User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:56, 13 August 2021 diff hist 0 N File:Fig 616.6.87.1.1 2021.jpg current
- 12:55, 13 August 2021 diff hist +98 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per TS, updated and expanded figures to show correct placement of both short-term and long-term rumble strips.
- 11:30, 13 August 2021 diff hist +29 m Main Page
- 11:23, 13 August 2021 diff hist -9 Engineering Policy Guide:General disclaimer current
- 11:00, 13 August 2021 diff hist +1,111 m Engineering Policy Guide:General disclaimer
- 10:55, 13 August 2021 diff hist +1 m Main Page
- 15:24, 12 August 2021 diff hist +5 m Category:138 Project Development Chronology
- 15:23, 12 August 2021 diff hist 0 N File:2021 map back.pdf current
- 15:22, 12 August 2021 diff hist 0 N File:2021 map front.pdf current
- 15:22, 12 August 2021 diff hist 0 N File:138 2021 map photo.jpg current
- 15:21, 12 August 2021 diff hist +227 m Category:138 Project Development Chronology
- 08:11, 12 August 2021 diff hist +556 m Recent Policy Changes in the EPG EPG 751.21
- 07:51, 12 August 2021 diff hist -104 m 751.21 Prestressed Concrete Slab and Box Beams
- 07:40, 12 August 2021 diff hist 0 N File:751.21.3.8 2021.jpg current
- 07:40, 12 August 2021 diff hist 0 N File:751.21.1.3 solid 2021.jpg current
- 07:39, 12 August 2021 diff hist 0 N File:751.21.1.3 adjacent voided 3 2021.jpg current
- 07:39, 12 August 2021 diff hist 0 N File:751.21.1.3 adjacent voided 4 2021.jpg current
- 07:39, 12 August 2021 diff hist 0 N File:751.21.1.3 spread voided 2021.jpg current
- 07:38, 12 August 2021 diff hist 0 N File:751.21.1.3 adjacent box 3 2021.jpg current
- 07:38, 12 August 2021 diff hist 0 N File:751.21.1.3 adjacent box 4 2021.jpg current
- 07:38, 12 August 2021 diff hist 0 N File:751.21.1.3 spread box 2021.jpg current
- 07:37, 12 August 2021 diff hist +284 m 751.21 Prestressed Concrete Slab and Box Beams Per BR, corrected voided slab beam calculations and rounding
- 10:51, 10 August 2021 diff hist -1 m Category:403 Asphaltic Concrete Pavement →403.1.4 Job Mix Formula
- 13:50, 9 August 2021 diff hist +16 m 106.1 Source of Supply and Quality Requirements →Pre-Qualified Traffic Engineering Consultants for TEAP
- 13:31, 9 August 2021 diff hist -41 m 106.1 Source of Supply and Quality Requirements updated links
- 15:23, 6 August 2021 diff hist 0 N File:138 parson.jpg current
- 15:23, 6 August 2021 diff hist +110 m Category:138 Project Development Chronology
- 15:05, 6 August 2021 diff hist +150 m Category:138 Project Development Chronology
- 14:34, 6 August 2021 diff hist -374 m 106.23 Online Research Publications (Research Publications) deleted superfluous info current
- 14:32, 6 August 2021 diff hist -14 106.23 Online Research Publications (Research Publications) Updated archaic
- 13:52, 6 August 2021 diff hist +33 m Category:138 Project Development Chronology
- 13:07, 6 August 2021 diff hist +7 m Category:138 Project Development Chronology
- 12:58, 6 August 2021 diff hist +372 m Category:138 Project Development Chronology minor updates
- 10:16, 6 August 2021 diff hist +167 m Category:138 Project Development Chronology
- 07:52, 6 August 2021 diff hist +16 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) Inclusive language
- 11:20, 5 August 2021 diff hist 0 m Category:138 Project Development Chronology
- 10:16, 5 August 2021 diff hist +46 m Category:102 Bidding Requirements and Conditions
- 10:16, 5 August 2021 diff hist +7 m Category:102 Bidding Requirements and Conditions updated link
- 09:00, 5 August 2021 diff hist 0 N File:127.25.7.4 contact.pdf current
- 09:00, 5 August 2021 diff hist +40 m 127.25 Maintenance Environmental Policies
- 08:58, 5 August 2021 diff hist -405 m 127.25 Maintenance Environmental Policies Per Env'l, updated Environmental Specialist contact info
- 15:29, 4 August 2021 diff hist -533 Category:102 Bidding Requirements and Conditions
- 15:28, 4 August 2021 diff hist +533 Category:102 Bidding Requirements and Conditions
- 13:17, 4 August 2021 diff hist -356 m Category:102 Bidding Requirements and Conditions deleting archaic information
- 12:49, 4 August 2021 diff hist -34 m Category:102 Bidding Requirements and Conditions updating archaic link and info
- 12:41, 4 August 2021 diff hist -2 m Category:102 Bidding Requirements and Conditions updating archaic information and link
- 12:37, 4 August 2021 diff hist -141 m Category:102 Bidding Requirements and Conditions updated archaic information
- 11:14, 4 August 2021 diff hist -22 m Category:102 Bidding Requirements and Conditions updating broken links
- 11:25, 2 August 2021 diff hist -6 m 236.16 Outdoor Advertising →236.16.18.1 Informal Hearing: inclusive language
- 09:48, 2 August 2021 diff hist -588 m Category:101 Standard Forms →Construction and Materials: Per CM, archaic (2018, 2019) JOC forms removed
- 09:02, 29 July 2021 diff hist 0 m Recent Policy Changes in the EPG
- 08:47, 29 July 2021 diff hist -4 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 08:45, 29 July 2021 diff hist +4 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 08:45, 29 July 2021 diff hist +2 m 106.9 Buy America Requirement →When does Buy America apply to manufactured items?
- 08:40, 29 July 2021 diff hist -67 m Recent Policy Changes in the EPG EPG 106.9
- 08:36, 29 July 2021 diff hist +2,886 m 106.9 Buy America Requirement Per CM, revision expands the NTPEP compliance for Buy America.
- 15:23, 28 July 2021 diff hist +3 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 13:45, 28 July 2021 diff hist 0 m 232.2 Passing Lanes →232.2.1 Discussion current
- 10:45, 28 July 2021 diff hist +86 m Category:101 Standard Forms →Bridge: Per BR, updated archaic Culvert Hydraulics Report with newer version
- 09:02, 28 July 2021 diff hist -1 m Recent Policy Changes in the EPG
- 09:02, 28 July 2021 diff hist -163 m Recent Policy Changes in the EPG EPG 751.11 2.1
- 08:47, 28 July 2021 diff hist +117 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, clarified that in the rare case where intermediate bents are made integral (by extending the beam cap stirrups into the diaphragm), plain neoprene bearing pads may be considered at the intermediate bent.
- 14:42, 27 July 2021 diff hist 0 m 236.6 Appraisal and Appraisal Review Per RW, updated broken links to forms
- 13:42, 27 July 2021 diff hist -39 m 626.2 Centerline Rumble Strips Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. Also updated typical section sheet to reflect new Std. Plan 626.00.
- 13:39, 27 July 2021 diff hist +25 m Category:626 Rumble Strips Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. current
- 13:36, 27 July 2021 diff hist 0 N File:232.2.3.2.pdf current
- 13:36, 27 July 2021 diff hist -84 m 232.2 Passing Lanes Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. Also updated typical section sheet to reflect new Std. Plan 626.00.
- 13:18, 27 July 2021 diff hist 0 N File:903.16.24 2021.jpg current
- 13:17, 27 July 2021 diff hist 0 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 13:03, 27 July 2021 diff hist 0 N File:903.16.24 2021.pdf current
- 13:02, 27 July 2021 diff hist +5 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 13:01, 27 July 2021 diff hist 0 N File:903.16.24.pdf current
- 13:01, 27 July 2021 diff hist 0 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes
- 13:00, 27 July 2021 diff hist -1 m 903.16 Typical Signing Applications →Figure 903.16.24 Typical Signing for Passing Lanes: Per TS, updated figure to align with new Std. Plan 626.00
- 12:17, 27 July 2021 diff hist 0 N File:147.4 Programmatic Work Plan for FPVC.docx current
- 12:16, 27 July 2021 diff hist +378 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per EPS, added "Programmatic Work Plan for Utilizing FPVC..."
- 08:32, 27 July 2021 diff hist -38 m Recent Policy Changes in the EPG EPG 606
- 08:28, 27 July 2021 diff hist +277 m Category:606 Guardrail and Guard Cable Per EPS, provided a contact number for reporting damaged guardrail or guard cable
- 10:38, 26 July 2021 diff hist +67 m Category:948 Incident Response Plan and Emergency Response Management
- 15:06, 23 July 2021 diff hist -268 m Recent Policy Changes in the EPG EPG 402, EPG 409, EPG 147.4
- 15:05, 23 July 2021 diff hist 0 N File:147.4.2 FPVS JSP Example.docx current
- 14:55, 23 July 2021 diff hist +5,955 m 147.4 Fixed Price Variable Scope (FPVS) Contracting Per DE, Fixed price variable scope (FPVS) guidance was temporarily removed from the EPG. FHWA has now approved the use of FPVS at a programmatic level
- 14:11, 23 July 2021 diff hist 0 N File:409 FY2022 Contract Seal Coat Job Book Guidelines.docx current
- 14:09, 23 July 2021 diff hist 0 N File:409 FY2022 Contract Seal Coat Guidelines.docx current
- 14:08, 23 July 2021 diff hist +556 m Category:409 Seal Coat Per DE, the Seal Coat and JSP package were updated. New Seal Coat Book Job Guidelines and Seal Coat Book Job JSP Package were added.
- 13:28, 23 July 2021 diff hist 0 N File:402 FY2022 Contract Leveling Course Book Job Guidelines.docx current
- 13:28, 23 July 2021 diff hist 0 N File:402 FY2022 Contract Leveling Course Guidelines.docx current
- 13:28, 23 July 2021 diff hist +509 m Category:402 Bituminous Surface Leveling Per DE, the CLC and JSP package were updated. New CLC Book Job Guidelines and CLC Book Job JSP Package were added.
- 13:26, 21 July 2021 diff hist -1 m Recent Policy Changes in the EPG
- 13:26, 21 July 2021 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory System (RSAS)
- 13:21, 21 July 2021 diff hist -35 m Recent Policy Changes in the EPG EPG 616.6.89
- 13:14, 21 July 2021 diff hist +3 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.88 Screens (MUTCD 6F.88)
- 13:13, 21 July 2021 diff hist +267 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per EPS, linked new NJSP for a radar speed advisory system to renamed "Radar Speed Advisory System" (formerly "Radar Speed Advisory Assembly")
- 10:14, 21 July 2021 diff hist -1,564 m Recent Policy Changes in the EPG EPG 903.4.8 and EPG 903.4.9
- 10:11, 21 July 2021 diff hist +2,394 m 903.4 Overhead Sign Mounting Per BR and TS, in EPG 903.4.8 and .9, expanded and updated guidance for handling bridge sign attachments to current established practice. References to wall-mounted structures removed from EPG 903.4.8 and .9
- 15:09, 19 July 2021 diff hist +39 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per CM, updated link to SWPPP Form 806.8.2
- 15:07, 19 July 2021 diff hist +135 m Category:101 Standard Forms Per CM, updated links to SWPPP Form 806.8.2 and added new Non-Conformance Report (NCR) form in EPG 101
- 11:20, 16 July 2021 diff hist +68 m Help Article →EPG Approval Process
- 11:18, 16 July 2021 diff hist -65 m Help Article →EPG Approval Process
- 11:15, 16 July 2021 diff hist +2 m Help Article →EPG Ballot Cycles: updated ballot calendar