Search results

Jump to navigation Jump to search
  • ===127.25.1.3 Tire Management=== ...ules/csr/current/10csr/10c80-8.pdf 10 CSR 80-8.010 - 80-8.040] Solid Waste Management
    52 KB (7,448 words) - 12:50, 15 March 2023
  • ...4) to tailor the standard Section 106 process to better fit in with agency management or decision making. PAs may identify how specific resources may be treated, ...s. “Adverse effects” are those that diminish characteristics qualifying a property for inclusion in the National Register.
    47 KB (6,899 words) - 15:51, 26 July 2023
  • ...uct with contractors and the public and employee stewardship of government property. Absolute integrity of all department personnel is essential if public con ...oses. No such official or employee shall take any active part in political management or in political campaigns. All such persons shall retain the right to vote
    1 member (0 subcategories, 1 file) - 14:45, 24 January 2024
  • ===106.20.1.3 Quality Management AWP Reporting=== Refer to [[:Category:150 Quality Management|EPG 150 Quality Management]] for guidance.
    26 KB (4,023 words) - 14:03, 6 December 2021
  • ...Post Office standards. Questionable situations should be referred to risk management. ...in a timely manner and liability problems with use of equipment on private property
    14 KB (2,098 words) - 10:54, 3 January 2024
  • ...nd worker safety are integral and high-priority elements of every incident management, construction, maintenance, permit and utility operation. Consideration of * Communicating with and providing reasonable accommodations for adjoining property owners.
    42 KB (6,035 words) - 15:56, 10 October 2023
  • ...to the State Design Engineer - Right of Way has authority to acquire land, property and rights as indicated on right of way plans through the district right of Acquisition of property rights cannot commence on any project until the project manager obtains acq
    126 KB (19,061 words) - 11:05, 4 March 2024
  • ...is included to that effect. If any alternate includes [[127.9 Floodplain Management and the Regulatory Floodway|significant encroachment on the floodplain]], i '''Convey to Adjacent Property Owners'''
    0 members (0 subcategories, 0 files) - 10:10, 22 September 2023
  • ...ased on field survey measures and verifications. The district will obtain property ownership information to show on the preliminary plan as early as possible ...are determined in accordance with [[:Category:940 Access Management|Access Management Guidelines]]. For fully limited access right of way projects where constru
    0 members (0 subcategories, 0 files) - 12:07, 26 March 2024
  • ...on MHTC’s right of way. [[:Category:940 Access Management|EPG 940 Access Management]] should be reviewed thoroughly along with this article. [[image:941 Permitting Process for Access Management.jpg|right|400px]]
    0 members (0 subcategories, 0 files) - 14:40, 24 April 2024
  • ==236.4.1 Property Descriptions== ...d are used to calculate the areas of the land lots, they do not constitute property lines. See '''Exhibit 236.4.2.9''', an example of a fractional section.
    96 KB (15,015 words) - 10:58, 4 March 2024
  • ...ch as the Missouri Department of Natural Resources and the State Emergency Management Agency may need to grant approval for the improvement to proceed. ...R/W Clear]]''' - Date MoDOT has taken legal and physical possession of all property and district has submitted the r/w clearance certification to Central Offic
    0 members (0 subcategories, 0 files) - 16:42, 21 September 2023
  • ...mple Letter Notifying Property Owner of Survey.doc|Sample Letter Notifying Property Owner of Survey Work]] ...llection, Construction, Machine Control, Automatic Vehicle Location, Asset Management, Automated road salting, Snowplow guidance, unmanned mowers.
    58 KB (8,878 words) - 13:57, 18 February 2022
  • ...rage, collect electronic data, automate workflow processes and aid process management for agreements between MoDOT and external parties. Standard multi-use agree :* Attach the Property Page from the eAgreements SharePoint site to all agreements.
    20 members (0 subcategories, 0 files) - 09:29, 7 May 2024
  • The [[616.14 Work Zone Safety and Mobility Policy|“Work Zone Traffic Management Plan”]] special provision is required with all plans. This special provis ...l highway construction, utility work, maintenance operations, and incident management including minor maintenance and utility projects prior to occupying the TTC
    44 KB (6,776 words) - 14:50, 22 May 2024
  • ...dered prior to condemnation action, as determined by district right of way management. ...with supporting financial data for its determinations of the value of the property for purposes of the offer made in subsection 1 of this section. (2) Any ap
    221 KB (32,649 words) - 11:04, 4 March 2024
  • Printed out versions of these web pages were put in binders and mailed to management, all districts, and all divisions with a letter from Jim Jackson dated Apri ...manner to prevent loss of material and prevent damage to State or private property. All bulk salt shall be stored in roofed buildings. Asphalt pads are to b
    99 KB (14,748 words) - 14:21, 24 November 2021
  • ...ural Resources (MDNR). The following guidance outlines MoDOT’s stormwater management program in accordance with the Clean Water Act, National Pollution Discharg ...f activities, prohibitions of practices, maintenance procedures, and other management practices to prevent or reduce the pollution of waters of the state. BMPs
    53 KB (7,691 words) - 10:41, 22 June 2022
  • [[236.5 Property Management#236.5.25.5 Risk Assessment|EPG 236.5.25.5 Risk Assessment]] - Sovereign imm ...Documents|EPG 137.6 Close Out Procedure for External CM SharePoint Quality Management Documents]] now present updated information about how CM Division stores el
    48 KB (6,056 words) - 13:28, 28 May 2024
  • ...te and/or check legal descriptions for acquisition of land, access rights, property rights and easements and the disposal of excess right of way, excess land, :'''1. Land, Improvements, Property Rights and Damages'''
    131 KB (19,803 words) - 13:48, 8 April 2024

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)