterating useful [http://epg.modot.org/index.php?title=903.6_Warning_Signs#Table_903.6.6_Guidelines_for_Advance_Placement_of_Warning_Sign Table 903.6.6 Guidelines for Advance Placement of Warning Sign] information for the districts.
 

Revision as of 14:43, 11 December 2012

EPG.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
WELCOME
RECENT POLICY CHANGES IN THE EPG
Main Page Dec 5, 2012b.jpg
Main Page Dec 5, 2012.jpg
Main Page Dec 5, 2012a.jpg
Charges light up the old westbound I-70 Blanchette Bridge. The blasting subcontractor, Demtech, Inc. from Wyoming, dropped the 4.5 million lb., 1030 ft. span into the Missouri River with 65 lbs. of explosives using linear shaped charges specifically designed to cut the steel. The detonating velocity was 28,000 ft/sec and the whole shot took 0.17 thousands of a second. Crews will be pulling out the pieces over the next few days.
Lynette Bryant, a carpenter with Massman Traylor Alberici (MTA), cleans the form plates for the new Mississippi River Bridge tower's post-tensioning block-outs. These plates cover the block-outs in the tower legs when MTA grouts the post-tensioning ducts and block-outs.
Sr. Maintenance Workers Roger Page (in bucket) and Roy Collins replace some of the signs along U.S. 36. The 20 ft. wide x 4 ft. tall sign is one of two that was replaced. This is the time of year maintenance focuses on sign replacement work.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

On Dec. 12th, about 180 miles of U.S. 71 will officially become I-49 between Kansas City and Pineville near the Arkansas border. Everyone is invited to the 12 noon unveiling of the I-49 sign at the Joplin East Middle School gym, 7501 E. 26th Street.
Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-December, the numbers of hits are:
20. EPG 136.12, 57998 10. EPG 903, 85083
19. EPG 1000, 59484 9. EPG 616, 100120
18. EPG 751.13, 66629 8. EPG 200, 111801
17. EPG 903.5, 67624 7. EPG 616.23, 116335
16. EPG 751.5, 71098 6. EPG 600, 135958
15. EPG 903.6, 71915 5. EPG 100, 162273
14. EPG 620.2, 74624 4. EPG 700, 169741
13. EPG 400, 77990 3. EPG 751, 180704
12. EPG 751.40, 80610 2. EPG 900, 188327
11. EPG 101, 84169 1. EPG Main Page, 906039

EPG 134 Engineering Professional Services

12/11/12: Numerous group email addresses were added to guidance. Also, in EPG 134.4 Contract Approval, Execution and Distribution the distribution and number of copies of executed contracts was adjusted.

Settlement for Left-Over Material on a Construction Project

12/10/12: In EPG 108.11 Termination of Contract for Convenience of the Commission, guidance was added for more statewide consistency in resolving payment for leftover material.

New Diverging Diamond Interchange Warning Signs

12/5/12: Guidance for the new DDI warning sign assembly has been added as EPG 903.6.7.5 and EPG 903.6.7.6 and expanded in EPG 234.6.2.2.14 Signing. Also, in EPG 903.6.7 Horizontal Alignment Signs, guidance has been provided for the use of the Advisory Speed Supplemental Plaque with horizontal alignment signs.

Finger Plate Expansion Devices

11/30/12: Finger detail figures have been added to EPG 751.13.6.2 Details at Bents.

Safety Begins With You Safety begins.jpg

11/27/12: Be on the lookout for the new Safety Begins With You boxes in several EPG articles. Videos, pamphlets and handouts delivering useful safety info will be presented. The boxes now appear in EPG 132 Safety, EPG 142 Missouri One Call System, EPG 144 Practical Operations, EPG 170 Maintenance Activity Planning Guidelines, EPG 171 Maintenance Policy and Operations, EPG 400 Flexible Pavement, EPG 616.5 Flagger Control, EPG 641 Bicycle Facilities, EPG 643 Utility Procedures, EPG 822 Roadside Vegetation Management and EPG 1100 Maintenance Materials.

EPG 751.1.2.32 Aesthetic Enhancements

11/26/12: New guidance has been added about the preferred way to specify form liners.

EPG 903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30)

11/26/12: The NO TURN ON RED sign policy was updated to comply with the MUTCD.

EPG 106.21.1.1 Summary Packet of Materials Inspected

11/19/12: The Summaries for Mixing Facility Components, I.A.S and F.A.S.T were deleted since these processes no longer apply.

EPG 620.2.2.1 Establishing and Recording No Passing Zones

11/19/12: A statement was removed about an electronic system available to districts for documenting no-passing zones. The system no longer exists and an adequate replacement is not available at this time.

Conveyance Document

11/14/12: The Full Disclosure Clause in EPG 236.5.21.6 Full Disclosure Clause was updated.

Flat Plate Expansion Devices

11/13/12: In EPG 751.13.5.1, general guidance was added. Also, a Bridge standard drawing table in EPG 751.13.5.4 replaced numerous figures and further serves as detail references.

Line Item Adjustments

11/8/12: Guidance on spreadsheet security messages was added to this QRG.

New Article, EPG 141.8 Sponsorship Programs

11/7/12: Sponsorsed programs utilize resources from third party entities to fund and support transportation-related projects. This new article meets an FHWA directive.

Camber at 7 days and 90 days for P/S Girder Design

11/7/12: Guidance in EPG 751.10.1.11 Slab Elevations, EPG 751.22.2.5 Deformations, EPG 751.22.3.8 Camber, Haunching and Girder Steps and EPG 751.50 H2c6.1 was clarified on estimating the camber at 7 days and 90 days for P/S girder design. "Design camber" was defined in EPG 1029.2.13 Inspection of Completed Members. The estimated camber at 7 days has never been included on bridge plans and this estimate should be on every set of PSI girder bridge plans.

QC/QA for Project Estimates

11/7/12: The requirements for review of the project estimate files were changed in EPG 124.1 Quality Control / Quality Assurance for Project Estimates. The responsibility of conducting QAs is now on the district, not the Design Liaison. This revision reflects current practice.

New HEC-18 Guidance for Minimum Scour Design Frequencies

11/6/12: Numerous revisions to EPG 750.3 Bridges reflect the new scour information from the new edition of FHWA's HEC-18. Also EPG 751.50 Standard Detailing Notes E1 and E3 and EPG 206.4 Construction Inspection Guidelines for Sec 206 were clarified to be consistant with current practices and practical design

New Buckle Up Sign Assemblies

11/6/12: Missouri has not passed a primary seat belt law, but many local entities are doing so within their jurisdiction. MoDOT has now provided signs and a standard method.

Removal of Expansion Device Movement Gauge Notes and Details

11/1/12: Movement gauge details (all of EPG 751.12.2.11 and EPG 751.50 notes H11.24, H11.25 and H11.26) were removed. Because inspectors were finding their plates bent upwards, it was decided to no longer require these notes and details. Gap measurements will still be measured and recorded with corresponding temperature for tracking purpose.

Engineering Professional Services, Consultant Qualifications

11/1/12: Guidance was added to EPG 134.1.3, #6 Bridge Consultants Only that the Bridge Experience Profile and Personal Bridge Experience Record forms must be updated every 3 years.

Missouri Welcome Center Affiliates Sign

11/1/12: Guidance for where this sign is allowed was expanded in EPG 903.10.6 Missouri Welcome Center Affiliates.

Emergency Reference Markers

11/1/12: Guidance was added to EPG 903.9.4 Emergency Reference Markers for sign use on non-interstate freeways and expressways and sign use for overlapping routes.

Truck-Mounted Attenuator Training

10/31/12: EPG 612.4 Truck-Mounted Attenuator Training now presents the latest guidance. The main addition to the article was info about equipment/materials stored in the bed of the host vehicle.

EPG 236.17 Junkyards

10/29/12: This article has been generally revised for greater clarification.

Equipment/Materials Stored in Bed of Host Vehicle

10/29/12: In EPG 612.1 Truck- and Trailer-Mounted Attenuators, guidance was added about hauling material in the back of a vehicle with a TMA.

Consultant Contract Negotiation, Basis of Payment

10/25/12: In EPG 134.3.5 Basis of Payment, the mileage reimbursable rate was changed from the IRS rate to GSA's current POV Mileage Reimbursable Rate.