Main Page

From Engineering_Policy_Guide
Revision as of 12:35, 11 July 2013 by Smithk (talk | contribs) (EPG 751.11 and EPG 751.22)
Jump to navigation Jump to search
EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available
WELCOME
RECENT POLICY CHANGES IN THE EPG
Sr. Construction Inspector Chris Mills aims an infrared gun to ensure asphalt is being laid at the correct temperature. The Rte. 14/Bus. 65 project will add lanes and a traffic signal in downtown Ozark.
The second phase of the Rte. W/Lexington Ave./Kingwsay Dr. roundabout project in Cape Girardeau will begin later this month, weather permitting. Fronabarger Concreters, Inc. will construct the interior section of the roundabout.
Six days a week, crews from Fred Weber Inc., Millstone Bangert Inc. and Kolb Grading, forming the joint venture Page Constructors LLC, construct the new Rte. 364 Page Ave. Phase 3. Excavation and grading is underway at Gutermuth Rd. in Cottleville.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Millstone Bangert, Inc. employees work on the northeast corner of the I-70/Mid Rivers Mall Dr. Diverging Diamond Interchange. The project will also construct an additional westbound I-70 lane between Mid Rivers Mall Dr. and Rte. 79.
Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-July, the numbers of hits are:
20. EPG 134, 74156 10. EPG 101, 115163
19. EPG 903.5, 78519 9. EPG 616, 115496
18. EPG 751.5, 80452 8. EPG 200, 121615
17. EPG 136.9, 80696 7. EPG 616.23, 138041
16. EPG 903.6, 83428 6. EPG 600, 149913
15. EPG 400, 85668 5. EPG 100, 183016
14. EPG 751.40, 87698 4. EPG 700, 188246
13. EPG 620.2, 88652 3. EPG 900, 206643
12. EPG 903, 97761 2. EPG 751, 211031
11. EPG 136.12, 98093 1. EPG Main Page, 1164600

Elastomeric Bearings

7/11/13: In EPG 751.11.1.1 and EPG 751.11.2.1, guidance was clarified on the usage of plain and laminated bearing pads. Bearing pad length requirements for P/S NU girders and P/S Spread Box Beams were added. Also, figures in EPG 751.22.1.4 Span and Structure Lengths were updated to reflect the clarification.

Cessation of Pre-negotiation and Hourly Rate Reviews

7/11/13: Revisions in EPG 134.3 Consultant Contract Negotiation result from Audits and Investigations ceasing the pre-negotiation reviews and shifting the reviews to project managers and/or contract administrators. Fig. 134.3.1, District Checklist for Reviewing Executed Consultant Contracts, was also added to provide additional help.

Bridge Slabs

7/10/13: Guidance was expanded in EPG 751.6.2.10 Bridge Slabs and the related Standard Detailing Note B3.22 was also updated.

2014-2018 STIP

7/10/13: The link to the latest STIP is available in several articles, including EPG 121.3 The Statewide Transportation Improvement Program (STIP).

Right of Way Negotiation Guidelines and Procedures

7/8/13: When acquiring realty rights, a minimum offer has been established in EPG 236.7.2.3 Prompt Offer of Just Compensation.

EPG 134.3.6 Subconsultants

7/8/13: If a subconsultant is not pre-qualified with MoDOT, the firm shall now include their Consultant Certification of Indirect Cost Form instead of the MRC Form.

Contract Leveling Course

7/8/13: The Contract Leveling Course (CLC) Guidelines and JSPs have been updated in EPG 402 Bituminous Surface Leveling. Also, the CLC Template examples have been expanded to four scenarios involving the use of pilot cars.

EPG 751.50 A1 Notes

7/5/13: The Design Specifications, Loadings & Unit Stresses general notes have been updated to reflect new AASHTO interim dates. Some other notes have also been reorganized.

EPG 616.19 Quality Standards for Temporary Traffic Control Devices

7/1/13: This article has been expanded to provide superior guidance.

Bridge Engineering Assistance Program (BEAP)

6/25/13: EPG 754 Bridge Engineering Assistance Program (BEAP) has been moved to EPG 136.3.8.9 Bridge Engineering Assistance Program (BEAP). The content of the article was only slightly modified.

EPG 616.6.87 Temporary Rumble Strips

6/25/13: New guidance provides examples of when temporary rumble strips may be used.

Traffic Signal Signs

6/18/13: Additional guidance has been provided about the left turn signal remaining in place until the circular red indication is replaced with a red left arrow and the LEFT TURN YIELD ON GREEN sign being maintained until being converted to the flashing yellow arrow indicator.

EPG 616.6.87 Temporary Rumble Strips

6/17/13: Guidance is now available for both long term and short term rumble strips on construction projects.

EPG 237.9 Submission of Plans and Supporting Documents

6/17/13: This article has been generally clarified and updated to reflect current practices.

EPG 236.3.7.5 Distribution of Clearance Certification

6/14/13: This article has been updated to show the current RW email procedure.

Shall, Will, Should and May

6/13/13: The definitions for these terms have been slightly modified for greater consistency.

Contract Leveling Course Projects

6/12/13: The tacking rate was adjusted to a minimum of 0.08 gal/yd2 to be consistent with other standards. Maintenance operation guidance about pavement markings and eliminating pavement edge drop-offs was also clarified.

Pile Driving Set Calculator

6/12/13: In EPG 702.1.4.1 Pile Formula, the pile driving set calculator was updated by removing the hammer efficiency from the calculations. The spreadsheet formula is used to calculate the pile set to help determine when to stop driving pile.

Work Zone Traffic Control, Pilot Cars and Law Enforcement Services

6/11/13: In EPG 616.3.10, EPG 616.3.13, EPG 616.16 and EPG 616.18, additional guidance was provided about signing for side roads when a pilot car is being used in a one-lane two-way operation, the use of bump signs in work zones and the expectations and type of law enforcement used in work zones.

Table 903.7.51 Approved Missouri Scenic Byways

6/10/13: The table of approved Mo Scenic Byways has been updated with the addition of three new byways.

New Sponsor-A-Highway Signs

6/6/13: The latest version of this sign is now available for viewing.

Addressing Prevailing Wages and Subcontracts for Professional Services

6/4/13: Guidance about how to administer contract work performed by "Professional Services" was clarified in both EPG 108.1 Subletting of Contract and EPG 110.3 Prevailing Wages and Records.

EPG 751.6.2 Computation of Estimated Quantities

5/16/13: Guidance for computing slab quantity for bridge plans has been added. Guidance for non-destructive testing to require checking only welds of terminal sections of cover plates in tension areas was amended.

Redefining Equations' Variable

5/16/13: The variable, ts, has been redefined to stand for the thickness of the full depth concrete slab in equations in both EPG 751.2.4.1 Live Load Moment Distribution and EPG 751.2.4.3 Live Load Shear Distribution.

Workforce Diversity Requirements

5/15/13: Minor clarifications about workforce diversity verification have been made to both EPG 134.1.7 Workforce Diversity and EPG 134.5.1.1 Workforce Diversity Verification.