Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 903.15.1)
m (EPG 109.12.3.2)
Line 2: Line 2:
 
{| cellspacing="3"  
 
{| cellspacing="3"  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"|
 +
'''[[:Category:109 Measurement and Payment#109.12.3.2 Description, Reason and Supporting Documentation|EPG 109.12.3.2 Description, Reason and Supporting Documentation]]'''
 +
 +
3/19/21: This new guidance is available for addressing time adjustment change orders as well as the supporting documentation.
 +
 
'''[[903.14 Memorial Signs#903.14.1 Memorial Designation Programs|EPG 903.14.1 Memorial Designation Programs]]'''
 
'''[[903.14 Memorial Signs#903.14.1 Memorial Designation Programs|EPG 903.14.1 Memorial Designation Programs]]'''
  
Line 101: Line 105:
  
 
2/1/21: Guidance now incorporates additional ''Roadside Design Guide'' (RDG) verbiage, RDG tables, and recommends a safety analysis as a means of documenting decisions for safety strategies.
 
2/1/21: Guidance now incorporates additional ''Roadside Design Guide'' (RDG) verbiage, RDG tables, and recommends a safety analysis as a means of documenting decisions for safety strategies.
 
'''Early Acquisition and Advance Acquisition'''
 
 
1/27/21: New [[127.14 National Environmental Policy Act (NEPA) Classification and Documents#127.14.3.7 Early and Advanced Acquisition of Right of Way|EPG 127.14.3.7 Early and Advanced Acquisition of Right of Way]] and extensively updated [[236.3 Administration#236.3.4 Right of Way Acquisition Authority and Project Funding|EPG 236.3.4 Right of Way Acquisition Authority and Project Funding]] (especially [[236.3 Administration#236.3.4.4 Early and Advance Acquisition|EPG 236.3.4.4 Early and Advance Acquisition]]) now present guidance that match new FHWA requirements.
 

Revision as of 13:56, 19 March 2021

EPG 109.12.3.2 Description, Reason and Supporting Documentation

3/19/21: This new guidance is available for addressing time adjustment change orders as well as the supporting documentation.

EPG 903.14.1 Memorial Designation Programs

3/17/21: New Memorial Designation Programs guidance is now available for statewide uniformity.

Pier Protection

3/15/21: In EPG 751.2.2.6 Other Loads, EPG 751.31.2.2 Loads and EPG 751.31.3.2 Column, pier protection guidance was updated to reflect the latest AASHTO collision requirements and MoDOT exceptions.

EPG 751.10 General Superstructure

3/12/21: Deck cantilever design guidance for the MASH Type D and H barriers is now available in EPG 751.10, particularly in EPG 751.10.1.3 Loads.

EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts

3/12/21: Guidance has been updated for the use of MASH and NCHRP 350 barrier and rail.

AWP QRG Revision Dates

3/9/21: For the convenience of readers, AWP QRG Revision Dates information has been added to EPG 101, AASHTOWare Project Quick Reference Guides (QRGs).

EPG 105.15.1 Partial Acceptance

3/8/21: New, clarifying guidance is now available for partial acceptance.

Public Involvement when Considering Roundabouts and J-Turns

3/5/21: Guidance was expanded in EPG 233.2.6 Type 4: Directional Median Opening with Downstream U-Turns and EPG 233.3 Roundabouts to draw additional attention to the benefits of public involvement for J-Turn and roundabout designs.

EPG 616.6.61 Arrow Boards

3/4/21: The Sign Display table was revised to show that the Work Type for Flashing Double Arrows is both Stationary and Mobile Operations, not just Stationary.

Quality Standards for Temporary Traffic Control Devices

3/2/21: This new work zone flyer highlights the top deficiencies noticed in MoDOT work zones. Also, guidance for TTCD retroreflectivity has been expanded in EPG 616.19.2.1 General.

Buy America Requirements

2/25/21: Guidance in EPG 106.9 Buy America Requirement and EPG 106.21.1.1 Summary Packet of Materials Inspected was added to utilize NTPEP compliance that AASHTO already has in place for programmatic acceptance of Buy America. It significantly reduces paperwork and effort from suppliers, contractors, MoDOT and FHWA.

EPG 751.50 Standard Detailing Notes

2/23/21: Several H3. Bearings notes were updated to clarify sole plate and anchor bolt coating requirements when superstructure is galvanized. Two notes, H3.29.2 and H3.49.2, were added.

School Speed Limit

2/22/21: Guidance for when to install a school speed limit flasher assembly was updated in EPG 902.12.7 Procedures for Advance Beacon Installations by Outside Parties. The guidance for the SPEED LIMIT XX WHEN FLASHING sign is now available in EPG 903.18.14 School Speed Limit Flasher Assembly (S5-1) and END SCHOOL SPEED LIMIT Sign (S5-3). New guidance about stopping for school buses loading or unloading children is available in EPG 903.18.16 STOP FOR SCHOOL BUS LOADING OR UNLOADING CHILDREN STATE LAW (Special R0-1), ALL LANES (Special W0-1) Signing.

Accessible Pedestrian Signal

2/22/21: In EPG 902.6.9 Accessible Pedestrian Signals and Detectors – General through EPG 902.6.15 Post-installation Checklist of Accessible Pedestrian Signals and Maintenance, guidance about Accessible Pedestrian Signals (APS) for the visually impaired has been expanded. Standards and support are now provided for APS locations, walk indications, tactile arrows, locator tones, and extended pushbutton press features. A post-installation checklist has also been provided. Pages 15 and 16 of the ADA Checklist was also updated in EPG 101 Standard Forms, EPG 136.9 Plans, Specs and Estimates (PSE), and EPG 642.8 Sidewalk Design Criteria.

EPG 236.4.5.5 Right of Entry

2/19/21: New Right of Entry guidance is available for when and how this agreement (RW21) should be used.

EPG 238.2.17 Professional Land Surveyor Review

2/19/21: Guidance was updated to reflect the legal requirement that permanent easements must be signed and sealed by the PLS.

EPG 147.3 Job Order Contracting (JOC)

2/18/21: The opening paragraph has been updated because the FHWA has incorporated their Final Rule for ID/IQ projects into 23 CFR 635 Subpart F. JOCs are a procurement means for delivering ID/IQ projects.

Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist

2/17/21: This new Highway Safety/Traffic checklist is available at EPG 101 Standard Forms and EPG 902.5.8.4 Record Keeping.

EPG 237.13.1 Design Contract Plans

2/17/21: Clarified guidance about how to name contract plan files when typical sections are not included in the plans.

EPG 127.1.2.1 Location/Conceptual Plan Stage

2/11/21: Guidance was clarified that NEPA can be approved at location/conceptual plan stage for simple projects but occurs later for more complicated projects.

EPG 134.3.2 Fixed Fee Review

2/9/10: Guidance has been clarified (for instance, Facilities Capital Cost of Money Rate is not included in the fixed fee calculation).

Open Cell Foam Joint and Preformed Compression Joint

2/8/21: Guidance for open cell foam joint seal and updated preformed compression seal for revised manufacturer data was implemented in EPG 751.13.1.1.12 Expansion Type Selection Table, EPG 751.13.2 Preformed Silicone, EPDM, and Open Cell Foam Joint Seals, EPG 751.13.3 Preformed Compression Seal Expansion Joint System. In EPG 751.50 Standard Detailing Notes, H5. Expansion Joint Systems, preformed compression joint notes were updated and in H5f. Open Cell Foam Joint Seal, new notes for Bridge Standard Drawings were added.

EPG 751.22.1.4 Span and Structure Lengths

2/4/21: Guidance has been added that limits span lengths to 105 ft. for Type 6 girders due to stability issues arising from lengths greater than this length.

EPG 751.50 Standard Detailing Notes

2/2/21: The coating requirements for Grade 50 W steel sole plate were clarified in the notes associated with Standard Detailing H3.29.1 and H3.49.1 as well as the Standard Detailing Notes H3.29.1 and H2.49.1 themselves.

EPG 231.4.2 Pavement Resurfacing and Rehabilitation Projects and EPG 231.4.3 Shoulder Widening Projects

2/1/21: Guidance has been revised to standardize the construction of shoulder widening projects across all the districts. This revision also establishes that Type A2 and Type A3 shoulders are used only in conjunction with the construction of new pavement. EPG 231.4.3 Shoulder Widening Projects replaces the former non-numbered article, EPG Minor Routes Shouldering Project Guidelines.

EPG 231.2 Clear Zones

2/1/21: Guidance now incorporates additional Roadside Design Guide (RDG) verbiage, RDG tables, and recommends a safety analysis as a means of documenting decisions for safety strategies.