User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 15:04, 30 August 2010 diff hist +44 m Category:1004 Graded Aggregate for Bituminous Surface added links
- 15:03, 30 August 2010 diff hist +2 m 1057.4 Laboratory Testing for Sec 1057 →1057.4.1 Procedure: added link
- 15:01, 30 August 2010 diff hist +11 m 903.23 Laboratory Testing Guidelines for Sec 903 →903.22.1 Procedure: added link
- 14:58, 30 August 2010 diff hist +41 m 106.20 Reporting →106.20.1 SiteManager (SM): added link
- 14:56, 30 August 2010 diff hist +42 m Category:239 Construction Inspection Guidelines for Final Plans →239.10 SiteManager Plans: added link
- 14:53, 30 August 2010 diff hist +83 m Category:321 Geotechnical Engineering added link
- 11:19, 30 August 2010 diff hist +4 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →203.2.3.1.8 Rock Fill: minor clarification
- 10:24, 30 August 2010 diff hist +260 m 236.5 Property Management Per RW, the threshold was raised from $10,000 to $25,000 when requiring the use of a third party agreement
- 10:10, 30 August 2010 diff hist +61 m 643.2 Local Utility Adjustments - Public and Private →643.2.2.6 Field Inspection: Per Traffic and CM, "Utility and light poles are not to be used to mount signs" was added for emphasis.
- 10:03, 30 August 2010 diff hist +48 m 903.21 Construction Inspection Guidelines for Sec 903 →Sign Inspection: Per Traffic and CM, "Light poles are not to be used to mount signs" was added for emphasis.
- 12:48, 27 August 2010 diff hist 0 N File:Recycle bridge.jpg current
- 12:48, 27 August 2010 diff hist +41 m Environmentally Friendly added figure
- 11:59, 27 August 2010 diff hist +1 Main Page minor correction
- 10:41, 27 August 2010 diff hist 0 N File:Safe and Sound Boone.wmv current
- 10:41, 27 August 2010 diff hist +298 m Category:Safe and Sound added link and a video
- 10:28, 27 August 2010 diff hist +57 m Category:450 Bituminous Pavement Design →450.2 Mix Selection: updated link
- 10:27, 27 August 2010 diff hist +122 m Category:401 Bituminous Base and Pavement →401.1 Design: updated links
- 10:14, 27 August 2010 diff hist +33 m Where to Find PDM Information in the EPG →Chapter VI, Pavement Structure Design: updated link
- 10:13, 27 August 2010 diff hist +33 m Where to Find PDM Information in the EPG →Chapter IV, Detail Design: updated link
- 10:11, 27 August 2010 diff hist +176 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction updated links
- 10:02, 27 August 2010 diff hist +34 m Category:621 Flowable Backfill updated links
- 09:56, 27 August 2010 diff hist 0 N File:143.wmv current
- 09:06, 27 August 2010 diff hist +33 m Category:500 RIGID PAVEMENT updated link
- 09:06, 27 August 2010 diff hist +33 m Category:400 FLEXIBLE PAVEMENT updated link
- 09:05, 27 August 2010 diff hist +33 m Where to Find PDM Information in the EPG →Chapter IV, Detail Design: updated link
- 08:55, 27 August 2010 diff hist +50 m Category:350 Design for Bases and Aggregate Surfaces →350.6 Shoulders: updated link
- 08:54, 27 August 2010 diff hist -2,370 m Shoulder Surface Article moved to EPG Other Aspects of Pavement Design. (This 2008 article had 3346 hits. Hist: 2/23/09, Added A3 shldr guidance & updated use of A1, A2 & A3) current
- 08:48, 27 August 2010 diff hist +35 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.4 Links to Other Resources: updated link
- 08:47, 27 August 2010 diff hist +68 m 136.8 Preliminary Design →136.8.7 Alternate Paving: updated links
- 08:46, 27 August 2010 diff hist +132 m Where to Find PDM Information in the EPG →Chapter VI, Pavement Structure Design: updated links
- 08:44, 27 August 2010 diff hist +33 m Main Page updated link
- 08:43, 27 August 2010 diff hist +85 m Category:235 Preliminary Plans →235.3.13 Pavement Thickness Determination: updated links
- 08:26, 27 August 2010 diff hist +109 m Category:235 Preliminary Plans →235.3.5 Typical Sections: updated links
- 08:24, 27 August 2010 diff hist -12,262 m Alternate Pavement Moved to EPG Other Aspects of Pavement Design. (This 2007 article had 4973 hits. 4/28/08 Revised how life cycle cost adjustment is applied to pv't & shldrs)
- 08:02, 27 August 2010 diff hist +28,383 N Other Aspects of Pavement Design Several unnumbered EPG articles compiled. (Alt. Pav't, 4973 hits; Shlder Surf., 3346 hits; Soil Cha., 2975 hits & no appreciable history; Temp Conn., 1304 & no hist; Thickness Det. 4618 hits, no hist)
- 15:08, 26 August 2010 diff hist +5 m 236.7 Negotiation updated links
- 15:05, 26 August 2010 diff hist +4 m 236.7 Negotiation →236.7.2.6 Basis for Just Compensation: minor clarification
- 15:04, 26 August 2010 diff hist +5 m 236.7 Negotiation updated links
- 14:42, 26 August 2010 diff hist +1,288 m Category:450 Bituminous Pavement Design EPG Asphalt over Rubblized Pavement (article from 2007; no appreciable history; 1253 hits) info moved to EPG 450.8.
- 12:54, 26 August 2010 diff hist +35 m 103.1 Bid Opening and Award Process →103.1.6.3 Assembling Contract Plans: added link to EPG 143
- 12:53, 26 August 2010 diff hist +35 m 127.23 Negotiated Commitments and Mitigation in the National Environmental Policy Act (NEPA) Process →127.23.1.4 Enhancements: added link to EPg 143
- 12:52, 26 August 2010 diff hist +35 m Category:700 STRUCTURES AND HYDRAULICS added link to EPG 143
- 12:51, 26 August 2010 diff hist +35 m 104.13 Construction Inspection Guidance for Sec 104 →Specification Provision: added link to EPG 143
- 12:50, 26 August 2010 diff hist +35 m Category:130 Value Engineering →130.1 Discussion: added link to EPG 143
- 12:49, 26 August 2010 diff hist -219 m Main Page EPG 143
- 12:46, 26 August 2010 diff hist +59 m Category:100 GENERAL Linked to new EPG 143 Practical Design
- 12:45, 26 August 2010 diff hist 0 N File:140.1 Greene County 160.pdf
- 12:44, 26 August 2010 diff hist 0 N File:140.1 Barry County 37.pdf
- 12:44, 26 August 2010 diff hist 0 N File:140.1 St. Louis County I-64.pdf
- 12:44, 26 August 2010 diff hist 0 N File:140.1 Osage County D.pdf