Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m (EPG 110.2, EPG 1052)
Line 50: Line 50:
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-December, the numbers of hits are:'''
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-December, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[903.6 Warning Signs|EPG 903.6]], 123194 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 173712
+
|'''20.'''  [[903.6 Warning Signs|EPG 903.6]], 123315 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 173765
 
|-
 
|-
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 126871     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 208245
+
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 126897     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 208326
 
|-
 
|-
|'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 132526   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 225528
+
|'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 132545   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 225615
 
|-
 
|-
|'''17.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 134314   ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 251880
+
|'''17.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 134416   ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 251934
 
|-
 
|-
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 138391     ||'''6.'''  [[:Category:100 GENERAL|EPG 100]], 256334
+
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 138419     ||'''6.'''  [[:Category:100 GENERAL|EPG 100]], 256399
 
|-
 
|-
|'''15.'''    [[751.5 Standard Details|EPG 751.5]], 145549     ||'''5.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 264720
+
|'''15.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 145726     ||'''5.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 264814
 
|-
 
|-
|'''14.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 145679     || '''4.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 284007
+
|'''14.'''    [[751.5 Standard Details|EPG 751.5]], 145740     || '''4.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 284039
 
|-
 
|-
|'''13.'''    [[:Category:903 Highway Signing|EPG 903]], 155378   || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 287239
+
|'''13.'''    [[:Category:903 Highway Signing|EPG 903]], 155448   || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 287400
 
|-
 
|-
|'''12.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 156374   ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 338875
+
|'''12.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 156408   ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 339218
 
|-
 
|-
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 162789   ||'''1.''' EPG Main Page, 2193919
+
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 162807   ||'''1.''' EPG Main Page, 2195094
 
|}
 
|}
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Required Notices and Posters|Required Notices and Posters]]'''
 +
 +
12/11/15: Several required posters and notices have been updated, including FHWA Form 1022, OSHA 3165, WH-1420 and the Unemployment Benefit Law.
 +
 +
'''[[:Category:1052 Mechanically Stabilized Earth Wall (MSE) and Sound Wall System Components#1052.2.3.6 Compressive Strength Test|EPG 1052.2.3.6 Compressive Strength Test]]'''
 +
 +
12/11/15: The AASHTO test method name was changed from the now-defunct AASHTO T141 to AASHTO R 60.
 +
 
'''[[147.3 Job Order Contracting (JOC)#JOC JSPs|Job Order Contracting (JOC)]]'''  
 
'''[[147.3 Job Order Contracting (JOC)#JOC JSPs|Job Order Contracting (JOC)]]'''  
  
Line 163: Line 171:
  
 
10/14/15: Guidance now reflects that information now collected is only what is currently needed by Motor Carriers and Bridge Divisions and clarifies when the info should be submitted.  Also, the [[media:760.4.2 Bridge Clearance Report.docx|Bridge Clearance Report form]] was updated.
 
10/14/15: Guidance now reflects that information now collected is only what is currently needed by Motor Carriers and Bridge Divisions and clarifies when the info should be submitted.  Also, the [[media:760.4.2 Bridge Clearance Report.docx|Bridge Clearance Report form]] was updated.
 
'''[[821.25 Products|EPG 821.25 Products]]'''
 
 
10/14/15: [[media:821.25 Milestone General Information 2015.docx|Milestone]] and [[media:821.25 Perspective General Information 2015.docx|Perspective]] information has been revised as a part of the national attention on Monarch butterflies and the general lack of pollinators. 
 
 
'''[[236.3 Administration#236.3.3 Right of Way Plan Review|EPG 236.3.3 Right of Way Plan Review]]'''
 
 
10/13/15: Guidance has been updated to eliminate the need to send a copy of the RW estimate when an A-date is requested. It also eliminates sending a copy of the approved RW plans with the requested A-date.
 

Revision as of 10:08, 11 December 2015

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
New steel beams for the U.S. 69 bridges over the Missouri River connecting Riverside, MO and Kansas City, KS continue to go up after crews finished with the new concrete pillars.
Lehman Construction crews pour concrete on the Rte. 215 bridge over Stockton Lk. in Cedar County. They are replacing the deck on what locals call One Mile Bridge. The nearly $10 million project is expected to be finished by May 2016, prior to the tourist season.
Franklin County Construction employees build the new Osage Beach project office. When completed in March, the new ADA-compliant project office will replace the Camdenton project office.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Sr. Maintenance Worker Billy Barber drives a plow truck during the statewide winter operations drill. The drill tests MoDOT’s preparedness for the upcoming winter season.
Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-December, the numbers of hits are:
20. EPG 903.6, 123315 10. EPG 616, 173765
19. EPG 134, 126897 9. EPG 600, 208326
18. EPG 751.40, 132545 8. EPG 616.23, 225615
17. EPG 751.50, 134416 7. EPG 101, 251934
16. EPG 136.4, 138419 6. EPG 100, 256399
15. EPG 620.2, 145726 5. EPG 700, 264814
14. EPG 751.5, 145740 4. EPG 136.12, 284039
13. EPG 903, 155448 3. EPG 900, 287400
12. EPG 136.9, 156408 2. EPG 751, 339218
11. EPG 200, 162807 1. EPG Main Page, 2195094

Required Notices and Posters

12/11/15: Several required posters and notices have been updated, including FHWA Form 1022, OSHA 3165, WH-1420 and the Unemployment Benefit Law.

EPG 1052.2.3.6 Compressive Strength Test

12/11/15: The AASHTO test method name was changed from the now-defunct AASHTO T141 to AASHTO R 60.

Job Order Contracting (JOC)

12/10/15: Five of the JOC JSPs have been updated. Among the revisions, the unit costs have been fixed for 2016 and storm water compliance and new guardrail requirements have been added.

Federal Involvement

12/8/15: In a number of articles including EPG 128.10 Conceptual Study Report Approval and Submittal and EPG 131.1.3 Projects of Divisional Interest, terminology has been clarified to the current "federal involvement" (instead of "Full Oversight").

Cost Estimate Guide

12/3/15: The latest Cost Estimate Guide for rural preliminary design is available in EPG 104.7 Estimates.

Attachments by Others to MoDOT's Drainage System

11/30/15: Guidance for connections to MoDOT's drainage, as it relates to the MS4 permit, was clarified in EPG 127.25.8.3.2 System Attachments by Others.

NOTICE Plaque (W16-18P)

11/30/15: In both EPG 903.6.59 NOTICE Plaque and EPG 903.5.36 Weight Limit Signs, guidance for the NOTICE plaque has been added for use on bridge weight limit changes as well as an option for other regulatory signs. The plaque helps to emphasize bridge postings that are being lowered.

EPG 941.5 Request by a City to Construct a “WELCOME TO” Monument

11/25/15: The review and approval process was improved by revising when the categorical exclusion request will occur during the city "Welcome To" sign process.

When the Commission holds less than fee simple interest in property

11/25/15: Guidance was clarified for when full disclosure language is needed in quitclaim deeds.

NU Girder Reinforcement

11/24/15: Revised tables and images in EPG 751.5.4.1 Precast P/S Concrete Girders and Beams and EPG 751.22.3.6 Girder Reinforcement to accommodate possible savings using a new NU reinforcement design.

EPG 616.6.2.2 Flags, Advance Warning Rail System and Warning Lights on Signs

11/24/15: The proper use of flags and warning lights on signs in a work zone has been clarified. For projects consisting of nighttime only work, the use of flags is prohibited. Flashing warning lights shall only be used on signs that are post-mounted. The use of flashing warning lights on signs with portable stands is prohibited.

Band Angles

11/24/15: Approved industry-standard band angles allow industry to use an engineered angle when it is financially beneficial.

Route Surveying of Stream Crossings

11/18/15: EPG 238.3.36.3.7 Valley Sections was updated to more closely reflect guidance in HEC-RAS user manual. Guidance for valley sections at stream junctions was also added. In EPG 238.3.36.3.17 Multiple Structures, guidance on Major Streams was replaced with guidance for Multiple Structures (in the same floodplain).

How EPG Guidance is Revised

11/19/15: Proposed revisions to engineering policy are now submitted using the Engineering Policy Revision Request Form. The proposals will be categorized by the Innovation Engineer based on several guidelines.

EPG 1032 Precast Concrete Flared End Sections

11/17/15: Guidance has been updated to allow a concrete pipe manufacturer to use steel fibers in concrete flared end sections instead of standard reinforcing steel.

MoDOT MOU Execution Process

11/6/15: DBE Goals will now be set by project managers or contract administrators on on-call contracts. This replaces the statewide programmatic goal of 13.5% and provides a level playing field for all on-call consultants in the utilization of DBEs.

EPG 236.17 Junkyards

11/4/15: This article has been generally clarified.

EPG 127.25 Maintenance Environmental Policies

10/28/15: Many links were updated along with numerous clarifications.

Alternative Location Proposals

10/27/15: In EPG 236.10.7.3 Alternative Location Proposals, EPG 235.3.4 Right of way as well as the Letter Advertising a Public Hearing, guidance for alternative location proposals has been clarified to reflect current statewide practices.

EPG 127.25.8.2 Lead Mining Chat and EPG 127.22 Off-Site Borrow, Spoil, and Staging Areas

10/23/15: New EPA regulation, applying to 4 counties in SW Missouri, facilitates environmental cleanup.

EPG 238.2.18.6 Recording the Location Survey Plan

10/22/15: The process to complete location survey plan was revised. A reminder mechanism was created to help avoid delays to recording the location survey plans.

EPG 236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions

10/16/15: Guidance for permanent utility easement clauses has been changed to allow the conveyance of utility easements to the utility prior to completion of the project.

Travel Safe Zones

10/15/15: In EPG 907.3.3 Procedure, the Travel Safe Zone procedure was clarified.

TM-54

10/15/15: In EPG 106.3.2.54.7 Field Testing, guidance for the preparation of field test mixture samples was brought into conformance with AASHTO T287.

EPG 760.4.2 Notification Requirements

10/14/15: Guidance now reflects that information now collected is only what is currently needed by Motor Carriers and Bridge Divisions and clarifies when the info should be submitted. Also, the Bridge Clearance Report form was updated.