Difference between revisions of "Main Page"
m (EPG 101) |
m (EPG 750.51) |
||
Line 61: | Line 61: | ||
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | |valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | ||
+ | '''[[751.50 Standard Detailing Notes#Overcoating Existing Steel (Notes A4a.10 – A4a.14)|Overcoating Existing Steel Standard Detailing Notes]]''' | ||
+ | |||
+ | 8/24/12: Three paint notes were modified, primarily revising an existing note that prime coat shall not be required for calcium sulfonate overcoating projects. | ||
+ | |||
'''Two Updated QRGs''' | '''Two Updated QRGs''' | ||
Line 155: | Line 159: | ||
'''[http://epg.modot.org/index.php?title=238.3_Route_Surveying#238.3.37_Bridge_Survey_Information Bridge Survey Information]''' | '''[http://epg.modot.org/index.php?title=238.3_Route_Surveying#238.3.37_Bridge_Survey_Information Bridge Survey Information]''' | ||
− | 7/12/12: Guidance for setting valley sections has been improved, particularly in [http://epg.modot.org/index.php?title=238.3_Route_Surveying#238.3.37.12_Valley_Sections EPG 238.3.37.12]. A tutorial and video for creating a file containing data points are also now available | + | 7/12/12: Guidance for setting valley sections has been improved, particularly in [http://epg.modot.org/index.php?title=238.3_Route_Surveying#238.3.37.12_Valley_Sections EPG 238.3.37.12]. A tutorial and video for creating a file containing data points are also now available. |
− | |||
− | |||
− | |||
− |
Revision as of 09:16, 24 August 2012
HELPFUL EPG VIDEOS: | •Logging into the EPG | |
•Finding Info in the EPG | ||
•Article History & How to Receive EMails When Articles are Revised |
RECENT POLICY CHANGES IN THE EPG | |||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
Overcoating Existing Steel Standard Detailing Notes 8/24/12: Three paint notes were modified, primarily revising an existing note that prime coat shall not be required for calcium sulfonate overcoating projects. Two Updated QRGs 8/23/12: Change Orders – Value Engineering and Job Order Contracts were updated. Widening and Repair of Bridges 8/23/12: Bridge has updated numerous figures in EPG 751.40.2.4.1 Cast-In-Place Deck With (and Without) an Existing Wearing Surface, Hydro Demolition to match the standard plans. Consultant Contract Invoicing 8/22/12: The invoice template guidance was clarified and slightly expanded in EPG 134.5.1 Invoicing. 8/20/12: An acceptance statement was added to clarify the method of acceptance for mulch overspray. Girder/Beam Chairs and Concrete Pile Cap Integral End Bents 8/14/12: Bridge Division has clarified guidance for girder chairs and for reinforcement of concrete pile cap integral end bents. Table 1020.4.17 Tensile Strength of Lock Seams 8/9/12: This table's values have been updated to conform with AASHTO and ASTM standard practices. 8/9/12: The table of unit weights of dead load was updated to conform with AASHTO Table 3.5.1-1. 8/3/12: A Safety EdgeSM constructed at the edge of each shoulder has been added as a minimum expectation for minor route shouldering projects. 8/2/12: Bridge has produced directions on how to copy detailing notes from the EPG to MicroStation drawings. Minor Routes Shouldering Project Guidelines 8/2/12: Since the public perceives shoulders as an enhancement to the transportation system and consistently identifies them as a top tier desire, this new article facilitates the design of shoulders for minor routes. 7/31/12: Guidance for the procurement process and implementation procedures has been expanded in this article. Two Updated QRGs 7/31/12: Contract Adjustments and Line Item Adjustments were updated. New Adopt-A-Highway Signs 7/26/12: New guidance has been added to EPG 903.9.6 for the updated signs. Sequential Flashing Warning Light 7/26/12: Fig. 616.6.83 has been added for additional guidance. New Guardrail Height Requirement 7/25/12: Guidance was revised with the new guardrail height requirements per FHWA and AASHTO. New height requirements were also provided for using guardrail with urban sections of curb and curb and gutter. 7/25/12: This new article includes guidance for Add Alternate Bidding (additional items of work that the contractors all bid on and may be awarded if the bids come within the budget specified in the bidding documents), Job Order Contracting (JOC) (a procurement process that allows MoDOT to award fixed price construction contracts with indefinite delivery and indefinite quantities at individual work locations throughout the project limits) and Alternative Technical Concepts (a proposed change to agency-supplied base design configurations, project scope, design criteria or construction criteria that provides a solution that is equal or better to the requirement in the contract). 7/25/12: New guidance for Safety EdgeSM. This concept consists of beveling the edge of an HMA pavement during placement, to provide a smooth height transition for future errant vehicles to regain the roadway. The Safety EdgeSM is easy to construct, uses very little additional material, and has the residual benefit of increasing the compaction of the edge. Sequential Lighting 7/25/12: EPG 616.6.63 and EPG 616.6.83 were revised to accommodate sequential lighting which allows traffic, especially large trucks, to enter the work zone in a safer manner. Lateral Placement of Guard Cable in the Median 7/25/12: The parameters were clarified for lateral placement of high-tension cable barriers in medians that are 30 ft. or wider. TM-64 and TM-67 7/24/12: Both TM-64 and TM-67 are no longer valid and were deleted from Material Inspection Test Methods guidance. EPG 236.5.18 Categorical Exclusion Review 7/23/12: Guidance was updated to allow the review time for a Categorical Exclusion to be extended from 1 to 3 years. Bridge Standard Detailing Notes 7/19/12: The C2 Prestressed Girders, Beams & Panels and H2 Concrete notes were reorganized in EPG 751.50 Standard Detailing Notes. Also, guidance for Effective Slab Thickness was added in EPG 751.22.2.3 Flexure. Contract Leveling Course 7/13/12: The Contract Leveling Course (CLC) Guidelines, JSPs for CLC and PDFs of the CLC Plan Templates have been updated in EPG 402 Bituminous Surface Leveling to encourage district flexibility. The primary changes impact requirements for temporary striping. 7/12/12: Guidance for setting valley sections has been improved, particularly in EPG 238.3.37.12. A tutorial and video for creating a file containing data points are also now available. |