* Added new Cost Estimate Guide for Scoping in EPG [[104.7_Scoping_Estimates|104.7 Scoping Estimates]].
* Adding language to EPG [[:Category:501_Concrete#501.1.4.5_Compressive_Strength|501 Concrete]] for how concrete cylinders need to be marked when they are submitted to the central lab for testing.
</div>
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 22, 2026
<div style="margin: 15px; border:1px solid black; width:97%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">January 22, 2026
----
----
* Updated EPG [[107.13_Insurance_Requirements|107.13 Insurance Requirements]] to link to new Sovereign Immunity Limits.
* Updated EPG [[107.13_Insurance_Requirements|107.13 Insurance Requirements]] to link to new Sovereign Immunity Limits.
* Minor changes were made to the wording of EPG [[106.9_Buy_America_Requirement#106.9.5_BABA_Review_Process|106.9.5 BABA Review Process]].
* Provide clearer language that is more definitive guidance for contractors in EPG [[127.27_Guidelines_for_Obtaining_Environmental_Clearance_for_Off-Site_Activities|127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities]]
</div>
</div>



Latest revision as of 15:52, 28 January 2026


January 28, 2026
  • Added new Cost Estimate Guide for Scoping in EPG 104.7 Scoping Estimates.
  • Adding language to EPG 501 Concrete for how concrete cylinders need to be marked when they are submitted to the central lab for testing.
January 22, 2026
January 22, 2026
January 21, 2026
  • EPG 751.1.2.17 and 751.9.1 updated to provide better access to bridge preliminary seismic design map for LRFD.
January 16, 2026
  • Updates to the EPG were made due to the MUTCD 11th Edition in EPG Articles 616, 620, 900, 903, 908, 910, 911, 913 and 914. For more information on the changes see the 2025 MUTCD Special Ballot.
January 13, 2026
  • Updating existing policy in EPG 136.4.1.6 Conflict of Interest to better describe/clarify existing requirements as it relates to consultant conflicts of interest on LPA projects,
January 5, 2026
  • Updates to EPG 501.2.9 and 1066.1 due to the phasing out the use of Aluminum powder for expansive concrete and adopting American Concrete Institute ACI-223 "Srinkage Compensating Concrete Guide"
  • Updates to EPG 750.7.2 Types and 941.9.8.4 Culvert Pipe to allow up to 60" SRPE in Group A Flexible Polyethylene category and updates corrugated polyethylene pipe to "double wall polyethylene" pipe. Provides details for QPL application and requirements.
December 19, 2025
November 19, 2025
November 18, 2025
November 13, 2025
October 22, 2025
October 21, 2025
October 20, 2025
September 10, 2025
September 9, 2025
September 8, 2025
  • Added new agreement TR63_Installation_of_Rectangular_Rapid_Flashing_Beacons in EPG 153.21 Traffic.
September 5, 2025
  • Updated EPG 751.10.4_Conduit_Systems for conduit placement requirement in barrier near expansion device to avoid interference with conduit during expansion material installation.
August 7, 2025
July 14, 2025
  • Provide an inorganic ethyl silicate topcoat option for inorganic zinc primers on structural steel and other miscellaneous coating issues are addressed in EPG 751.1.2.9.2, 751.6.1,751.6.2.11, 751.6.2.12, 751.14.5.8, 751.50 Notes in A.4, and 1045.
  • Clarify conical pile points to require ASTM A148, Grade 90-60 and not allow the grade 35 shoes for CIP correlating with recent changes requiring modified Grade 3 shells with a 50 ksi yield strength in EPG G5. CIP Concrete Piles (Notes for Bridge Standard Drawings)
  • Adding guidance for the installation of ASTM F3148 TNA Fixed Spline bolts in EPG 712.1.5 - 712.3.3, Standard Detailing Note H1.8.1 and 1080.1 High Strength Bolts.
July 11, 2025
July 1, 2025
June 17, 2025
June 12, 2025
June 11, 2025
June 10, 2025
May 27, 2025
May 22, 2025
May 14, 2025
  • Updates were made to EPG 824 Litter Pickup to remove Adopt-a-highway, and change it to the Keeping Missouri Beautiful program.
May 13, 2025
May 7, 2025
April 25, 2025
April 14, 2025
  • EPG articles updated to clarify seismic detail requirements for columns, non-oversized drilled shafts (difference between drilled shaft and column diameter is ≤ 12"), oversized drilled shafts (difference between drilled shaft and column diameter is ≥ 18"), spread footings, and pile cap footings:
751.5.9.2.5 Spacing Limits
751.5.9.2.6 Cover Limits
751.9.1.2 LRFD Seismic Details
751.9.3.1.7 T- Joint Connections for LFD
751.11.2.1 Elastomeric Bearings
751.22.2.7 Dowel Bars
751.31.1.2 Rigid Frame- No Tie or Web Beam - 751.31.1.5 Tie Beam with Change in Column Diameter
751.31.2.3 General Design Assumptions
751.31.3.2 Column
751.37.1.6 Drilled Shaft General Detail Considerations
751.37.6.1 Reinforcement Design
751.37.6.2 Longitudinal Reinforcement
751.37.6.4 Transverse Reinforcement,
751.38.8.3.1 Spread Footing Reinforcement
751.39.1 Dimensions
751.39.5 Reinforcement
751.40.8.11.5 T- Joint Connections
751.50_Standard_Detailing_Notes - G1.45
  • Created new Standard Plans for delineators linked in EPG Articles:
620.5.4 Delineator Placement and Spacing (MUTCD Section 3F.04)
620.5.5 Guardrail Delineation, 620.5.6 Barrier Wall Delineation
903.2.25.4 Quantity Computations, 903.17.1 Delineators
903.17.5 Object Markers for Ends of Roadways (MUTCD Section 2C.66)
1044.2.1 Mile and Object Marker, and Delineator Posts
1044.5.1.2 Physical Tests
  • Revised splice and development lengths specified in the following EPG articles in accordance with new AASHTO standards:
751.5.9.2.8 Development and Lap Splices
751.8.3.2 Steel Reinforcement
751.10.1.14 Girder and Beam Haunch Reinforcement
751.12.1.2.7 Details of Mounting Light Poles on Safety Barrier Curbs
751.12.1.3.2 Typical Section Reinforcement
751.12.1.3.3.1 - 751.12.1.3.3.8
751.12.1.4.2 Typical Section Reinforcement
751.12.1.4.3 End of Barrier Reinforcement
751.12.1.6 Type A (32ʺ New Jersey Shaped Median)
751.21.3.3.1 Spread Box Beams
751.21.3.6.3 Reinforcement
751.22.2.3 Flexure
751.22.3.7.2 Reinforcement
751.22.3.8.2 Reinforcement
751.22.3.9.2 Reinforcement
751.22.3.9.3 Closed Diaphragm
751.31.3.1 Beam Cap - 751.31.3.5 Hammer Head Type
751.32.4.1 Typical Pile Cap Bent
751.35.4.1 Wide Flange Beams & Plate Girders
751.35.4.2 Prestressed I-Girders, Bulb-Tee Girders and NU-Girders
751.35.4.3 Wing Reinforcement
751.50 Standard Detailing Notes (Notes H10.8, H10.20, K1.5.1 and K1.5.2)
March 31, 2025
March 19, 2025
  • Adding a new policy in EPG 119 Project Schedules to standardize and centralize the project schedules for every project in the STIP and provide guidelines for how schedules are modified, updated, and communicated throughout the department.
March 18, 2025
March 6, 2025
March 5, 2025
March 4, 2025
February 18, 2025
February 2, 2025
January 31, 2025
January 30, 2025
  • Add a note I1.62 stating that the contractor is responsible for asbestos abatement if they choose to remove the handrail to slip-form the blockout in EPG 751.50 - I1 General.
  • Updated EPG 747.2.3.4 Profile Sheets and 747.2.3.6.3 Additional Information for Railroad Crossings, field shots have been increased to 1,000 ft. each side of structure.
  • Revisions to EPG 136.3.10.1 adds language to allow special road districts to receive soft match credit, and further requires that any agency doing so must be a legally identified politial subdivision in good financial standing.
January 29, 2025
January 28, 2025
January 27, 2025
  • Updated Web Wall guidance in EPG 751.1.2.28 Web Walls to match current practice.
  • Increased minimum specified thickness for polyester polymer concrete from 3/4" to 1" minimum thickness to ensure not less than 3/4" applied in field in EPG 751.1.3.6 Deck Treatment.
January 24, 2025
  • Added EPG 233.5 Intersection Alternatives providing additional guidance about intersection types implemented throughout the state with more context for consideration and comparisons.
  • Added EPG 241.7 Roundabout Aesthetic Structure regarding new policy for determining what is allowed and the submittal/approval processes for roundabout structures on MoDOT right of way.
January 10, 2025
  • Update to EPG 110.1 Wage Rates to provide clarity to who is responsible for running the report.
January 9, 2025
January 3, 2025
  • Updated EPG 141.1 Cost Share Program to reflect the Commission policy change that increased the set aside portion for economic development from 10% to 20%.
  • EPG Fig. 136.4.18 is being revised to include supporting documentation requirements related to consultant travel expenses.
January 2, 2025
December 24, 2024
December 13, 2024
December 12, 2024
December 11, 2024
  • Removed TR17 Traffic Engineering Studies and TR18 Towing Services Agreement from EPG 153.21 Traffic, they are no longer used.
November 27, 2024
  • Added guidance to EPG 109.12.2 Change Order Approval to disallow the practice of contractors typing disclaimers on change orders when they sign.
  • Revised EPG 751.24.2.1 Design to allow wetcast modular wall blocks in splash zones for non-critical structural application.
  • Updated EPG 751.32.4.2 Encased Pile Cap Bent to allow #4 @ 12" (min.) stirrup bars for encased pile cap bents instead of #5 @ 12” (min.).
November 21, 2024
November 20, 2024
  • Updated EPG 108.16 Project Dates the internal process was rearranged so dates flow with life of project. Removed references to actual and projected dates, they are no longer used in AWP software.
October 11, 2024
October 10, 2024
October 9, 2024
September 16, 2024
July 22, 2024
July 18, 2024
July 11, 2024
  • Current armor detail is no longer in production. An optional armor detail is provided in bridge standard drawings. Added a standard note for those drawings to EPG 751.50.
July 3, 2024
July 2, 2024
  • EPG 941.9.8.4 Culvert Pipe updates the terminology of the plastic pipes and updates the guidance on use with driveways.
June 27, 2024
June 21, 2024
June 5, 2024
May 28, 2024
  • EPG 105.15.2 Final Acceptance was updated to clarify the DBE Final Payment Form now serves as the required DBE Participation List and Final Verification.
May 23, 2024
May 16, 2024
May 13, 2024
  • Updated the Missouri Uniform Crash Report Preparation Manual in EPG 907.4.
May 10, 2024
  • EPG 902.15.3.1 has been revised to allow core team to specify signal detection type to be documented with memo in eProjects instead of a design exception.
March 27, 2024
March 14, 2024
January 23, 2024