User contributions
Jump to navigation
Jump to search
- 11:27, 27 March 2018 diff hist 0 N File:409 FY 2019 Seal Coat MoDOT.pdf current
- 11:26, 27 March 2018 diff hist 0 N File:409 FY 2019 Seal Coat Contractor.pdf current
- 11:26, 27 March 2018 diff hist +16 m Category:409 Seal Coat Per DE, the CLC and JSP packages were updated
- 11:23, 27 March 2018 diff hist 0 N File:402 CLC MoDOT 2018.pdf current
- 11:22, 27 March 2018 diff hist 0 N File:402 CLC Contractor 2018.pdf current
- 11:21, 27 March 2018 diff hist 0 N File:402 FY2019 Contract Leveling Coat Guidelines.docx current
- 11:19, 27 March 2018 diff hist +36 m Category:402 Bituminous Surface Leveling Per DE, the CLC and JSP packages were updated
- 08:41, 27 March 2018 diff hist +107 m 751.2 Loads →751.2.2 Transient Loads: Per BR, Wind Pressure on Vehicles, Braking force, and Centrifugal force are assumed to act horizontally at the roadway surface, per AASHTO agenda 2005
- 15:00, 26 March 2018 diff hist 0 N File:127.1 Instructions.doc
- 15:00, 26 March 2018 diff hist +3 m 127.1 Request for Environmental Services
- 14:59, 26 March 2018 diff hist -56 m 127.1 Request for Environmental Services Per Env'l, updated How to Complete the Request for Env'l Services (formerly "Instructions for the RES Form")
- 14:47, 26 March 2018 diff hist -1 LPA:136.13 LPA Policy Changes
- 14:46, 26 March 2018 diff hist +131 m LPA:136.13 LPA Policy Changes Fig. 136.6.4
- 14:45, 26 March 2018 diff hist +122 m LPA:136.12 Figures, Glossary and Other Useful Links Per Env'l, updated Fig. 136.6.4 How to Complete the Request for Env'l Review
- 14:42, 26 March 2018 diff hist 0 N File:136.6.4 instructions 2018.doc
- 14:42, 26 March 2018 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.4 How to Complete the Request for Env'l Review
- 12:56, 23 March 2018 diff hist 0 N File:823 Incarcerated Manual.pdf current
- 12:55, 23 March 2018 diff hist -96 m Category:823 Incarcerated Personnel Work Release Program Per MT, updated link to Incarcerated Personnel Work Release Program Manual current
- 12:08, 23 March 2018 diff hist 0 m 320.4 Procedure for Final Sounding Per BR, updated Soil Properties Request Form
- 12:06, 23 March 2018 diff hist 0 m 320.3 Drilling Operations Per BR, updated Soil Properties Request Form
- 12:05, 23 March 2018 diff hist +5 m Category:101 Standard Forms →Bridge
- 12:04, 23 March 2018 diff hist -10 m Category:101 Standard Forms →Bridge: Per BR, updated Soil Properties Request Form
- 11:32, 23 March 2018 diff hist 0 N File:751.1.2.20 Request 2018.xlsx current
- 11:32, 23 March 2018 diff hist -10 m 751.1 Preliminary Design Per BR, updated Soil Properties Request Form
- 15:04, 22 March 2018 diff hist +15 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated link
- 11:33, 22 March 2018 diff hist +47 m Category:121 Project Planning, Prioritization and STIP Commitments
- 11:06, 22 March 2018 diff hist 0 N File:121 Planning Framework.docx current
- 11:05, 22 March 2018 diff hist +261 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, added document, "The Planning Framework for Transportation Decision Making"
- 09:08, 21 March 2018 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Mar 2018.xlsx
- 09:08, 21 March 2018 diff hist +8 m 606.1 Guardrail Two minor revisions to the Guardrail Length of Need Calculator
- 15:16, 20 March 2018 diff hist +5 m Category:756 Seismic Design
- 15:12, 20 March 2018 diff hist -92 m Category:756 Seismic Design Per BR, clarified seismic information.
- 15:06, 20 March 2018 diff hist 0 N File:756 LRFD flowchart.pdf
- 14:52, 20 March 2018 diff hist +304 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, clarified seismic information.
- 14:47, 20 March 2018 diff hist +1,990 m 751.1 Preliminary Design Per BR, clarified seismic information.
- 11:17, 20 March 2018 diff hist +213 m 751.5 Structural Detailing Guidelines →751.5.9.2.2 Epoxy Coated Reinforcement Requirements: Per BR, clarified Feb 2017 policy expanding the use of epoxy coated reinforcement in bridge structures
- 10:53, 20 March 2018 diff hist +40 m Main Page EPG 103.1.6.6.1.2
- 10:50, 20 March 2018 diff hist +638 m 103.1 Bid Opening and Award Process →103.1.6.6.1.2 File Naming Convention for Plan Sheet Changes: Per Bidding and Contracts, updated guidance for ProjectWise
- 10:17, 16 March 2018 diff hist -13 m Main Page EPG 237.14
- 09:57, 16 March 2018 diff hist 0 N File:237.14.2.8.jpg current
- 09:57, 16 March 2018 diff hist +30,027 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, article completely rewritten
- 09:36, 16 March 2018 diff hist +1,087 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.3 Electronic Deliverables File: "Electronic Deliverables" used to be some of the files to be included. Now each file is named and collected in a ZIP file called "Electronic Deliverables"
- 13:47, 14 March 2018 diff hist +33 m 236.3 Administration Per RW, in EPG 236.3.5.2, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:39, 14 March 2018 diff hist -1 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation
- 13:39, 14 March 2018 diff hist +34 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation: Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:21, 14 March 2018 diff hist -9 m 238.2 Land Surveying Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 12:45, 14 March 2018 diff hist -30 m Category:Safe and Sound →Schedule: updated PS&E Due Date chart link
- 12:42, 14 March 2018 diff hist -44 m 237.9 Submission of Plans and Supporting Documents updated PS&E Due Date chart link
- 12:40, 14 March 2018 diff hist -42 m 103.1 Bid Opening and Award Process updated PS&E Due Date chart link
- 11:44, 9 March 2018 diff hist -62 m Main Page EPG 751.1.2.21
- 11:42, 9 March 2018 diff hist +410 m 751.1 Preliminary Design →751.1.2.21 Substructure Type: Per BR, min galvanized penetration guidance added for retaining wall piles supported on piles & bridge end bents on piles with embankments supported by MSE walls
- 16:12, 8 March 2018 diff hist 0 m 127.16 Wetland and Stream Mitigation
- 15:54, 8 March 2018 diff hist +125 m Main Page
- 15:32, 8 March 2018 diff hist -10 m Category:101 Standard Forms →Utility or Right of Way Related: Updated link to Permit for Work on Right of Way
- 14:52, 8 March 2018 diff hist +3 m Main Page
- 13:58, 8 March 2018 diff hist -6 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines
- 13:46, 8 March 2018 diff hist -103 m Category:101 Standard Forms Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 13:45, 8 March 2018 diff hist -110 m Category:110 State and Federal Wage Rates and Other Requirements Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 12:39, 8 March 2018 diff hist +51 m Main Page EPG 612, EPG 616.8
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35d MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35c MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35b MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35a MT 2018.pdf current
- 12:09, 8 March 2018 diff hist 0 N File:616.8.35 MT 2018.pdf current
- 12:09, 8 March 2018 diff hist +25 m 616.8 Typical Applications (MUTCD 6H) Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use. TA 35 MT and TAs 35a-d MT
- 11:49, 8 March 2018 diff hist +228 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines: Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use.
- 16:27, 7 March 2018 diff hist -70 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 16:22, 7 March 2018 diff hist +49 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 16:14, 7 March 2018 diff hist +198 m 751.12 Barriers, Railings, Curbs and Fences →751.12.4 Chain Link Fence: Per BR, clarified wind load and dead load for chain link fence.
- 16:06, 5 March 2018 diff hist +766 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →Table 1040.2.1.1 List of Prequalified Guardrail Fabricators Brand Registration and Guarantee on File: Per CM, added manufacturer
- 15:20, 2 March 2018 diff hist +430 m 153.13 Highway Safety Per HS, added HS07 agreement
- 14:47, 2 March 2018 diff hist 0 m 237.13 Contract Plan File Name Convention →237.13.2 Electronic Design Data: Per CADD, corrected file naming convention
- 11:55, 2 March 2018 diff hist -242 m Category:702 Load-Bearing Piles Per CM, most recent revision deleted since it was deemed incorrect
- 11:50, 2 March 2018 diff hist 0 N File:702.pdf current
- 11:50, 2 March 2018 diff hist +12 m Category:702 Load-Bearing Piles →702.1.5 Pile Driving Documentation
- 11:47, 2 March 2018 diff hist +242 m Category:702 Load-Bearing Piles →702.1.5 Pile Driving Documentation: Per BR, clarified that reporting of PDA data is not required when piles are driven to rock.
- 11:38, 2 March 2018 diff hist +4 m 750.7 Non-Hydraulic Considerations →750.7.2.3 Roadways and Roadside Applications with ADT < 1700
- 11:35, 2 March 2018 diff hist +53 m 750.7 Non-Hydraulic Considerations →750.7.2.3 Roadways and Roadside Applications with ADT < 1700
- 11:33, 2 March 2018 diff hist +9 m Category:941 Permits and Access Requests →941.6.3.7 Construction Inspection
- 11:28, 2 March 2018 diff hist 0 N File:730.3.jpg current
- 10:56, 2 March 2018 diff hist 0 m Category:732 Flared End Sections →732.1 Installation: Corrected link
- 10:31, 2 March 2018 diff hist -2 m Main Page
- 10:06, 1 March 2018 diff hist +3 m 616.18 Construction Inspection Guidelines for Sec 616 →Flagger Requirements (for Sec 616.4.3): Updated sign no. for PLEASE WAIT FOR PILOT CAR to G20-4a
- 10:04, 1 March 2018 diff hist -2 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.13 Pilot Car Method of One-Lane, Two-Way Traffic Control (MUTCD 6C.13)
- 10:00, 1 March 2018 diff hist +17 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.58: Updated sign no. for PLEASE WAIT FOR PILOT CAR to G20-4a
- 08:56, 28 February 2018 diff hist -664 m 153.16 Maintenance Per TS, MT and Comm Secr, TR57 replaced MT27
- 15:46, 27 February 2018 diff hist +7 m 751.24 LFD Retaining Walls →751.24.2.1 Design: Per BR, minor clarifications
- 12:02, 27 February 2018 diff hist -239 m Main Page EPG 450
- 11:56, 27 February 2018 diff hist 0 N File:450 Estimate Factors 2018.doc current
- 11:56, 27 February 2018 diff hist +10 m Category:450 Bituminous Pavement Design Per EPS, updated Tack Coat estimate factors
- 11:36, 27 February 2018 diff hist 0 N File:Main Page Feb 27, 2018.jpg current
- 11:35, 27 February 2018 diff hist +126 m Main Page
- 11:16, 27 February 2018 diff hist 0 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity
- 11:01, 27 February 2018 diff hist -100 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity: Per EPS, updated link
- 10:27, 27 February 2018 diff hist +1,031 m 153.21 Traffic Per TS, added three new agreements (TR55, TR56, TR57)
- 15:01, 26 February 2018 diff hist -203 m 238.2 Land Surveying →238.2.8 Survey Property Damage: Per RW, removed reference to archaic RW11 agreement
- 14:51, 26 February 2018 diff hist +1 m 751.24 LFD Retaining Walls →751.24.2.1 Design
- 13:47, 26 February 2018 diff hist 0 m 751.24 LFD Retaining Walls →751.24.2.1 Design: Per Br, minor cosmetic clarification
- 12:08, 26 February 2018 diff hist +35 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, updated links
- 13:36, 23 February 2018 diff hist -714 m 236.14 Change in Route Status Report →236.14.6 Roadway Relinquishment Agreement: Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)