Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m (EPG 616.18, EPG 751.22.3.8, EPG 101)
Line 26: Line 26:
 
|-
 
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 +
{| style="margin: 1em auto 1em auto"
 +
|-
 +
| colspan="2"| [[image:Main Page Oct 11 2013.jpg|center|390px|thumb|<center>'''    Motorist Assistance Operator Rocky Balfour prepares to...well, assist a motorist on I-35.    '''</center> ]]
 +
|-
 +
|colspan="2"| [[image:Main Page 2 Oct 11, 2013.jpg|center|390px|thumb|<center>'''    Work on the [http://www.newriverbridge.org/ new I-70 Mississippi River Brige] continues with painting, barrier work and, as shown above, an [http://epg.modot.mo.gov/index.php?title=Category:506_Concrete_Overlays_for_Pavement overlay].    '''</center> ]]
 +
|}
 +
 +
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised.  Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry. 
 +
 +
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://wwwi/intranet/rw/ Right of Way], [http://wwwi/design/default.htm Design], [http://wwwi/intranet/br/default.htm Bridge], [http://wwwi/intranet/cm/ Construction], [http://wwwi/intranet/tr/ Traffic] and [http://wwwi/maintenance/ Maintenance] manuals.
 +
 +
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.
 +
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
Line 39: Line 52:
 
|-
 
|-
 
| [[image:Main Page Oct 10, 2013 3.jpg|center|50px]] ||[[image:Main Page Oct 10, 2013 4.jpg|center|339px]]
 
| [[image:Main Page Oct 10, 2013 3.jpg|center|50px]] ||[[image:Main Page Oct 10, 2013 4.jpg|center|339px]]
|-
 
| colspan="2"| [[image:Main Page Oct 9, 2013 2.jpg|center|390px|thumb|<center>'''    The resurfacing project on I-49/Rte. 71 in McDonald County is nearing completion.    '''</center> ]]
 
|-
 
| colspan="2"| [[image:Main Page Oct 8, 2013 2.jpg|center|390px|thumb|<center>'''    [http://www.phillipsgrading.com/ Phillips Grading and Constr.] crews demolished the 43-yr-old [http://www.modot.org/kansascity/major_projects/GrandviewRoadBridge.htm Grandview Bridge project over Bannister St.] in southern Kansas City. The bridge is being rebuilt and the project is on schedule to wrap up at the end of the month.    '''</center> ]]
 
|}
 
 
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised.  Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry. 
 
 
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://wwwi/intranet/rw/ Right of Way], [http://wwwi/design/default.htm Design], [http://wwwi/intranet/br/default.htm Bridge], [http://wwwi/intranet/cm/ Construction], [http://wwwi/intranet/tr/ Traffic] and [http://wwwi/maintenance/ Maintenance] manuals.
 
 
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.
 
 
{| style="margin: 1em auto 1em auto"
 
|-
 
| [[image:Main Page Oct 8, 2013.jpg|center|390px|thumb|<center>'''    Chief Engineer Ed Hassinger and District Engineer Paula Gough celebrate the ribbon cutting for a [http://www.heartlandconnection.com/news/story.aspx?id=955452 new 75 ft. wide, 4,200 ft. long concrete runway at Macon Fower Memorial Airport].  The runway, which accommodates larger business aircrafts, was made possible with grants from MoDOT and the Federal Aviation Administration.      '''</center> ]]
 
 
|}
 
|}
  
Line 60: Line 58:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-October, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-October, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 82864 ||'''10.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 122530
+
|'''20.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 82955 ||'''10.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 122844
 
|-
 
|-
|'''19.'''  [[751.5 Standard Details|EPG 751.5]], 83884   ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 125310
+
|'''19.'''  [[751.5 Standard Details|EPG 751.5]], 83946   ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 125527
 
|-
 
|-
|'''18.'''  [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 85650 ||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 126672
+
|'''18.'''  [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 85834 ||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 126747
 
|-
 
|-
|'''17.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 86698   ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 146753
+
|'''17.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 86976   ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 146908
 
|-
 
|-
|'''16.'''  [[903.6 Warning Signs|EPG 903.6]], 87955 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 157367
+
|'''16.'''  [[903.6 Warning Signs|EPG 903.6]], 88003 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 157471
 
|-
 
|-
|'''15.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 89587   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 191195
+
|'''15.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 89633   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 191344
 
|-
 
|-
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 91598 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 197227
+
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 91625 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 197405
 
|-
 
|-
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 94805   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 214427
+
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 94913   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 214572
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 104681 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 225598
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 104776 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 225903
 
|-
 
|-
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 122331 ||'''1.''' EPG Main Page, 1280983
+
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 122438 ||'''1.''' EPG Main Page, 1283025
 
|}
 
|}
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[616.18 Construction Inspection Guidelines for Sec 616#Relocation of Service Signs (Logo Signs) on Construction Projects|Relocation of Service Signs (Logo Signs) on Construction Projects]]'''
 +
 +
10/11/13: Guidance in line with existing practice on how to perform temporary or permanent relocation of Logo signs has been added  to EPG 616.18 Construction Inspection Guidelines.  This guidance is especially helpful to REs and designers.
 +
 +
'''[[751.22 P/S Concrete I Girders#751.22.3.8 Camber, Haunching and Girder Steps|EPG 751.22.3.8 Camber, Haunching and Girder Steps]]'''
 +
 +
10/11/13: Limits for prestressed girder haunching will now be reported to the nearest 1/8”.
 +
 +
'''New QRG'''
 +
 +
10/11/13: A new QRG, [[media:Equipment Verification Samples.docx|Equipment Verification Samples]], is now available.
 +
 
'''[[616.13 Work Zone Capacity, Queue and Travel Delay#616.13.2 Interstate, Freeways and Multi-lane Roadways|Work Zone Capacity, Queue and Travel Delay for Interstates, Freeways and Multi-lane Roadways]]'''
 
'''[[616.13 Work Zone Capacity, Queue and Travel Delay#616.13.2 Interstate, Freeways and Multi-lane Roadways|Work Zone Capacity, Queue and Travel Delay for Interstates, Freeways and Multi-lane Roadways]]'''
  
Line 102: Line 112:
 
10/1/13: EPG 906 TEAP has been moved to EPG 136.3.8.10 TEAP. The modified EPG language reflects Design Division timelines and processes. One of the main process changes is that the TEAP studies will be provided through on-call consultants. (Local agencies will select a consultant from an approved list of on-call consultants to complete a TEAP study for them.) The TEAP application has also been completely revised to resemble other DE or LPA standard applications. In FY 2014, the Traffic & Highway Safety Division and the Local Programs group will partner to administer TEAP.  The TEAP processes and timelines will remain the same. In FY 2015, the administration of TEAP will be through the Local Programs group.     
 
10/1/13: EPG 906 TEAP has been moved to EPG 136.3.8.10 TEAP. The modified EPG language reflects Design Division timelines and processes. One of the main process changes is that the TEAP studies will be provided through on-call consultants. (Local agencies will select a consultant from an approved list of on-call consultants to complete a TEAP study for them.) The TEAP application has also been completely revised to resemble other DE or LPA standard applications. In FY 2014, the Traffic & Highway Safety Division and the Local Programs group will partner to administer TEAP.  The TEAP processes and timelines will remain the same. In FY 2015, the administration of TEAP will be through the Local Programs group.     
  
'''[[751.22 P/S Concrete I Girders#Example|EPG 751.22.3.8 Camber, Haunching and Girder Steps]]'''
+
'''[[751.22 P/S Concrete I Girders#Sample detail|EPG 751.22.3.8 Camber, Haunching and Girder Steps]]'''
  
 
10/1/13:  A note was added to clarify the camber diagram.
 
10/1/13:  A note was added to clarify the camber diagram.
Line 169: Line 179:
  
 
8/26/13: [[:Category:138 Project Development Chronology#Our maps are a record of the many groundbreakings|EPG 138 Project Development Chronology]] now presents the new roadmap of Missouri, ([http://www.modot.org/missourimap/documents/PDF_Mo_Mapfront2013.pdf front] and [http://www.modot.org/missourimap/documents/PDF_Mo_Mapback13.pdf back]).
 
8/26/13: [[:Category:138 Project Development Chronology#Our maps are a record of the many groundbreakings|EPG 138 Project Development Chronology]] now presents the new roadmap of Missouri, ([http://www.modot.org/missourimap/documents/PDF_Mo_Mapfront2013.pdf front] and [http://www.modot.org/missourimap/documents/PDF_Mo_Mapback13.pdf back]).
 
'''[[:Category:501 Concrete#The following procedures for calibration|EPG 501.1.8 Air-Entrained Concrete]]'''
 
 
8/9/13:  Guidance was added stating that the district shall provide aggregate correction factors to the Central Laboratory when coarse aggregate samples are submitted for AASHTO T161 testing. 
 
 
'''[[:Category:109 Measurement and Payment#The following table provides|EPG 109.14 Price Adjustment for Fuel]]'''
 
 
8/6/13: Concrete approach pavement has been added to the list of eligible fuel adjustment items in the table.
 
 
'''[[:Category:134 Engineering Professional Services#Master Agreement Execution Process|EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts]]'''
 
 
8/6/13: A reminder to PMs was added that they must wait on FHWA obligation before issuing a NTP to consultants when a contract uses federal funds.
 

Revision as of 13:40, 11 October 2013

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available
WELCOME
RECENT POLICY CHANGES IN THE EPG
Motorist Assistance Operator Rocky Balfour prepares to...well, assist a motorist on I-35.
Work on the new I-70 Mississippi River Brige continues with painting, barrier work and, as shown above, an overlay.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

The demolition of the main span of the old Amelia Earhart Memorial Bridge.
Main Page Oct 10, 2013 1.jpg
Above, the charges ignite on the old bridge. (A railroad bridge can be seen in front of the old bridge and the new span can be seen behind the old bridge.) Below, the center span falls.
Main Page Oct 10, 2013 2.jpg
Below left, the contractor used drones to check the blast's results. Below right, a barge with a large crane moved in after the "all clear" was given and began the process of removing the pieces of the old bridge from the navigable channel.
Main Page Oct 10, 2013 3.jpg
Main Page Oct 10, 2013 4.jpg
Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-October, the numbers of hits are:
20. EPG 134, 82955 10. EPG 136.12, 122844
19. EPG 751.5, 83946 9. EPG 101, 125527
18. EPG 136.4, 85834 8. EPG 200, 126747
17. EPG 136.9, 86976 7. EPG 616.23, 146908
16. EPG 903.6, 88003 6. EPG 600, 157471
15. EPG 400, 89633 5. EPG 100, 191344
14. EPG 751.40, 91625 4. EPG 700, 197405
13. EPG 620.2, 94913 3. EPG 900, 214572
12. EPG 903, 104776 2. EPG 751, 225903
11. EPG 616, 122438 1. EPG Main Page, 1283025

Relocation of Service Signs (Logo Signs) on Construction Projects

10/11/13: Guidance in line with existing practice on how to perform temporary or permanent relocation of Logo signs has been added to EPG 616.18 Construction Inspection Guidelines. This guidance is especially helpful to REs and designers.

EPG 751.22.3.8 Camber, Haunching and Girder Steps

10/11/13: Limits for prestressed girder haunching will now be reported to the nearest 1/8”.

New QRG

10/11/13: A new QRG, Equipment Verification Samples, is now available.

Work Zone Capacity, Queue and Travel Delay for Interstates, Freeways and Multi-lane Roadways

10/10/13: The Work Zone Impact Analysis Spreadsheet Directions form was updated with guidance describing Equivalent Trucks. A synopsis sheet was also added.

New Test Method

10/8/13: EPG 106.3.2.64 TM-64, Void Detection and Undersealing Verification Testing of Concrete Pavement with a Falling Weight Deflectometer is now available. The previous TM-64 was deleted in 2012.

Increased Access to Safety Policies Safety begins with me.jpg

10/4/13: For greater convenience, the listing of safety-related policies has been expanded.

EPG 146.2 DBE Subcontract

10/4/13: A new form, Guidance for Completing the CUF Form, was added.

EPG 136.3.8.10 Traffic Engineering Assistance Program (TEAP)

10/1/13: EPG 906 TEAP has been moved to EPG 136.3.8.10 TEAP. The modified EPG language reflects Design Division timelines and processes. One of the main process changes is that the TEAP studies will be provided through on-call consultants. (Local agencies will select a consultant from an approved list of on-call consultants to complete a TEAP study for them.) The TEAP application has also been completely revised to resemble other DE or LPA standard applications. In FY 2014, the Traffic & Highway Safety Division and the Local Programs group will partner to administer TEAP. The TEAP processes and timelines will remain the same. In FY 2015, the administration of TEAP will be through the Local Programs group.

EPG 751.22.3.8 Camber, Haunching and Girder Steps

10/1/13: A note was added to clarify the camber diagram.

EPG 907.6 Fatal Crash Reviews

9/27/13: Guidance was clarified about which conditions require fatal crash reviews.

Submitting a Bridge Survey Report

9/25/13: In EPG 748.7.3.12 Submission, the guidance was clarified about what files need to be submitted.

EPG 110.3 Rate of Pay

9/24/13: New guidance has been provided to clarify how contractors must submit documentation for the wages of apprentices. The new guidance is #7c.

Documentation of Traffic Control Devices Installations

9/20/13: Guidance in EPG 616.18 Construction Requirements was expanded to clarify how to produce documentation so as to avoid the possibility of paying for a device more than once.

Daily Work Reports

9/20/13: Guidance for diary notations about accounting on contractor equipment and personnel has been clarified and slightly expanded.

Annual Report for Automated Enforcement of Red-Light Violations

9/20/13: In EPG 950.1.1, the above form was added for reporting violations.

EPG 236.3 Administration

9/19/13: Numerous minor updates have been made to this Right of Way article. For instance, the archaic guidance of EPG 236.3.4.13's Central Office Review and Approval was removed. Two forms, Right of Way Cost Estimate Worksheet and Right of Way Cost Estimate, were also updated.

EPG 127.13.10 Noise Wall Public Meeting and Voting

9/17/13: Guidance has been added to clarify current practice.

EPG Other Aspects of Pavement Design

9/11/13: "Pavement Design for Scoping" was removed from this article it presented a set of ME tables that are now outdated. The MEPDG design tables will eventually be replaced but conflict with industry at this time.

EPG 237.9.6.8 Consultant Designed Projects

9/9/13: Consultants need to include the Certificate of Authority number in the title block.

Contract Leveling Course Guidelines Job Special Provisions

9/9/13: The CLC JSPs in EPG 402 Bituminous Surface Leveling were updated. The quality control and RAP and RAS JSPs were modified and the tack coat JSP was removed.

Forms in EPG 236.7 Negotiation

9/6/13: Several forms (Offer Letter - Combined Fee and Tenant Owners - Use Prior to Condemnation (Form 7.2.5D), Offer Letter - Fee Owner (Form 7.2.5A), Offer Letter - Tenant Owner No Disclaimer (Form 7.2.5B2) and Offer Letter - Tenant Owner with Disclaimer (Form 7.2.5B1)) were updated due to a request from FHWA.

EPG 321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation

9/5/13: This article has been generally expanded and updated to match current and established practices.

Required Notices and Posters

9/5/13: The latest version of several required posters and notices (including the jobsite poster checklist and the OSHA, the MCHR-07, the Workers Compensation and the Unemployment Benefits posters) are now available at EPG 110.2 Federal-Aid Projects.

EPG 234.1 Access to Interstate Highways

8/27/13: Guidance has been updated because, due to a FHWA agreement, Access Justification Report approvals are now allowed in two steps.

Missouri Highway Map Centennial Edition 138 2013 map.jpg

8/26/13: EPG 138 Project Development Chronology now presents the new roadmap of Missouri, (front and back).