Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 751.50)
m (QRG)
Line 18: Line 18:
 
|colspan="3" align="center"| '''<Big><font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayreadme.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available '''</i></font color="white">
 
|colspan="3" align="center"| '''<Big><font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayreadme.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available '''</i></font color="white">
 
|}
 
|}
 +
 +
  
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
Line 28: Line 30:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2"|  [[image:Main Page Mar 21, 2014.jpg|center|390px|thumb|<center>'''  A panoramic view of the [http://www.modot.org/stlouis/major_projects/newdanielboonebridge.htm new eastbound Daniel Boone Bridge] across the Missouri River, with the 1980s era bridge next to it.   '''  </center>]]
+
|colspan="2"|  [[image:Main Page Mar 25, 2014.jpg|center|390px|thumb|<center>'''  Transportation crews will begin putting fresh stripes on major mid-Missouri routes. MoDOT crews will work 10 hours a day, Monday through Saturday, for the next few months to lay down the yellow and white stripes. Striping operations are mobile work zones, often moving at 10 to 12 mph.   '''  </center>]]
 
|-
 
|-
|colspan="2"|  [[image:Main Page Mar 11, 2014.jpg|center|390px|thumb|<center>'''  Maintc. Worker Rafael Mayhew [http://www.kmbc.com/news/modot-launching-pothole-patrol/24895922 conducts pothole repair] on a Rte. 291 outer road by filling the hole with cold mix. More permanent repairs could be made this summer.  '''  </center>]]
+
|colspan="2"|  [[image:Main Page Mar 21, 2014.jpg|center|390px|thumb|<center>'''  A panoramic view of the [http://www.modot.org/stlouis/major_projects/newdanielboonebridge.htm new eastbound Daniel Boone Bridge] across the Missouri River, with the 1980s era bridge next to it.  '''  </center>]]
 
|-
 
|-
|colspan="2"|  [[image:123.1 Interstate history.jpg|right|425px|thumb|<center>'''As MoDOT says goodbye to its [http://www.modot.org/anniversary/ centennial year], we look back at many proud accomplishments. One of the biggest was from 1956:  Six involved in one of the nation's first interstate projects pose in St. Charles at the I-70 project site. (L to R) Dan Cane, superintendent, Cameron, Joyce & Co.; Chick Sayles, salesman, Alpha Portland Cement; John Latham, Distr. 6 engineer; Charles Tevis, Distr. 6 Assist. Chief Engr.; and Jack and Tinch Gammon, brothers who owned Cameron, Joyce & Co., the project's contractor.  '''  </center>]]
+
|colspan="2"|  [[image:Main Page Mar 11, 2014.jpg|center|390px|thumb|<center>'''   Maintc. Worker Rafael Mayhew [http://www.kmbc.com/news/modot-launching-pothole-patrol/24895922 conducts pothole repair] on a Rte. 291 outer road by filling the hole with cold mix. More permanent repairs could be made this summer.  '''  </center>]]
 
|}
 
|}
  
Line 43: Line 45:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
| colspan="2"|  [[image:Main Page Mar 7, 2014.jpg|center|390px|thumb|<center>'''   [http://www.modot.org/newsandinfo/District0News.shtml?action=displaySSI&newsId=193633 Maintc. Worker Micah Lasley was honored by the Commission with a Meritorious Safety Award], the highest safety award presented by MoDOT and the Commission. While plowing snow in February, Lasley heroically went inside a burning home to carry a Calwood woman to safety. (L to R) Commissioner Ken Suelthaus, Maintc. Worker Micah Lasley, Commissioner Gregg Smith, Commission Chairman Stephen Miller and Commissioner Lloyd J. Carmichael.  '''  </center>]]
+
| colspan="2"|  [[image:123.1 Interstate history.jpg|right|425px|thumb|<center>'''As MoDOT says goodbye to its [http://www.modot.org/anniversary/ centennial year], we look back at many proud accomplishments.  One of the biggest was from 1956:  Six involved in one of the nation's first interstate projects pose in St. Charles at the I-70 project site. (L to R) Dan Cane, superintendent, Cameron, Joyce & Co.; Chick Sayles, salesman, Alpha Portland Cement; John Latham, Distr. 6 engineer; Charles Tevis, Distr. 6 Assist. Chief Engr.; and Jack and Tinch Gammon, brothers who owned Cameron, Joyce & Co., the project's contractor.  '''  </center>]]
 
|}
 
|}
  
Line 50: Line 52:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late March, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late March, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[751.5 Standard Details|EPG 751.5]], 91030 ||'''10.''' [[:Category:200 GEOMETRICS|EPG 200]], 135032
+
|'''20.'''  [[751.5 Standard Details|EPG 751.5]], 91186 ||'''10.''' [[:Category:200 GEOMETRICS|EPG 200]], 135382
 
|-
 
|-
|'''19.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 94422   ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 152010
+
|'''19.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 94630   ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 152600
 
|-
 
|-
|'''18.'''   [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 94762  ||'''8.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 152059
+
|'''18.'''   [[903.6 Warning Signs|EPG 903.6]], 94956  ||'''8.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 153038
 
|-
 
|-
|'''17.'''   [[903.6 Warning Signs|EPG 903.6]], 94806  ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 164168
+
|'''17.'''   [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 95655    ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 164476
 
|-
 
|-
|'''16.'''   [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 96843    ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 167933
+
|'''16.'''     [[:Category:134 Engineering Professional Services|EPG 134]], 97321  ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 168189
 
|-
 
|-
|'''15.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 97212  ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 204653
+
|'''15.'''  [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 97455  ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 205108
 
|-
 
|-
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 101035 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 213004
+
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 101110 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 213447
 
|-
 
|-
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 103300   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 230725
+
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 103500   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 231240
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 115004 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 251326
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 115195 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 251794
 
|-
 
|-
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 134903 ||'''1.''' EPG Main Page, 1481174
+
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 135104 ||'''1.''' EPG Main Page, 1485598
 
|}
 
|}
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''New QRG'''
 +
 +
3/25/14: QRG [[media:Emergency Contacts.docx|Emergency Contacts]] guides users on how to enter direct contact and after-hour emergency phone numbers for both the contractor and project office personnel for all active contracts.
 +
 
'''[[751.50 Standard Detailing Notes#H2c4. Additional Prestressed Concrete Box Beam Notes|EPG 751.50 H2c4. Additional Prestressed Concrete Box Beam Notes]]'''
 
'''[[751.50 Standard Detailing Notes#H2c4. Additional Prestressed Concrete Box Beam Notes|EPG 751.50 H2c4. Additional Prestressed Concrete Box Beam Notes]]'''
  
Line 168: Line 174:
  
 
1/24/14:  Bridge Memo guidance has been expanded and clarified in both [[751.1 Preliminary Design#751.1.2.17 Bridge Memorandums|EPG 751.1.2.17 Bridge Memorandums]] and [[751.1 Preliminary Design#751.1.3.1 Overview|EPG 751.1.3.1 Overview]].
 
1/24/14:  Bridge Memo guidance has been expanded and clarified in both [[751.1 Preliminary Design#751.1.2.17 Bridge Memorandums|EPG 751.1.2.17 Bridge Memorandums]] and [[751.1 Preliminary Design#751.1.3.1 Overview|EPG 751.1.3.1 Overview]].
 
'''[[media:concrete mix design creation 2014.doc|Concrete Mix Design Creation]] QRG'''
 
 
1/22/14: This [[:Category:101 Standard Forms#Quick Reference Guides (QRGs)|QRG]] was updated to reflect previous spec and organization changes.
 

Revision as of 08:14, 25 March 2014

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available


WELCOME
RECENT POLICY CHANGES IN THE EPG
Transportation crews will begin putting fresh stripes on major mid-Missouri routes. MoDOT crews will work 10 hours a day, Monday through Saturday, for the next few months to lay down the yellow and white stripes. Striping operations are mobile work zones, often moving at 10 to 12 mph.
A panoramic view of the new eastbound Daniel Boone Bridge across the Missouri River, with the 1980s era bridge next to it.
Maintc. Worker Rafael Mayhew conducts pothole repair on a Rte. 291 outer road by filling the hole with cold mix. More permanent repairs could be made this summer.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

As MoDOT says goodbye to its centennial year, we look back at many proud accomplishments. One of the biggest was from 1956: Six involved in one of the nation's first interstate projects pose in St. Charles at the I-70 project site. (L to R) Dan Cane, superintendent, Cameron, Joyce & Co.; Chick Sayles, salesman, Alpha Portland Cement; John Latham, Distr. 6 engineer; Charles Tevis, Distr. 6 Assist. Chief Engr.; and Jack and Tinch Gammon, brothers who owned Cameron, Joyce & Co., the project's contractor.
Perhaps you've wondered how many hits the most popular EPG articles have. As of late March, the numbers of hits are:
20. EPG 751.5, 91186 10. EPG 200, 135382
19. EPG 400, 94630 9. EPG 101, 152600
18. EPG 903.6, 94956 8. EPG 136.12, 153038
17. EPG 136.9, 95655 7. EPG 616.23, 164476
16. EPG 134, 97321 6. EPG 600, 168189
15. EPG 136.4, 97455 5. EPG 100, 205108
14. EPG 751.40, 101110 4. EPG 700, 213447
13. EPG 620.2, 103500 3. EPG 900, 231240
12. EPG 903, 115195 2. EPG 751, 251794
11. EPG 616, 135104 1. EPG Main Page, 1485598

New QRG

3/25/14: QRG Emergency Contacts guides users on how to enter direct contact and after-hour emergency phone numbers for both the contractor and project office personnel for all active contracts.

EPG 751.50 H2c4. Additional Prestressed Concrete Box Beam Notes

3/21/14: Notes have been added to the new EPG 751.50 H2c4 since Bridge Div. is incorporating prestressed concrete spread box beam details into the Bridge Standard Drawings.

EPG 134.5.2 Supplemental Agreements

3/21/14: It is no longer required to send an electronic copy of a supplemental agreement to the Audits Division.

EPG 110.2 Required Notices and Posters

3/20/14: Guidance about the display of notices and posters has been clarified.

EPG 236.3.5.2 Expenditure Accounting

3/5/14: The Payroll Cover Letter is no longer needed in the right of way expenditure accounting process. Also, this subarticle has been updated to reflect newer electronic accounting methods.

EPG 1080.1 High Strength Bolts

3/4/14: The requirements for nuts, bolts, and washers have been consolidated into EPG 1080.1. PAL sample sizes have been revised to 6 pieces (nuts, bolts or washers). AASHTO M298 has also been replaced with references to ASTM B695, the equivalent ASTM spec.

Bridge Standard Detailing Notes

3/4/14: Revisions to A1 standard notes include adjusting the design unit stresses of piles since typically contractors have a choice in grade of steel. G5 standard notes were clarified to show that closure plates are required and are included in the price of the pile. In the G6 standard notes, pile grade was added to the list of items to be included in the remarks column.

Updated QRGs

2/27/14: Change Orders was updated to clarify instruction for adding contingency items due to JSP or spec changes. Change Orders – Mobilization and Contract Bond was also updated to address how to handle mobilization and contract bond for contracts with multiple projects. 

EPG 616.27 Fleet Lighting

2/27/14: Current fleet lighting and aerial equipment lighting guidelines are now available in this new article.

EPG 751.6.1 Index of Quantities

2/26/14: New guidance is now available to clarify accuracy and rounding of estimated quantities.

Engineering Professional Services Contract Distribution

2/25/14: It is no longer required to send executed contracts to the Audits and Investigation Division.

Invoicing of Engineering Professional Services

2/24/14: EPG 134.5.1 Invoicing guidance was expanded.

Two-tube Rail

2/21/14: New guidance has been provided for two-tube bridge rail. This type of bridge rail was used in the Safe and Sound bridge program and is now available for regular use.

EPG 131.1 Design Exception Process

2/19/14: This article was generally rewritten to improve the review and approval process as well as clarify roles and responsibilities by obtaining concurrence during the early stage of the process.

Edgeline Rumble Strips

2/19/14: EPG 626.1 was revised to offer new options for urban areas: to offset the rumble strips and to limit their use.

Mandatory Reasonableness Factors for Sound Walls

2/19/14: EPG 127.13.9 was revised to reflect that the warrant for the inclusion of sound walls on a project will now use an area (sq. ft.) threshold. This area remains static regardless of market conditions.

Two New Consultant Contract Checklists

2/18/14: The Fig. 134.2.2 Processing Standard Consultant Contracts Checklist and Fig. 134.2.4 Processing On-Call/MOU Consultant Contracts Checklist are now available in EPG 134 Engineering Professional Services.

EPG 751.12 Protective Barriers

2/10/14: This article, previously EPG 751.12 Protective Barricades, was retitled to more accurately reflect its subject.

New QRG

2/4/14: Moving Files from SharePoint to CIA details how the project office is to move quality management documentation from the external SharePoint to the appropriate folder on V:\Contract Information Archive.

Subcontracts QRG

1/31/14: This QRG has been clarified.

EPG 127.13.9 Reasonableness

1/30/14: Mandatory Reasonableness Factor #3 was clarified to state that "Noise abatement measures must provide...a minimum of 7 dBA for 67 percent of benefitted first-row receptors."

EPG 751.10 General Superstructure

1/29/14: In order to provide a taller joint filler on various P/S girders to reduce costly girder steps: P/C P/S panel deck cantilever reinforcement details was added in EPG 751.10.1.7.2; Deck joint guidance was expanded in EPG 751.10.1.12; and joint filler dimensions were revised in EPG 751.10.2.1.

Standard Detailing Note C2a.3

1/29/14: This note was revised so that "to the nearest inch" is now underlined.

EPG 134.4 Contract Approval, Execution and Distribution

1/27/14: A note was added to remind project managers and contract administrators to get funds obligated prior to issuing a Notice to Proceed.

Bridge Memorandums

1/24/14: Bridge Memo guidance has been expanded and clarified in both EPG 751.1.2.17 Bridge Memorandums and EPG 751.1.3.1 Overview.